APPROPRIATION MINISTER(S): Minister for Climate Change Issues (M12), Minister for the Environment (M29)
APPROPRIATION ADMINISTRATOR: Ministry for the Environment
RESPONSIBLE MINISTER FOR MINISTRY FOR THE ENVIRONMENT: Minister for the Environment
Details of Appropriations and Capital Injections#
Annual and Permanent Appropriations#
2014/15 | |||
---|---|---|---|
Titles and Scopes of Appropriations by Appropriation Type | Estimates Budget $000 |
Supplementary Estimates Budget $000 |
Total Budget $000 |
Departmental Output Expenses |
|||
Carbon Monitoring Programme (M12)Development of a national carbon accounting system that will contribute to the meeting of New Zealand's greenhouse gas reporting obligations under the Kyoto Protocol and the UNFCCC. |
4,275 | (1,085) | 3,190 |
Ministerial Services (M29)This appropriation is limited to the provision of services to Ministers to enable them to discharge their portfolio responsibilities (other than policy decision-making). |
3,300 | (543) | 2,757 |
Waste Minimisation Administration (M29)This appropriation is limited to the collection and administration of the waste levy and assessing and monitoring costs relating to projects considered or approved for funding from the waste levy. |
1,714 | 16 | 1,730 |
Total Departmental Output Expenses |
9,289 | (1,612) | 7,677 |
Departmental Capital Expenditure |
|||
Ministry for the Environment - Capital Expenditure PLA (M29)This appropriation is limited to the purchase or development of assets by and for the use of the Ministry for the Environment, as authorised by section 24(1) of the Public Finance Act 1989. |
621 | 919 | 1,540 |
Total Departmental Capital Expenditure |
621 | 919 | 1,540 |
Non-Departmental Output Expenses |
|||
Administration of New Zealand Units held on Trust (M12)This appropriation is limited to the application for and holding on trust of New Zealand Units on behalf of the future owners of Crown Forest Licensed land. |
177 | - | 177 |
Community Environment Fund (M29)This appropriation is limited to strengthening partnerships, raising environmental awareness and encouraging participation in environmental initiatives in the community. |
4,872 | (2,475) | 2,397 |
Contaminated Sites Remediation Fund (M29)This appropriation is limited to the investigation, management and remediation of contaminated sites. |
4,628 | (4,104) | 524 |
Contestable Waste Minimisation Fund (M29)This appropriation is limited to grants for waste minimisation initiatives. |
15,752 | (3,169) | 12,583 |
Emissions Trading Scheme (M12)This appropriation is limited to the implementation and operation of the New Zealand Emissions Trading Scheme and maintenance of a register to enable the holding and transfer of climate change units. |
6,392 | (300) | 6,092 |
Environmental Training Programmes (M29)This appropriation is limited to supporting training programmes, including Te Aho Tu Roa, that promote environmental and social sustainability, encourage Maori participation, raise environmental and ecological awareness and encourage children and young people to participate in environmental initiatives in the community. |
1,900 | - | 1,900 |
Fresh Start for Fresh Water: New Initiatives (M29)This appropriation is limited to the clean-up of New Zealand's freshwater waterbodies arising from historical contamination. |
1,700 | 729 | 2,429 |
Fresh Start for Fresh Water: Rotorua Lakes Restoration Programme (M29)This appropriation is limited to maintaining and improving the water quality of the Rotorua Lakes. |
- | 298 | 298 |
Promotion of Sustainable Land Management (M29)This appropriation is limited to the promotion and coordination of sustainable land management practice through a national network of coordinators. |
800 | - | 800 |
Te Mana o Te Wai - restoring the life-giving capacity of fresh water (M29)This appropriation is limited to freshwater initiatives, with involvement from community stakeholders, for New Zealand's freshwater bodies. |
2,500 | (2,030) | 470 |
Total Non-Departmental Output Expenses |
38,721 | (11,051) | 27,670 |
Non-Departmental Other Expenses |
|||
Allocation of New Zealand Units (M12)This appropriation is limited to the granting of New Zealand Units to sectors of the New Zealand Economy. |
164,710 | (14,890) | 149,820 |
