Supplementary estimates of appropriations

Vote Canterbury Earthquake Recovery - Supplementary Estimates 2013/14

APPROPRIATION MINISTER(S): Minister for Canterbury Earthquake Recovery (M85)

APPROPRIATION ADMINISTRATOR: Canterbury Earthquake Recovery Authority

RESPONSIBLE MINISTER FOR CANTERBURY EARTHQUAKE RECOVERY AUTHORITY: Minister for Canterbury Earthquake Recovery

Supplementary Estimates of Appropriations#

Details of Appropriations#

Annual and Permanent Appropriations

  2013/14
Titles and Scopes of Appropriations by Appropriation Type Estimates
Budget
$000
Supplementary
Estimates
Budget
$000
Total
Budget
$000

Departmental Output Expenses

     

Managing the Recovery (M85)

This appropriation is limited to expenses incurred in managing the recovery from the Canterbury Earthquakes.
50,099 12,666 62,765

Policy Advice (M85)

This appropriation is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the Canterbury Earthquake Recovery.
4,300 1,065 5,365

Red Zone Property Acquisition Costs (M85)

This appropriation is limited to the costs associated with the management of Canterbury Red Zone properties before settlement.
124 1,607 1,731

Total Departmental Output Expenses

54,523 15,338 69,861

Departmental Capital Expenditure

     

Canterbury Earthquake Recovery Authority - Capital Expenditure PLA (M85)

This appropriation is limited to the purchase or development of assets by and for the use of the Canterbury Earthquake Recovery Authority, as authorised by section 24(1) of the Public Finance Act 1989.
- 129 129

Total Departmental Capital Expenditure

- 129 129

Non-Departmental Output Expenses

     

Canterbury Earthquake Property Demolitions and Related Costs and Compensation (M85)

This appropriation is limited to tasks necessary to proceed with and expedite demolitions associated with the Canterbury earthquakes and related compensation to property owners.
5,310 35,959 41,269

Total Non-Departmental Output Expenses

5,310 35,959 41,269

Non-Departmental Other Expenses

     

Acquisition of Canterbury Red Zone properties (M85)

This appropriation is limited to the acquisition of Red Zone properties in Canterbury.
- 66,081 66,081

Construction of Land Slip Removal in the Port Hills (M85)

This appropriation is limited to the construction of land slip removal in Lucas Lane in the Port Hills.
- 1,065 1,065

Contributions towards legal fees (M85)

This appropriation is limited to contributions towards legal fees incurred by property owners in the Red Zones in Canterbury selling properties to the Crown.
287 1,144 1,431

Crown Contribution to Waimakariri District Council's Earthquake Damaged Community Facilities (M85)

This appropriation is limited to contributions for the repair and replacement of earthquake damaged community facilities owned by Waimakariri District Council.
- 7,000 7,000

Red Zone Property Management Costs (M85)

This appropriation is limited to the costs associated with the management of Canterbury Red Zone properties after settlement.
89,574 (52,472) 37,102

Total Non-Departmental Other Expenses

89,861 22,818 112,679

Non-Departmental Capital Expenditure

     

Anchor Project Land Acquisitions (M85)

This appropriation is limited to the acquisition of land and buildings and site clearance for the central city anchor projects.
- 465,086 465,086

Total Non-Departmental Capital Expenditure

- 465,086 465,086

Total Annual and Permanent Appropriations

149,694 539,330 689,024

Multi-Year Appropriations

Type, Title, Scope and Period of Appropriations Appropriation, Adjustments and Use $000

Non-Departmental Other Expenses

   

Anchor Project Development Costs for Te Papa o Ōtākaro / Avon River Precinct (M85)

This appropriation is limited to the development of Te Papa o Ōtākaro / Avon River precinct as part of the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2017

Original Appropriation 90,000
Adjustments for 2012/13 -
Adjustments to 2013/14 23,065
Adjusted Appropriation 113,065
Actual to 2012/13 Year End -
Estimated Actual for 2013/14 11,430
Estimated Actual for 2014/15 93,079
Estimated Appropriation Remaining 8,556

Anchor Project Development Costs for the Bus Interchange (M85)

This appropriation is limited to the development costs of the central city Bus Interchange, two new central city interchange stops on Manchester Street and by the Hospital, development of new bus lanes and two suburban interchanges as part of the central city anchor projects.

