Formats and related files
MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister of Transport (M72)
ADMINISTERING DEPARTMENT: Ministry of Transport
MINISTER RESPONSIBLE FOR MINISTRY OF TRANSPORT: Minister of Transport
Details of Appropriations#
Details of Annual and Permanent Appropriations
2011/12 | |||
---|---|---|---|
Titles and Scopes of Appropriations by Appropriation Type | Estimates Budget $000 |
Supplementary Estimates Budget $000 |
Total Budget $000 |
Departmental Output Expenses |
|||
Fuel Excise Duty Refund Administration (M72)This appropriation is limited to the receipt and processing of applications for, and the refunding of, Fuel Excise Duty. |
429 | - | 429 |
Governance and Performance Advice for Crown Agencies (M72)This appropriation is limited to monitoring of and advice on the governance, performance and capability of transport Crown agencies. |
1,400 | (650) | 750 |
Land Transport Revenue Forecasting and Strategy (M72)This appropriation is limited to land transport revenue forecasting, strategy and policy. |
1,000 | 550 | 1,550 |
Milford Sound / Piopiotahi Aerodrome Operation and Administration (M72)This appropriation is limited to the operation of Milford Sound/Piopiotahi aerodrome to provide a safe and efficient airport. |
200 | 23 | 223 |
Policy Advice (M72)This appropriation is limited to strategic, objective and evidence based policy advice that will promote the development of an effective and efficient transport system, and ministerial servicing. |
30,118 | (1,030) | 29,088 |
Road User Charges Collection, Investigation and Enforcement (M72)This appropriation is limited to the collection and refund of Road User Charges, and the investigation and enforcement of evasion of Road User Charges. |
17,855 | 974 | 18,829 |
Search and Rescue Activity Coordination PLA (M72)The estimated amount to be spent on the coordination of search and rescue activities as authorised by section 9(1) of Land Transport Management Act 2003. |
1,136 | - | 1,136 |
Total Departmental Output Expenses |
52,138 | (133) | 52,005 |
Non-Departmental Output Expenses |
|||
Accident or Incident Investigation and Reporting (M72)This appropriation is limited to investigation and reporting on aviation, rail and marine accidents and incidents in New Zealand and the waters over which it has jurisdiction. |
3,865 | - | 3,865 |
Canterbury Transport Project (M72)This appropriation is limited to assisting the Canterbury region to implement a land transport package. |
5,000 | - | 5,000 |
Licensing Activities (M72)This appropriation is limited to land transport licensing services, including driver licensing, not met by user fees. |
2,475 | 200 | 2,675 |
Maritime Port Security (M72)This appropriation is limited to standby screening and searching services at ports. |
145 | - | 145 |
Ministerial Servicing by the New Zealand Transport Agency (M72)This appropriation is limited to Ministerial servicing by the New Zealand Transport Agency. |
548 | - | 548 |
Motor Vehicle Registry (M72)This appropriation is limited to the registration and licensing of motor vehicles, the collection and refund of motor vehicle registration and licensing revenue, and the operation of the Motor Vehicle Register. |
40,016 | 7,950 | 47,966 |
National Land Transport Programme PLA (M72)The estimated amount to be spent on activities under the National Land Transport Programme, as authorised by section 9 (3) and (4) of the Land Transport Management Act 2003. |
1,792,653 | (49,853) | 1,742,800 |
Policy Advice - Civil Aviation (M72)This appropriation is limited to policy advice on civil aviation safety, development of safety standards, promotion and auditing of aviation security, review of legislation, and administration of New Zealand's participation in ICAO and other safety related agreements. |
2,219 | - | 2,219 |
Policy Advice on Safety Regulation and Monitoring - Maritime (M72)This appropriation is limited to policy advice on maritime safety, development of safety standards, promotion and auditing of maritime safety, and the review of legislation. |