Climate Change Development Fund (M12)This appropriation is limited to supporting international projects to assist developing countries address climate change issues. |
300 | - | 300 |
Environmental Legal Assistance (M29)This appropriation is limited to supporting groups that wish to advocate for environmental issues in resource management cases in the courts and appearances at Boards of Inquiry of projects of national significance. |
800 | (120) | 680 |
Exclusive Economic Zone Major Prosecutions Fund (M29)This appropriation is limited to major prosecutions relating to activities regulated under the Exclusive Economic Zone and Continental Shelf (Environmental Effects) Act 2012. |
- | 500 | 500 |
Framework Convention on Climate Change (M12)New Zealand's contribution to the United Nations Framework Convention on Climate Change. |
127 | - | 127 |
Fresh Start for Fresh Water: Waikato River Clean-up Fund (M29)This appropriation is limited to funding for the Waikato River Clean-up Fund for the restoration and protection of the health and wellbeing of the Waikato River for future generations. |
5,291 | - | 5,291 |
Impairment of Debt Relating to Climate Change Activities (M12)This appropriation is limited to the impairment and write down of Crown debt arising from Climate Change related activities. |
8,700 | - | 8,700 |
Impairment of Debt Relating to Environment Activities (M29)This appropriation is limited to the impairment and write down of Crown debt arising from Environment related activities excluding Climate Change. |
1,500 | - | 1,500 |
International Subscriptions (M29)This appropriation is limited to subscriptions to International Environmental Agreements. |
117 | - | 117 |
Te Awa Tupua Putea (M29)This appropriation is limited to the Crown's contribution to the Te Awa Tupua Putea fund established as part of the Whanganui River Treaty Settlement. |
- | 882 | 882 |
Te Awa Tupua Whole of River Strategy (M29)This appropriation is limited to the Crown contribution to the establishment, support and collaborative development of the Te Awa Tupua (Whanganui River) Whole of River Strategy. |
- | 13 | 13 |
Te Pou Tupua (M29)This appropriation is limited to the Crown contribution to support Te Pou Tupua (the Whanganui River Guardian) functions. |
96 | - | 96 |
Transitional Support for Local Government and Iwi (M29)This appropriation is limited to providing transitional support to local authorities and iwi for new arrangements involving iwi in the management of natural resources arising from historical Treaty settlements. |
- | 17 | 17 |
United Nations Environment Programme (M29)New Zealand's membership of the United Nations Environment Programme. |
393 | - | 393 |
Waikato River Co-Governance (M29)This appropriation is limited to the governance and operational costs of Waikato River co-governance. |
910 | - | 910 |
Waikato River Co-Management (M29)This appropriation is limited to enabling the Waikato River Iwi to engage in the new co-management arrangements in relation to the Waikato River. |
2,873 | - | 2,873 |
Waste Disposal Levy Disbursements to Territorial Local Authorities (M29)This appropriation is limited to payments to Territorial Local Authorities of their proportion of the Waste Disposal Levy as prescribed under the Waste Minimisation Act 2008. |
14,000 | 2,000 | 16,000 |
Total Non-Departmental Other Expenses |
199,817 | (11,598) | 188,219 |
Multi-Category Expenses and Capital Expenditure |
|||
Climate Change MCA (M12)The overarching purpose of this appropriation is to provide policy advice and other support to Ministers focusing on decreasing New Zealand's net emissions of greenhouse gases below business as usual levels in a cost-effective way. |
7,061 | 875 | 7,936 |
Departmental Output Expenses |
|||
Domestic Climate Change Programme Policy AdviceThis category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to domestic climate change. |
3,462 | 59 | 3,521 |
International Climate Change Programme Policy AdviceThis category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to international climate change issues, negotiating positions for climate change agreements and development of carbon markets. |
3,550 | 816 | 4,366 |
Synthetic Greenhouse Gas LevyThis category is limited to the implementation and collection of the Synthetic Greenhouse Gas Levy. |
49 | - | 49 |