Commences: 01 October 2013

Expires: 30 June 2017

Original Appropriation 52,400
Adjustments for 2012/13 -
Adjustments to 2013/14 -
Adjusted Appropriation 52,400
Actual to 2012/13 Year End -
Estimated Actual for 2013/14 4,600
Estimated Actual for 2014/15 33,800
Estimated Appropriation Remaining 14,000

Anchor Project Development Costs for the City Frame (M85)

This appropriation is limited to the development of the City Frame as part of the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2017

Original Appropriation 71,000
Adjustments for 2012/13 -
Adjustments to 2013/14 (11,664)
Adjusted Appropriation 59,336
Actual to 2012/13 Year End -
Estimated Actual for 2013/14 6,848
Estimated Actual for 2014/15 42,142
Estimated Appropriation Remaining 10,346

Anchor Project Development Costs for the Convention Centre (M85)

This appropriation is limited to the development of the Convention Centre as part of the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2017

Original Appropriation 7,000
Adjustments for 2012/13 -
Adjustments to 2013/14 1,967
Adjusted Appropriation 8,967
Actual to 2012/13 Year End -
Estimated Actual for 2013/14 1,640
Estimated Actual for 2014/15 7,327
Estimated Appropriation Remaining -

Anchor Project Development Costs for the Metro Sports Facility (M85)

This appropriation is limited to the development of the Metro Sports Facility as part of the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2017

Original Appropriation 9,000
Adjustments for 2012/13 -
Adjustments to 2013/14 984
Adjusted Appropriation 9,984
Actual to 2012/13 Year End -
Estimated Actual for 2013/14 2,204
Estimated Actual for 2014/15 7,780
Estimated Appropriation Remaining -

Anchor Project Development Costs for the Transport Plan (M85)

This appropriation is limited to the development and implementation of the Transport Plan as part of the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2016

Original Appropriation 12,000
Adjustments for 2012/13 -
Adjustments to 2013/14 (11,000)
Adjusted Appropriation 1,000
Actual to 2012/13 Year End -
Estimated Actual for 2013/14 1,000
Estimated Actual for 2014/15 -
Estimated Appropriation Remaining -

Canterbury Earthquake Memorial (M85)

This appropriation is limited to the development of the Canterbury Earthquake Memorial as part of the central city anchor projects.

Commences: 01 May 2014

Expires: 30 June 2017

Original Appropriation 10,000
Adjustments for 2012/13 -
Adjustments to 2013/14 -
Adjusted Appropriation 10,000
Actual to 2012/13 Year End -
Estimated Actual for 2013/14 -
Estimated Actual for 2014/15 8,000
Estimated Appropriation Remaining 2,000

Holding Costs for Land Acquired for Anchor Projects (M85)

This appropriation is limited to the management of the land acquired for the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2017

Original Appropriation 19,000
Adjustments for 2012/13 -
Adjustments to 2013/14 866
Adjusted Appropriation 19,866
Actual to 2012/13 Year End -
Estimated Actual for 2013/14 9,866
Estimated Actual for 2014/15 10,000
Estimated Appropriation Remaining -

Impairment of Improvements (M85)

This appropriation is limited to the impairment of improvements purchased in conjunction with the land acquisition programme for the anchor projects.

Commences: 01 May 2014

Expires: 30 June 2017

Original Appropriation 51,000
Adjustments for 2012/13 -
Adjustments to 2013/14 -
Adjusted Appropriation 51,000
Actual to 2012/13 Year End -
Estimated Actual for 2013/14 51,000
Estimated Actual for 2014/15 -
Estimated Appropriation Remaining -

Implementation of transport solutions to deliver An Accessible City in Christchurch (M85)

This appropriation is limited to the development and implementation of the accessible city chapter of the Christchurch Central Recovery Plan as part of the central city anchor projects.