5,689 | 1,543 | 7,232 |
Rail - Waikato Network Funding (M72)This appropriation is limited to rail projects which improve the capacity and connections of rail freight in the Waikato region. |
5,415 | (1,591) | 3,824 |
Regional Development Transport Funding (M72)This appropriation is limited to regional development initiatives to develop the forestry roading infrastructure in Northland and Tairawhiti. |
2,000 | - | 2,000 |
Reinstatement of Local Roads in Canterbury (M72)This appropriation is limited to the reinstatement of local roads in Canterbury following the earthquakes as approved by the New Zealand Transport Agency under relevant legislation. |
- | 102,000 | 102,000 |
Search and Rescue Activities (M72)This appropriation is limited to the purchase of search and rescue activities and a search and rescue coordination service, including follow-up inquiries and reporting, associated with the searches and rescues undertaken. |
3,274 | 42 | 3,316 |
Search and Rescue and Recreational Boating Safety Activities PLA (M72)The estimated amount to be spent in relation to search and rescue and recreational boating safety activities, as authorised under Section 9 (1) of the Land Transport Management Act 2003. |
4,473 | - | 4,473 |
SuperGold Card - Administration of the Public Transport Concessions Scheme (M72)This appropriation is limited to the administration costs of the scheme to provide enhanced public transport concessions for SuperGold cardholders. |
95 | - | 95 |
Weather Forecasts and Warnings (M72)This appropriation is limited to severe-weather warnings and a level of weather forecast services for land, coastal waters and oceanic areas for which New Zealand has international responsibility. |
18,574 | - | 18,574 |
Total Non-Departmental Output Expenses |
1,886,441 | 60,291 | 1,946,732 |
Non-Departmental Other Expenses |
|||
Bad Debt Provision - Motor Vehicle Registration/Licenses and Road User Charges (M72)This appropriation is limited to provision for bad debts that arise from non payment of motor vehicle registrations and road user charges. |
6,000 | 1,000 | 7,000 |
Loan for Auckland Metro Rail Electric Multiple Unit Package Fair Value Write-down (M72)This appropriation is limited to fair value write-downs of Crown debt associated with the Auckland Metro Rail Electric Multiple Unit Package, in accordance with International Financial Reporting Standards. |
- | 50,600 | 50,600 |
Membership of International Organisations (M72)This appropriation is limited to non-discretionary payments to international transport related organisations. |
743 | - | 743 |
Rail - Metro Rail Rolling Stock and Infrastructure (Wellington) (M72)This appropriation is limited to metro rail rolling stock and infrastructure projects in Wellington. |
80,000 | 37,442 | 117,442 |
Rail - Public Policy Projects (M72)This appropriation is limited to public policy rail initiatives. |
3,270 | - | 3,270 |
Rail - Railway Safety (M72)This appropriation is limited to public safety works. |
500 | - | 500 |
SuperGold Card - public transport concessions for cardholders (M72)This appropriation is limited to providing enhanced public transport concessions for SuperGold cardholders. |
22,905 | - | 22,905 |
Tauranga Maritime Incident Response (M72)This appropriation is limited to responding to the MV Rena grounding off Tauranga. |
- | 35,000 | 35,000 |
Total Non-Departmental Other Expenses |
113,418 | 124,042 | 237,460 |
Departmental Capital Expenditure |
|||
Ministry of Transport - Capital Expenditure PLA (M72)This appropriation is limited to the purchase or development of assets by and for the use of the Ministry of Transport, as authorised by section 24(1) of the Public Finance Act 1989. |
750 | (447) | 303 |
Total Departmental Capital Expenditure |
750 | (447) | 303 |
Non-Departmental Capital Expenditure |
|||
Aviation Security Service (M72)This appropriation is limited to meeting the ongoing capital costs of the security measures under international and domestic obligations, including accommodation and IT systems. |