Environmental Management Obligations and Programmes MCA (M29)The overarching purpose of this appropriation is to provide policy advice and other support to Ministers focusing on achieving better solutions to environmental problems by supporting community involvement and action and international cooperation. |
3,335 | (341) | 2,994 |
Departmental Output Expenses |
|||
Domestic Obligations and ProgrammesThis category is limited to contributing to and monitoring of domestic environmental management programmes and educational programmes promoting awareness of environmental issues. |
1,705 | (135) | 1,570 |
International Obligations and Institutions Policy AdviceThis category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to advice on international environmental arrangements, agreements and partnerships; contributing to negotiations with international parties on environmental issues in line with international arrangements, agreements and partnerships. |
1,630 | (206) | 1,424 |
Environmental Protection Authority: Regulatory Functions MCA (M29)The overarching purpose of this appropriation is to provide advice and other support to Ministers focusing on the regulatory functions carried out by the Environmental Protection Authority. |
18,585 | (550) | 18,035 |
Non-Departmental Output Expenses |
|||
Compliance and EnforcementThis category is limited to the compliance and enforcement functions of the activities applicable to EPA's regulatory functions. |
8,404 | - | 8,404 |
Decision MakingThis category is limited to the enabling and supporting decision-making processes for approvals of the activities applicable to EPA's regulatory functions. |
10,181 | (550) | 9,631 |
Improving Resource Management MCA (M29)The overarching purpose of this appropriation is to provide policy advice and other support to Ministers focusing on improving resource management. |
32,840 | 327 | 33,167 |
Departmental Output Expenses |
|||
Developing and Implementing Treaty Settlements and Environmental Accords Policy AdviceThis category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to environmental accords with Maori and Treaty settlements involving natural resources; contributing to negotiations with iwi and affected parties on environmental issues as part of developing deeds of settlement. |
1,224 | 76 | 1,300 |
Marine Environment Policy AdviceThis category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the marine environment. |
1,316 | 323 | 1,639 |
Resource Management ImplementationThis category is limited to the implementation of tools, frameworks and institutions and provision of advice, support, information, and guidance to the public, practitioners and wider natural resource sector in relation to resource management policy and practices. |
11,685 | (2,667) | 9,018 |
Resource Management Policy AdviceThis category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the management of natural and physical resources in New Zealand. |
4,797 | 2,879 | 7,676 |
Water Management ImplementationThis category is limited to activities associated with the implementation of water management policy and practises. |
3,000 | 1,771 | 4,771 |
Water Management Policy AdviceThis category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the quality, flow and availability of freshwater. |
8,818 | (555) | 8,263 |
Non-Departmental Output Expenses |
|||
Water science and economicsThis category is limited to water science and economic impact analyses, and guidance to support development of the National Objectives Framework. |
2,000 | (1,500) | 500 |
Mitigating Environmental Hazards and Waste MCA (M29)The overarching purpose of this appropriation is to provide policy advice and other support to Ministers focusing on reducing harm from natural, chemical and biological hazards and from waste through more effective management frameworks. |
3,450 | 54 | 3,504 |
Departmental Output Expenses |
|||
Environmental Hazards and Waste Policy AdviceThis category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the risks posed by environmental hazards and waste, including international agreements, conventions and obligations. |
1,365 | 554 | 1,919 |
Waste Management and MinimisationThis category is limited to operational advice, implementation of tools, frameworks and institutions, and support, information and guidance to stakeholders in relation to waste management and minimisation. |