Commences: 01 May 2014

Expires: 30 June 2016

Original Appropriation 75,000
Adjustments for 2012/13 -
Adjustments to 2013/14 -
Adjusted Appropriation 75,000
Actual to 2012/13 Year End -
Estimated Actual for 2013/14 2,200
Estimated Actual for 2014/15 45,446
Estimated Appropriation Remaining 27,354

Details of Projected Movements in Departmental Net Assets#

Canterbury Earthquake Recovery Authority

Details of Net Asset Schedule 2013/14
Main Estimates Projections
$000
2013/14
Supplementary Estimates Projections
$000
Explanation of Projected Movements in 2013/14
Opening Balance 2,150 2,150 Supplementary Estimates opening balance reflects the audited results as at 30 June 2013.
Capital Injections - -  
Capital Withdrawals - -  
Surplus to be Retained (Deficit Incurred) - -  
Other Movements - -  

Closing Balance

2,150 2,150  

Supporting Information#

Part 1 - Vote as a Whole#

1.2 - Trends in the Vote

Summary of Financial Activity

  2013/14
    Supplementary Estimates  
  Estimates
$000
Departmental
Transactions
$000
Non-Departmental
Transactions
$000
Total
Transactions
$000
Total
$000

Appropriations

         
Output Expenses 59,833 15,338 35,959 51,297 111,130
Benefits and Other Unrequited Expenses - N/A - - -
Borrowing Expenses - - - - -
Other Expenses 200,601 - 2,866 2,866 203,467
Capital Expenditure - 129 465,086 465,215 465,215
Intelligence and Security Department Expenses and Capital Expenditure - - N/A - -
Multi-Category Expenses and Capital Expenditure (MCA)          
Output Expenses
- - - - -
Other Expenses
- - - - -
Capital Expenditure
- N/A - - -

Total Appropriations

260,434 15,467 503,911 519,378 779,812

Crown Revenue and Capital Receipts

         
Tax Revenue - N/A - - -
Non-Tax Revenue 561,110 N/A 38,551 38,551 599,661
Capital Receipts - N/A - - -

Total Crown Revenue and Capital Receipts

561,110 N/A 38,551 38,551 599,661

Mapping the Layout of the 2013/14 Supplementary Estimates to the Layout of the 2013/14 Estimates

Supplementary Estimates Structure 2013/14 Estimates Structure 2013/14
Part # Part Name Part # Part Name
2.1 Departmental Output Expenses 2.1 Departmental Output Expenses
2.2 Departmental Other Expenses 5.1 Departmental Other Expenses
2.3 Departmental Capital Expenditure and Capital Injections 6.1 Departmental Capital Expenditure
3.1 Non-Departmental Output Expenses 2.2 Non-Departmental Output Expenses
3.2 Non-Departmental Benefits and Other Unrequited Expenses 3.2 Non-Departmental Benefits and Other Unrequited Expenses
3.3 Non-Departmental Borrowing Expenses 4.2 Non-Departmental Borrowing Expenses
3.4 Non-Departmental Other Expenses 5.2 Non-Departmental Other Expenses
3.5 Non-Departmental Capital Expenditure 6.2 Non-Departmental Capital Expenditure
4 Multi-Category Expenses and Capital Expenditure N/A Did not exist in the Estimates

Part 2 - Details of Departmental Appropriations#

2.1 - Departmental Output Expenses

Managing the Recovery (M85)

Scope of Appropriation

This appropriation is limited to expenses incurred in managing the recovery from the Canterbury Earthquakes.

Expenses and Revenue

  2013/14
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 50,099 12,666 62,765
Revenue from the Crown 49,099 12,666 61,765
Revenue from Others 1,000 - 1,000

Reasons for Change in Appropriation

A review of the order of strategic priorities resulted in changes to the timing of the delivery CERA's detailed work programme. This generated a need to move project resources, including transferring appropriations from 2012/13 to 2013/14, to match revised delivery profile.

Policy Advice (M85)

Scope of Appropriation

This appropriation is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the Canterbury Earthquake Recovery.

Expenses and Revenue

  2013/14
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 4,300 1,065 5,365
Revenue from the Crown 4,300 1,065 5,365
Revenue from Others - - -

Reasons for Change in Appropriation

$250,000 has been transferred out from this appropriation to provide funding for Department of the Prime Minister and Cabinet's short-term role as coordinator for government work on Canterbury Insurance issues.

A review of the order of strategic priorities resulted in changes to the timing of the delivery CERA's detailed work programme. This generated a need to move project resources, including transferring appropriations from 2012/13 to 2013/14, to match revised delivery profile.

Red Zone Property Acquisition Costs (M85)

Scope of Appropriation

This appropriation is limited to the costs associated with the management of Canterbury Red Zone properties before settlement.