303 | - | 303 |
National Land Transport Programme - New Infrastructure for and Renewal of State Highways PLA (M72)The estimated amount to be spent on capital works for new infrastructure and renewal of State Highways, as authorised by Section 9 (3) and (4) of the Land Transport Management Act 2003. |
671,134 | (45,473) | 625,661 |
New & Improved Infrastructure for State Highways - Crown Contribution (M72)This appropriation is limited to contributing towards the purchase of State highway improvements as outlined in the 2006/07 State Highway Forecast. |
529 | 3,397 | 3,926 |
NLTF Borrowing Facility for a Short-Term Advance in 2011/12. (M72)This appropriation is limited to a short-term advance to the New Zealand Transport Agency to manage variations between cash outlays from and flows of hypothecated revenue into the National Land Transport Fund with a maximum balance outstanding of $90 million. |
- | 180,000 | 180,000 |
NLTF Borrowing Facility for Short-Term Advances (M72)This appropriation is limited to short-term advances to the New Zealand Transport Agency to manage variations between cash outlays from and flows of hypothecated revenue into the National Land Transport Fund, with the maximum amount of such advances at any one time not exceeding $250 million. |
750,000 | - | 750,000 |
Rail - KiwiRail Turnaround Plan Funding (M72)This appropriation is limited to approved capital expenditure that contributes to the KiwiRail Turnaround Plan outcomes. |
250,000 | - | 250,000 |
Rail - Loan for Auckland Metro Rail Electric Multiple Unit Package (M72)This appropriation is limited to a loan for the Auckland metro rail electric multiple unit package. |
- | 200,000 | 200,000 |
Rail - New Zealand Railways Corporation Loans (M72)This appropriation is limited to loans to the New Zealand Railways Corporation to fund capital projects and provide working capital. |
330,769 | (80,769) | 250,000 |
Wellington Metro Rail Network Upgrade (M72)The appropriation is limited to catch up investment in the Wellington metro rail network which will enable sustainable operation of the network through the Metro Rail Operating model. |
8,552 | 3,161 | 11,713 |
Total Non-Departmental Capital Expenditure |
2,011,287 | 260,316 | 2,271,603 |
Total Annual and Permanent Appropriations |
4,064,034 | 444,069 | 4,508,103 |
Details of Multi-Year Appropriations#
Type, Title, Scope and Period of Appropriations | Appropriation, Adjustments and Use | $000 |
---|---|---|
Non-Departmental Other Expenses |
||
Auckland Rail Development (M72)This appropriation is limited to the renewal, upgrade, and electrification of the Auckland metropolitan rail network. Commences: 1 July 2009 Expires: 30 June 2014 |
Original Appropriation | 663,875 |
Adjustments for 2010/11 | 19,722 | |
Adjustments to 2011/12 | (20,000) | |
Adjusted Appropriation | 663,597 | |
Actual to 2010/11 Year End | 350,158 | |
Estimated Actual for 2011/12 | 133,686 | |
Estimated Actual for 2012/13 | 152,106 | |
Estimated Appropriation Remaining | 27,647 | |
Rail Network and Rolling Stock Upgrade (M72)This appropriation is limited to the renewal, upgrade and maintenance of the national rail network, and the New Zealand Railway Corporations rolling stock, terminals and systems. Commences: 1 July 2009 Expires: 30 June 2012 |
Original Appropriation | 104,851 |
Adjustments for 2010/11 | 6,980 | |
Adjustments to 2011/12 | - | |
Adjusted Appropriation | 111,831 | |
Actual to 2010/11 Year End | 101,684 | |
Estimated Actual for 2011/12 | 10,147 | |
Estimated Actual for 2012/13 | - | |
Estimated Appropriation Remaining | - | |
Non-Departmental Capital Expenditure |
||
Joint Venture Airports - Crown Contribution (M72)This appropriation is limited to enhancements to joint venture airport terminals and runways and the Crown's share of operating losses. Commences: 1 July 2011 Expires: 30 June 2015 |
Original Appropriation | 2,000 |
Adjustments for 2010/11 | - | |
Adjustments to 2011/12 | 101 | |
Adjusted Appropriation | 2,101 | |
Actual to 2010/11 Year End | - | |
Estimated Actual for 2011/12 | 601 | |
Estimated Actual for 2012/13 | 500 | |
Estimated Appropriation Remaining | 1,000 |
Details of Projected Movements in Departmental
Net Assets#
Ministry of Transport
Details of Net Asset Schedule | 2011/12 Main Estimates Projections $000 |
2011/12 Supplementary Estimates Projections $000 |
Explanation of Projected Movements in 2011/12 |
---|---|---|---|
Opening Balance | 3,116 | 3,116 | Supplementary Estimates opening balance reflects the audited results as at 30 June 2011. |
Capital Injections | - | - | |
Capital Withdrawals | - | - | |
Surplus to be Retained (Deficit Incurred) | - | - | |
Other Movements | - | - | |
Closing Balance |
3,116 | 3,116 |
Information Supporting the Supplementary Estimates Vote Transport#
MINISTER(S) RESPONSIBLE FOR APPROPRIATIONS: Minister of Transport (M72)
ADMINISTERING DEPARTMENT: Ministry of Transport
MINISTER RESPONSIBLE FOR MINISTRY OF TRANSPORT: Minister of Transport
Part 1 - Summary of the Vote#
Part 1.3 - Trends in the Vote
Summary of Financial Activity
2011/12 | |||||
---|---|---|---|---|---|
Supplementary Estimates | |||||
Estimates $000 |
Departmental Transactions $000 |
Non-Departmental Transactions $000 |
Total Transactions $000 |
Total $000 |
|
Appropriations |
|||||
Output Expenses | 1,938,579 | (133) | 60,291 | 60,158 | 1,998,737 |
Benefits and Other Unrequited Expenses | - | N/A | - | - | - |
Borrowing Expenses | - | - | - | - | - |
Other Expenses | 371,767 | - | 9,526 | 9,526 | 381,293 |
Capital Expenditure | 2,012,537 | (447) | 260,417 | 259,970 | 2,272,507 |
Intelligence and Security Department Expenses and Capital Expenditure | - | - | N/A | - | - |
Total Appropriations |
4,322,883 | (580) | 330,234 | 329,654 | 4,652,537 |
Crown Revenue and Capital Receipts |
|||||
Tax Revenue | 1,179,742 | N/A | (3,222) | (3,222) | 1,176,520 |
Non-Tax Revenue | 80,692 | N/A | (6,001) | (6,001) | 74,691 |
Capital Receipts | - | N/A | - | - | - |
Total Crown Revenue and Capital Receipts |
1,260,434 | N/A | (9,223) | (9,223) | 1,251,211 |
Analysis of Significant Trends
Tax Revenue
Vote Transport is responsible for collecting tax revenue from motor vehicle registration fees and road user charges. Revenue is forecast three times a year and increases and decreases reflected in the Crown financial statements. The change above is less than 1 percent.
Non Tax Revenue
This represents administration fees, road tolling revenue and some infringement fees. The decrease is mainly due to a change in what fees can be charged for some services.
Appropriations
Recipient | Estimates 2011/12 $000 | Movement during the year $000 | Supplementary Estimates 2011/12 $000 |
---|---|---|---|
Funding to the NZTA for the NLTF - funded from tax revenue | 2,463,787 | (95,326) | 2,368,461 |
Funding to the NLTF from the Crown | 750,529 | 285,397 | 1,035,926 |
Funding from the Crown for other roading projects | 7,000 | - | 7,000 |
Funding for Rail | 936,855 | 94,327 | 1,031,182 |
Funding to Crown entities | 23,086 | 1,785 | 24,871 |
Other | 88,738 | 44,051 | 132,789 |
Subtotal |
4,269,995 | 330,234 | 4,622,229 |
Funding to the Ministry of Transport |
|||
Output Expense | 52,138 | (133) | 52,005 |
Capital Expense | 750 | (447) | 303 |
Total |
4,322,883 | 329,654 | 4,652,537 |
The table above explains the changes in the Vote by recipient for ease of explanation.
Funding to the NZ Transport Agency for the NLTF - funded from tax revenue
This funding moves in line with road tax revenue. Vote Transport road tax revenue is almost unchanged as noted above, however Customs also collect this revenue. The decrease of $95 million reflects the net effect of:
- Vote Transport forecast road tax revenue decreased by $3 million during the year
- the forecast road tax revenue collected by Customs decreased by $69 million
- the forecast expenditure decreased by $22 million to reflect the balance in the National Land Transport Fund.