Expenses and Revenue

  2013/14
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Total Appropriation 124 1,607 1,731
Revenue from the Crown 124 1,607 1,731
Revenue from Others - - -

Reasons for Change in Appropriation

The transfer of appropriation from 2012/13 to 2013/14 reflects the delays experienced in 2012/13 in the acquisition of properties in the residential red zone in particular the timing of critical policy decisions relating flat land and Port Hills properties.

2.3 - Departmental Capital Expenditure and Capital Injections

Canterbury Earthquake Recovery Authority - Capital Expenditure PLA (M85)

Scope of Appropriation

This appropriation is limited to the purchase or development of assets by and for the use of the Canterbury Earthquake Recovery Authority, as authorised by section 24(1) of the Public Finance Act 1989.

Capital Expenditure

  2013/14
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Forests/Agricultural - - -
Land - - -
Property, Plant and Equipment - 129 129
Intangibles - - -
Other - - -

Total Appropriation

- 129 129

Reasons for Change in Appropriation

The purchase of additional property, plant and equipment has resulted in an increase in the capital expenditure in the current year.

Capital Injections and Movements in Departmental Net Assets

Canterbury Earthquake Recovery Authority

Details of Net Asset Schedule 2013/14
Main Estimates Projections
$000
2013/14
Supplementary Estimates Projections
$000
Explanation of Projected Movements in 2013/14
Opening Balance 2,150 2,150 Supplementary Estimates opening balance reflects the audited results as at 30 June 2013.
Capital Injections - -  
Capital Withdrawals - -  
Surplus to be Retained (Deficit Incurred) - -  
Other Movements - -  

Closing Balance

2,150 2,150  

Part 3 - Details of Non-Departmental Appropriations#

3.1 - Non-Departmental Output Expenses

Canterbury Earthquake Property Demolitions and Related Costs and Compensation (M85)

Scope of Appropriation

This appropriation is limited to tasks necessary to proceed with and expedite demolitions associated with the Canterbury earthquakes and related compensation to property owners.

Expenses

  2013/14
  Estimates
$000
Supplementary Estimates
$000
Total
$000
Total Appropriation 5,310 35,959 41,269

Reasons for Change in Appropriation

The increase in 2013/14 appropriation reflects the timing of the demolition of residential red zone properties delayed in 2012/13. A number of factors have contributed to delays in the demolition programme including decisions on removals, disconnection of services, insurance company recoveries and demolition logistics.

This appropriation will be replaced in 2014/15 by a multi-year appropriation since demolition of properties in Residential Red Zone is a multi-year programme and any remaining appropriation will be transferred to 2014/15 on completion of the Annual Report.

3.4 - Non-Departmental Other Expenses

Acquisition of Canterbury Red Zone properties (M85)

Scope of Appropriation

This appropriation is limited to the acquisition of Red Zone properties in Canterbury.

Expenses

  2013/14
  Estimates
$000
Supplementary Estimates
$000
Total
$000
Total Appropriation - 66,081 66,081

How Performance will be Assessed and End of Year Reporting Requirements

  2013/14
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Ensuring that Crown conveyancers are adequately funded to undertake settlements Settlements are completed in a timely manner Settlements are completed in a timely manner Settlements are completed in a timely manner with a total of 7,130 settlements completed

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation as an annex to the Annual Report for the Canterbury Earthquake Recovery Authority.

Reasons for Change in Appropriation

The increase in appropriation reflects the transfer of underspend from 2012/13 to 2013/14 for the costs associated with the acquisition of properties arising from zoning changes of red zone properties on the flat lands and Port Hills that were delayed.

The transfer of appropriation between years reflects the timing of the announcements of red zoning policy decisions and the projected settlement of the properties.

Anchor Project Development Costs for Te Papa o Ōtākaro / Avon River Precinct (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Anchor Project Development Costs for Te Papa o Ōtākaro / Avon River Precinct (M85)

This appropriation is limited to the development of Te Papa o Ōtākaro / Avon River precinct as part of the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2017
Original Appropriation 90,000
Adjustments to 2012/13 -
Adjustments for 2013/14 23,065
Adjusted Appropriation 113,065
Actual to 2012/13 Year End -
Estimated Actual for 2013/14 11,430
Estimated Actual for 2014/15 93,079
Estimated Appropriation Remaining 8,556

Reasons for Change in Appropriation

The inclusion of the site for the future Margaret Mahy children's playground and associated works into the Avon River redevelopment programme has resulted in the transfer for funding from the City Frame anchor project to the Avon River anchor project.