Funding to the NLTF from the Crown
While the main source of funding to the National Land Transport Fund is intended to be road tax revenue, the Crown may provide additional funding. The movement of $286 million is the net of:
- $180 million for a second short-term advance facility for the NZ Transport Agency to borrow up to $90 million from the Crown for 2011/12 only, to assist it to manage seasonal fluctuations in revenue and work programming, and emergency works. The appropriation was set at $180 million to allow funds to be repaid and then redrawn if required
- $102 million for the reinstatement of local roads in Canterbury following the earthquakes, and
- $4 million balance is the recognition of surplus administration fee revenue from 2010/11 and 2011/12.
Funding for Rail
The table above appears to show that rail funding has grown by $94 million in 2011/12. However the increase is mainly due to rephasing between years and a $50.6 million accounting entry, and is not an overall increase. The table below explains the movements that have occurred during the year:
Reason for movement | $000 |
---|---|
Unspent funds from 2010/11 transferred to 2011/12 | 37,442 |
Funds not required in 2011/12 and so carried forward to outyears | (116,107) |
Funds for 2012/13 brought forward to 2011/12 | 3,161 |
Loan transferred to Auckland Council and rephased | 119,231 |
Accounting entry | 50,600 |
Total |
$94,327 |
The $500 million loan for the Auckland Electric Multiple Unit package was transferred from KiwiRail to the Auckland Council during the year and the funding rephased. The $80.769 million initially appropriated for 2011/12 increased to $200 million - an increase of $119.231 million, but the loan funding in outyears decreased by this amount.
The accounting entry of $50.600 million represents the cost to the Crown of the below market interest rate of the loan to the Auckland Council.
Funding for Crown Entities
The Transport Crown entities are mainly funded by third party revenue and so receive relatively little Crown funding. The main reasons for the increase of $1.785 million are:
- $1.250 million to Maritime New Zealand to assist them to manage their business as usual activity while also managing the response to the grounding of the MV Rena. This increase was fiscally neutral to the Crown as it was a transfer within the Vote
- $293,000 million to Maritime New Zealand to fund its increased liability to capital charge, and
- $200,000 million to the NZ Transport Agency to fund the introduction of Driver Licence Stop Orders, a new enforcement tool.
Other
Other consists of funding for other activities. The main reasons for the increase of $44.051 million are:
- $35 million for the response to the MV Rena grounding. While this is managed by Maritime NZ, it has been shown separately from the Crown entity funding above, due to its unusual nature
- $7.100 million for the Motor Vehicle Register to cover lower revenue from third parties
- $1 million for an increase in the Bad Debt provision for motor vehicle registration and road user charges based on higher than usual actual costs, and
- $850,000 million for the Motor Vehicle Register running costs and $101,000 million for joint venture airports, carried forward from 2010/11.
Funding for the Ministry of Transport
The small decrease is the net of:
- $1.250 million transferred to Maritime New Zealand to assist them to manage their business as usual activity, while also managing the response to the grounding of the MV Rena
- $1.124 million carried forward from 2010/11
- $193,000 million of additional third party revenue, and
- $200,000 million returned to the Crown representing efficiency savings.
Part 2 - Details and Expected Performance for Output Expenses#
Part 2.1 - Departmental Output Expenses#
Governance and Performance Advice for Crown Agencies (M72)
Scope of Appropriation
Reasons for Change in Appropriation
This appropriation decreased due to a fiscally neutral transfer of $650,000 to departmental output expense Policy Advice. This reflected:
- the estimated actual cost of the outputs purchased by the Minister, and
- the reprioritisation of work by the Ministry to manage the transfer of departmental funding to Maritime New Zealand to assist it with its ongoing activities following the Rena grounding.
The original cost for this output class was based on that of 2010/11, which included work on two Crown entity reviews. This expenditure was not repeated in 2011/12.
Land Transport Revenue Forecasting and Strategy (M72)#
Scope of Appropriation#
Reasons for Change in Appropriation#
This appropriation increased by $550,000 due to:
- a carry forward of $350,000 from 2010/11. $200,000 of this was subsequently returned to the Crown as the Ministry could manage within baseline, and
- an increase of $400,000 from a fiscally neutral transfer between output classes to reflect the forecast costs of the outputs purchased by the Minister.
Milford Sound / Piopiotahi Aerodrome Operation and Administration (M72)#
Scope of Appropriation#
Expenses and Revenue#
2011/12 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Total Appropriation | 200 | 23 | 223 |
Revenue from Crown | - | - | - |
Revenue from Other | 200 | 23 | 223 |
Reasons for Change in Appropriation#
The appropriation increased to reflect a fee review implemented during the year to cover the costs of this activity.
Policy Advice (M72)#
Scope of Appropriation#
Expenses and Revenue#
2011/12 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Total Appropriation | 30,118 | (1,030) | 29,088 |
Revenue from Crown | 29,718 | (1,200) | 28,518 |
Revenue from Other | 400 | 170 | 570 |
Reasons for Change in Appropriation#
The reason for the decrease in the appropriation is the net of several factors, including:
- $1.250 million of departmental revenue transferred to Maritime New Zealand to assist it to deliver its planned work while dealing with the Rena grounding
- $200,000 returned to the Crown as an efficiency saving
- $170,000 of additional revenue from third parties.
Road User Charges Collection, Investigation and Enforcement (M72)#
Scope of Appropriation#
Reasons for Change in Appropriation#
The appropriation increased due to a carry forward from 2010/11 of $974,000 to cover the costs of the implementation of the road user charges review.
Part 2.2 - Non-Departmental Output Expenses#
Licensing Activities (M72)#
Scope of Appropriation
Reasons for Change in Appropriation
The appropriation increased to reflect additional funding to implement system changes to accommodate the new enforcement tool of Driver Licence Stop Orders.
Motor Vehicle Registry (M72)#
Scope of Appropriation#
Reasons for Change in Appropriation#
The appropriation increased because:
- $850,000 was carried forward from 2010/11, and
- an increase of $7.100 million was approved to match the reduction in revenue received from the Accident Compensation Corporation.
National Land Transport Programme PLA (M72)#
Scope of Appropriation#
Reasons for Change in Appropriation#
The appropriation decreased due to a transfer of $50 million to the National Land Transport Programme capital appropriation to reflect the cost of activities proposed by the NZ Transport Agency in the year.
Policy Advice on Safety Regulation and Monitoring - Maritime (M72)#
Scope of Appropriation#
Reasons for Change in Appropriation#
The appropriation increased due to:
- a $1.250 million transfer from within Vote Transport to assist Maritime NZ to deliver their planned outputs while also managing the response to the grounding of the MV Rena, and
- an increase in funding for capital charge.
Rail - Waikato Network Funding (M72)#
Scope of Appropriation#
Reasons for Change in Appropriation#
The appropriation decreased because due to delays, $1.591 million has been transferred to 2012/13.
Reinstatement of Local Roads in Canterbury (M72)#
Scope of Appropriation#
Expenses#
2011/12 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Total Appropriation | - | 102,000 | 102,000 |
Reasons for Change in Appropriation#
This appropriation was established during the year to assist with road reinstatement following the earthquakes because the costs were beyond those that could be borne by the National Land Transport Programme without affecting its other work.
Output Performance Measures and Standards#
2011/12 | |||
---|---|---|---|
Performance Measures | Estimates Standard |
Supplementary Estimates Standard |
Total Standard |
% of activities delivered to agreed standards and timeframes (All funds allocated to programmed activity) | - | 100% | 100% |
Search and Rescue Activities (M72)#
Scope of Appropriation#
Reasons for Change in Appropriation#
The appropriation increased because Maritime New Zealand was granted additional funding for capital charge and part of this was allocated to this appropriation.