Anchor Project Development Costs for the Bus Interchange (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Anchor Project Development Costs for the Bus Interchange (M85)

This appropriation is limited to the development costs of the central city Bus Interchange, two new central city interchange stops on Manchester Street and by the Hospital, development of new bus lanes and two suburban interchanges as part of the central city anchor projects.

Commences: 01 October 2013

Expires: 30 June 2017
Original Appropriation 52,400
Adjustments to 2012/13 -
Adjustments for 2013/14 -
Adjusted Appropriation 52,400
Actual to 2012/13 Year End -
Estimated Actual for 2013/14 4,600
Estimated Actual for 2014/15 33,800
Estimated Appropriation Remaining 14,000

How Performance will be Assessed and End of Year Reporting Requirements

  2013/14
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Delivery of the Christchurch Bus Interchange New Measure Early construction works commenced Early construction works commenced and main contractor identified

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation as an annex to the Annual Report for the Canterbury Earthquake Recovery Authority.

Reasons for Change in Appropriation

This is a new appropriation in 2013/14 and represents the gross cost of development of the Bus Interchange including contributions from recovery partners.

Anchor Project Development Costs for the City Frame (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Anchor Project Development Costs for the City Frame (M85)

This appropriation is limited to the development of the City Frame as part of the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2017
Original Appropriation 71,000
Adjustments to 2012/13 -
Adjustments for 2013/14 (11,664)
Adjusted Appropriation 59,336
Actual to 2012/13 Year End -
Estimated Actual for 2013/14 6,848
Estimated Actual for 2014/15 42,142
Estimated Appropriation Remaining 10,346

Reasons for Change in Appropriation

The inclusion of the site for the future Margaret Mahy children's playground and associated works into the Avon River redevelopment programme has resulted in the transfer for funding from the City Frame anchor project to the Avon River anchor project.

Anchor Project Development Costs for the Convention Centre (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Anchor Project Development Costs for the Convention Centre (M85)

This appropriation is limited to the development of the Convention Centre as part of the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2017
Original Appropriation 7,000
Adjustments to 2012/13 -
Adjustments for 2013/14 1,967
Adjusted Appropriation 8,967
Actual to 2012/13 Year End -
Estimated Actual for 2013/14 1,640
Estimated Actual for 2014/15 7,327
Estimated Appropriation Remaining -

Reasons for Change in Appropriation

The funding for the development of the Christchurch Convention Centre business case and assessment of options arising from the business case was transferred from 2012/13 to 2013/14 due to the delays in the options analysis of the business case.

Anchor Project Development Costs for the Metro Sports Facility (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Anchor Project Development Costs for the Metro Sports Facility (M85)

This appropriation is limited to the development of the Metro Sports Facility as part of the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2017
Original Appropriation 9,000
Adjustments to 2012/13 -
Adjustments for 2013/14 984
Adjusted Appropriation 9,984
Actual to 2012/13 Year End -
Estimated Actual for 2013/14 2,204
Estimated Actual for 2014/15 7,780
Estimated Appropriation Remaining -

Reasons for Change in Appropriation

The funding for the development of the Metro Sports Facility business case and assessment of options arising from the business case was transferred from 2012/13 to 2013/14 due to the delays in the preparation and options analysis of the business case.

Anchor Project Development Costs for the Transport Plan (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Anchor Project Development Costs for the Transport Plan (M85)

This appropriation is limited to the development and implementation of the Transport Plan as part of the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2016
Original Appropriation 12,000
Adjustments to 2012/13 -
Adjustments for 2013/14 (11,000)
Adjusted Appropriation 1,000
Actual to 2012/13 Year End -
Estimated Actual for 2013/14 1,000
Estimated Actual for 2014/15 -
Estimated Appropriation Remaining -

Reasons for Change in Appropriation

A review of the outcome associated with the Transport Chapter of the An Accessible City plan has resulted in the establishment of a new appropriation "Implementation of transport solutions to deliver An Accessible City in Christchurch" that more accurately describes the scope of the works to be undertaken.

Canterbury Earthquake Memorial (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Canterbury Earthquake Memorial (M85)

This appropriation is limited to the development of the Canterbury Earthquake Memorial as part of the central city anchor projects.