Part 5 - Details and Expected Results for Other Expenses#
Part 5.2 - Non-Departmental Other Expenses#
Auckland Rail Development (M72)
Scope of Appropriation and Expenses
Type, Title, Scope and Period of Appropriations | Appropriation, Adjustments and Use | $000 |
---|---|---|
Non-Departmental Other Expenses |
||
Auckland Rail Development (M72)This appropriation is limited to the renewal, upgrade, and electrification of the Auckland metropolitan rail network. Commences: 1 July 2009 Expires: 30 June 2014 |
Original Appropriation | 663,875 |
Adjustments for 2010/11 | 19,722 | |
Adjustments to 2011/12 | (20,000) | |
Adjusted Appropriation | 663,597 | |
Actual to 2010/11 Year End | 350,158 | |
Estimated Actual for 2011/12 | 133,686 | |
Estimated Actual for 2012/13 | 152,106 | |
Estimated Appropriation Remaining | 27,647 |
Reasons for Change in Appropriation
The funding adjustment of $20 million reflects a decision by Cabinet during the year to transfer funding from this appropriation to the Auckland Metro Rail Electric Multiple Unit package.
At the start of 2011/12, the estimated actual for the year was $248 million. This decreased during the year, as funding was rephased over the life of the project which had been extended to 30 June 2014 as part of Budget 11.
Bad Debt Provision - Motor Vehicle Registration/Licenses and Road User Charges (M72)#
Scope of Appropriation#
Reasons for Change in Appropriation#
The appropriation increased to reflect the forecast level of bad debts
Loan for Auckland Metro Rail Electric Multiple Unit Package Fair Value Write-down (M72)#
Scope of Appropriation#
Expenses#
2011/12 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Total Appropriation | - | 50,600 | 50,600 |
Reasons for Change in Appropriation#
This appropriation was created during the year to reflect the cost to the Crown of the below market interest rate associated with the loan for the Electric Multiple Unit package. It is an accounting entry only.
Expected Results#
2011/12 | |||
---|---|---|---|
Estimates Standard |
Supplementary Estimates Standard |
Total Standard |
|
Write-down corrects the value of the loan interest. | - | 100% | 100% |
Rail - Metro Rail Rolling Stock and Infrastructure (Wellington) (M72)#
Scope of Appropriation#
Reasons for Change in Appropriation#
The appropriation increased due to a carry forward of unspent funding from 2011/12.
Tauranga Maritime Incident Response (M72)#
Scope of Appropriation#
Expenses#
2011/12 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Total Appropriation | - | 35,000 | 35,000 |
Reasons for Change in Appropriation#
The appropriation was created during the year to provide Maritime New Zealand with funding to manage the response to the grounding of the MV Rena off Tauranga in October 2011.
Expected Results#
2011/12 | |||
---|---|---|---|
Estimates Standard |
Supplementary Estimates Standard |
Total Standard |
|
Quantity | |||
Remove all oil waste on beaches arising from Rena oil spill | - | 800 - 1,000 tons | 800 - 1,000 tons |
Rehabilitate birds oiled from Rena oil spill | - | 350 - 450 | 350 - 450 |
Quality | |||
All beaches affected by the Rena oil spill are cleaned up to stage II end point criteria (oil does not present a threat to the environment) | - | 100% | 100% |
Timeliness | |||
A 24-hour Tauranga Incident Command Centre provided | - | 100% | 100% |
Reporting Mechanisms#
Appropriation | Reporting Mechanism |
---|---|
Loan for Auckland Metro Rail Electric Multiple Unit Package Fair Value Write-down | The Crown's annual report |
Reinstatement of Local Roads in Canterbury | NZ Transport Agency annual report |
Tauranga Maritime Incident Response | Maritime NZ annual report |
The above table indicates the mechanisms to be used for reporting actual performance for each non-departmental other expenses appropriation.
Part 6 - Details and Expected Results for Capital Expenditure#
Part 6.1 - Departmental Capital Expenditure#
Ministry of Transport - Capital Expenditure PLA (M72)
Scope of Appropriation
Capital Expenditure
2011/12 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Forests/Agricultural | - | - | - |
Land | - | - | - |
Property, Plant and Equipment | 470 | (326) | 144 |
Intangibles | 280 | (121) | 159 |
Other | - | - | - |
Total Appropriation |
750 | (447) | 303 |
Reasons for Change in Appropriation
The appropriation decreased as expenditure was lower than forecast.