Commences: 01 May 2014

Expires: 30 June 2017
Original Appropriation 10,000
Adjustments to 2012/13 -
Adjustments for 2013/14 -
Adjusted Appropriation 10,000
Actual to 2012/13 Year End -
Estimated Actual for 2013/14 -
Estimated Actual for 2014/15 8,000
Estimated Appropriation Remaining 2,000

How Performance will be Assessed and End of Year Reporting Requirements

  2013/14
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Development of Canterbury Earthquake Memorial New measure New measure Plans for the memorial finalised by 30 June 2015

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation as an annex to the Annual Report for the Canterbury Earthquake Recovery Authority.

Service Providers

  2013/14    
Provider Estimates
$000
Supplementary
Estimates
$000
Total
$000
Reporting to the
House
Expiry of
Resourcing
Commitment
Lead contractor for the development of the Canterbury Earthquake Memorial project is yet to be appointed. - - - See above 2016/17

Reasons for Change in Appropriation

The is a new multi-year appropriation established in 2013/14 to support the development of a suitable commemorative memorial following the earthquakes in Canterbury that affected many people, locally, nationally and internationally.

Construction of Land Slip Removal in the Port Hills (M85)

Scope of Appropriation

This appropriation is limited to the construction of land slip removal in Lucas Lane in the Port Hills.

Expenses

  2013/14
  Estimates
$000
Supplementary Estimates
$000
Total
$000
Total Appropriation - 1,065 1,065

Reasons for Change in Appropriation

The increase in this appropriation reflects the transfer of appropriation from 2012/13 to 2013/14 to cover the delay in the construction benches, drainage and associated ground works relating to the land slip in Lucas Lane in the Port Hills.

Contributions towards legal fees (M85)

Scope of Appropriation

This appropriation is limited to contributions towards legal fees incurred by property owners in the Red Zones in Canterbury selling properties to the Crown.

Expenses

  2013/14
  Estimates
$000
Supplementary Estimates
$000
Total
$000
Total Appropriation 287 1,144 1,431

Reasons for Change in Appropriation

The increase in this appropriation reflects the transfer of funding from 2012/13 to 2013/14 to cover the delays experienced in the acquisition of properties in the Port Hills and remaining flat lands partly due to timing of critical policy decisions and the outcome of legal proceedings.

Crown Contribution to Waimakariri District Council's Earthquake Damaged Community Facilities (M85)

Scope of Appropriation

This appropriation is limited to contributions for the repair and replacement of earthquake damaged community facilities owned by Waimakariri District Council.

Expenses

  2013/14
  Estimates
$000
Supplementary Estimates
$000
Total
$000
Total Appropriation - 7,000 7,000

How Performance will be Assessed and End of Year Reporting Requirements

  2013/14
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Payment to Waimakariri District Council verified and authorised New Measure Payment made to Waimakariri District Council Payment made to Waimakariri District Council

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation as an annex to the Annual Report for the Canterbury Earthquake Recovery Authority.

Service Providers

  2013/14    
Provider Estimates
$000
Supplementary
Estimates
$000
Total
$000
Reporting to the
House
Expiry of
Resourcing
Commitment
Waimakariri District Council - 7,000 7,000 See above 2013/14

Reasons for Change in Appropriation

The increase of this appropriation reflects a new policy decision of Crown to make a contribution of $7 million to the repair and rebuild of the earthquake-damaged community facilities within the region administered by the Waimakariri District Council.

Holding Costs for Land Acquired for Anchor Projects (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Holding Costs for Land Acquired for Anchor Projects (M85)

This appropriation is limited to the management of the land acquired for the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2017
Original Appropriation 19,000
Adjustments to 2012/13 -
Adjustments for 2013/14 866
Adjusted Appropriation 19,866
Actual to 2012/13 Year End -
Estimated Actual for 2013/14 9,866
Estimated Actual for 2014/15 10,000
Estimated Appropriation Remaining -

Reasons for Change in Appropriation

The increase in this appropriation reflects the transfer of funding from 2012/13 to 2013/14 of the unspent portion of funding following the audit of 2012/13 Annual Report.

Impairment of Improvements (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Impairment of Improvements (M85)

This appropriation is limited to the impairment of improvements purchased in conjunction with the land acquisition programme for the anchor projects.