Part 6.2 - Non-Departmental Capital Expenditure#
Joint Venture Airports - Crown Contribution (M72)#
Scope of Appropriation and Capital Expenditure
Type, Title, Scope and Period of Appropriations | Appropriation, Adjustments and Use | $000 |
---|---|---|
Non-Departmental Capital Expenditure |
||
Joint Venture Airports - Crown Contribution (M72)This appropriation is limited to enhancements to joint venture airport terminals and runways and the Crown's share of operating losses. Commences: 1 July 2011 Expires: 30 June 2015 |
Original Appropriation | 2,000 |
Adjustments for 2010/11 | - | |
Adjustments to 2011/12 | 101 | |
Adjusted Appropriation | 2,101 | |
Actual to 2010/11 Year End | - | |
Estimated Actual for 2011/12 | 601 | |
Estimated Actual for 2012/13 | 500 | |
Estimated Appropriation Remaining | 1,000 |
Reasons for Change in Appropriation
The appropriation increased due to a transfer of unspent funding of $101,000 from the previous joint venture appropriation which expired on 30 June 1011.
National Land Transport Programme - New Infrastructure for and Renewal of State Highways PLA (M72)#
Scope of Appropriation#
Reasons for Change in Appropriation#
The appropriation decreased as a result of:
- a transfer of $50 million from the National Land Transport Programme operating appropriation to reflect the planned activities during the year
- a decrease of $73 million to reflect increased forecast revenue
- a decrease of $22 million to reflect the balance of the National Land Transport Fund.
New & Improved Infrastructure for State Highways - Crown Contribution (M72)#
Scope of Appropriation#
Reasons for Change in Appropriation#
This appropriation decreased by $3 million due to the net of:
- an increase of $10 million from the recognition of actual unspent administration fee income from 2010/11 and forecast surplus from 2011/12, and
- a decrease of $7.100 million due to a transfer of funding to the Non-departmental Output Expense: Motor Vehicle Registry to cover a decrease in third party revenue.
NLTF Borrowing Facility for a Short-Term Advance in 2011/12. (M72)#
Scope of Appropriation#
Capital Expenditure#
2011/12 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Total Appropriation | - | 180,000 | 180,000 |
Reasons for Change in Appropriation#
This appropriation was created during the year to assist the New Zealand Transport Agency to address a cash flow issue.
Expected Results#
2011/12 | |||
---|---|---|---|
Estimates Standard |
Supplementary Estimates Standard |
Total Standard |
|
The loan will be drawn down for the purposes and on the terms agreed between New Zealand Transport Agency and the Minister of Transport | - | 100% | 100% |
Rail - Loan for Auckland Metro Rail Electric Multiple Unit Package (M72)#
Scope of Appropriation#
Capital Expenditure#
2011/12 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Total Appropriation | - | 200,000 | 200,000 |
Reasons for Change in Appropriation#
This appropriation was created during the year to to replace the existing loan appropriation to KiwiRail and reflect the ownership of this rail package.
Expected Results#
2011/12 | |||
---|---|---|---|
Estimates Standard |
Supplementary Estimates Standard |
Total Standard |
|
All loan draw downs and payments are made in accordance with the documentation and process outlined in the loan agreement between the Crown and Auckland Council | - | 100% | 100% |
Rail - New Zealand Railways Corporation Loans (M72)#
Scope of Appropriation#
Reasons for Change in Appropriation#
The appropriation decreased due to the transfer of the loan funding for the Auckland Electric Multiple Unit package to a separate appropriation to the Auckland Council.
Wellington Metro Rail Network Upgrade (M72)#
Scope of Appropriation#
Reasons for Change in Appropriation#
The appropriation increased due to a transfer of funding from 2012/13 to match the expenditure profile.
Reporting Mechanisms#
Appropriation | Reporting Mechanism |
---|---|
NLTF Borrowing Facility for a Short-Term Advance in 2011/12 | NZ Transport Agency annual report |
Rail - Loan for Auckland Metro Rail Electric Multiple Unit Package | Report under Section 32A under the Public Finance Act. |
The above table indicates the mechanisms to be used for reporting actual results for each non-departmental capital expenditure appropriation.