Commences: 01 May 2014

Expires: 30 June 2017
Original Appropriation 51,000
Adjustments to 2012/13 -
Adjustments for 2013/14 -
Adjusted Appropriation 51,000
Actual to 2012/13 Year End -
Estimated Actual for 2013/14 51,000
Estimated Actual for 2014/15 -
Estimated Appropriation Remaining -

How Performance will be Assessed and End of Year Reporting Requirements

  2013/14
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Crown accounts reflect generally accepted account practices in the treatment of potential loss on sale of assets New measure New measure Meets generally accepted accounting practices

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation as an annex to the Annual Report for the Canterbury Earthquake Recovery Authority.

Service Providers

  2013/14    
Provider Estimates
$000
Supplementary
Estimates
$000
Total
$000
Reporting to the
House
Expiry of
Resourcing
Commitment
This is a technical appropriation arising from generally accepted accounting practice and does not result in a cash flow to a provider. - 51,000 51,000 See above 2016/17

Reasons for Change in Appropriation

This is a new multi-year appropriation established in 2013/14 in order to ensure adequate provision is made for the future impairment of Crown assets likely to be demolished as part of the Christchurch Central Recovery Plan.

Implementation of transport solutions to deliver An Accessible City in Christchurch (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Implementation of transport solutions to deliver An Accessible City in Christchurch (M85)

This appropriation is limited to the development and implementation of the accessible city chapter of the Christchurch Central Recovery Plan as part of the central city anchor projects.

Commences: 01 May 2014

Expires: 30 June 2016
Original Appropriation 75,000
Adjustments to 2012/13 -
Adjustments for 2013/14 -
Adjusted Appropriation 75,000
Actual to 2012/13 Year End -
Estimated Actual for 2013/14 2,200
Estimated Actual for 2014/15 45,446
Estimated Appropriation Remaining 27,354

How Performance will be Assessed and End of Year Reporting Requirements

  2013/14
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Construction of flexible traffic flows and other solutions (includes cycle lanes and pedestrian friendly zones) New measure New measure Designs for transport solutions completed and majority of construction completed by June 2015
Construction of Manchester Street and Hospital super stops New measure New measure Construction completed by May 2015

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation as an annex to the Annual Report for the Canterbury Earthquake Recovery Authority.

Service Providers

  2013/14    
Provider Estimates
$000
Supplementary
Estimates
$000
Total
$000
Reporting to the
House
Expiry of
Resourcing
Commitment
The appointment of the lead contractor for the construction of revised traffic solutions has not been finalised. - - 2,200 See above 2015/16

Reasons for Change in Appropriation

This is a new multi-year appropriation established in 2013/14 for the development and implementation of the accessible city chapter of the Christchurch Central Recovery Plan.

Red Zone Property Management Costs (M85)

Scope of Appropriation

This appropriation is limited to the costs associated with the management of Canterbury Red Zone properties after settlement.

Expenses

  2013/14
  Estimates
$000
Supplementary Estimates
$000
Total
$000
Total Appropriation 89,574 (52,472) 37,102

Reasons for Change in Appropriation

This appropriation covers a number of significant work streams post settlement of the acquisition red zone properties. Included in the work streams are process management and documentation, insurance recoveries and land management including site clearance. The increase in appropriation in 2013/14 reflects the delays experienced in 2012/13 of the site clearance works post demolition of residential red zone properties. A number of factors have contributed to delays in the clearance programme including access sites managed by third party insurance companies.

A multi-year appropriation has been established from 2014/15 to enable the effective management of the funding for the red zone property management programme.

3.5 - Non-Departmental Capital Expenditure

Anchor Project Land Acquisitions (M85)

Scope of Appropriation

This appropriation is limited to the acquisition of land and buildings and site clearance for the central city anchor projects.

Capital Expenditure

  2013/14
  Estimates
$000
Supplementary Estimates
$000
Total
$000
Total Appropriation - 465,086 465,086

 

How Performance will be Assessed and End of Year Reporting Requirements

  2013/14
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard
Anchor Project Land Acquisition Land acquisition strategy developed and work programme commenced Land acquisition strategy developed and work programme commenced Land acquisition strategy developed with 60% of area needed for anchor projects settled and work programme commenced

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation as an annex to the Annual Report for the Canterbury Earthquake Recovery Authority.

Reasons for Change in Appropriation

Delays in 2012/13 with the purchase of properties for the development of the anchor projects resulted in a transfer of appropriation from 2012/13 to 2013/14 to match likely future settlement dates.