2,085 | (500) | 1,585 |
Total Multi-Category Expenses and Capital Expenditure |
65,271 | 365 | 65,636 |
Total Annual and Permanent Appropriations |
313,719 | (22,977) | 290,742 |
Multi-Year Appropriations#
Type, Title, Scope and Period of Appropriations | Appropriations, Adjustments and Use | $000 |
---|---|---|
Non-Departmental Output Expenses |
||
Protecting Lake Taupo Programme (M29)This appropriation is limited to the reduction of nitrogen levels entering Lake Taupo.Commences: 22 September 2010 Expires: 30 June 2015 |
Original Appropriation | 10,668 |
Adjustments to 2013/14 | - | |
Adjustments for 2014/15 | - | |
Adjusted Appropriation | 10,668 | |
Actual to 2013/14 Year End | 10,602 | |
Estimated Actual for 2014/15 | 66 | |
Estimated Actual for 2015/16 | - | |
Estimated Appropriation Remaining | - | |
Rena Long-term Environment Recovery (M29)This appropriation is limited to funding for the implementation of the Rena Long-term Environmental Recovery Plan.Commences: 07 March 2012 Expires: 30 June 2015 |
Original Appropriation | 2,872 |
Adjustments to 2013/14 | (453) | |
Adjustments for 2014/15 | - | |
Adjusted Appropriation | 2,419 | |
Actual to 2013/14 Year End | 2,303 | |
Estimated Actual for 2014/15 | 116 | |
Estimated Actual for 2015/16 | - | |
Estimated Appropriation Remaining | - |
Total Annual, Permanent and Multi-Year Appropriations#
2014/15 | |||
---|---|---|---|
Estimates Budget $000 |
Supplementary Estimates Budget $000 |
Total Budget $000 |
|
Total Annual and Permanent Appropriations | 313,719 | (22,977) | 290,742 |
Total MYA Non-Departmental Output Expenses Forecasts | 66 | 116 | 182 |
Total Annual and Permanent Appropriations and Multi-Year Appropriation Forecasts |
313,785 | (22,861) | 290,924 |
Capital Injection Authorisations#
2014/15 | |||
---|---|---|---|
Estimates Budget $000 |
Supplementary Estimates Budget $000 |
Total Budget $000 |
|
Ministry for the Environment - Capital Injection (M29) | - | - | - |
Supporting Information#
Part 1 - Vote as a Whole#
1.2 - Trends in the Vote
Summary of Financial Activity
2014/15 | |||||
---|---|---|---|---|---|
Supplementary Estimates | |||||
Estimates $000 |
Departmental Transactions $000 |
Non-Departmental Transactions $000 |
Total Transactions $000 |
Total $000 |
|
Appropriations |
|||||
Output Expenses | 48,076 | (1,612) | (10,935) | (12,547) | 35,529 |
Benefits or Related Expenses | - | N/A | - | - | - |
Borrowing Expenses | - | - | - | - | - |
Other Expenses | 199,817 | - | (11,598) | (11,598) | 188,219 |
Capital Expenditure | 621 | 919 | - | 919 | 1,540 |
Intelligence and Security Department Expenses and Capital Expenditure | - | - | N/A | - | - |
Multi-Category Expenses and Capital Expenditure (MCA) | |||||
Output Expenses | 65,271 | 2,415 | (2,050) | 365 | 65,636 |
Other Expenses | - | - | - | - | - |
Capital Expenditure | - | N/A | - | - | - |
Total Appropriations |
313,785 | 1,722 | (24,583) | (22,861) | 290,924 |
Crown Revenue and Capital Receipts |
|||||
Tax Revenue | - | N/A | - | - | - |
Non-Tax Revenue | 75,140 | N/A | 41,062 | 41,062 | 116,202 |
Capital Receipts | - | N/A | - | - | - |
Total Crown Revenue and Capital Receipts |
75,140 | N/A | 41,062 | 41,062 | 116,202 |
Part 2 - Details of Departmental Appropriations#
2.1 - Departmental Output Expenses
Carbon Monitoring Programme (M12)
Scope of Appropriation
Expenses and Revenue
2014/15 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Total Appropriation | 4,275 | (1,085) | 3,190 |
Revenue from the Crown | 4,275 | (1,100) | 3,175 |
Revenue from Others | - | 15 | 15 |
Reasons for Change in Appropriation
This appropriation decreased by $1.085 million to $3.190 million for 2014/15. The funding of $875,000 and $210,000 were reprioritised towards progressing one-off work in relation to international climate change negotiations within the Climate Change MCA and water management reforms within the Improving Resource Management MCA respectively.
Ministerial Services (M29)
Scope of Appropriation
Expenses and Revenue
2014/15 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Total Appropriation | 3,300 | (543) | 2,757 |
Revenue from the Crown | 3,300 | (575) | 2,725 |
Revenue from Others | - | 32 | 32 |
Reasons for Change in Appropriation
This appropriation decreased by $543,000 to $2.757 million for 2014/15. This is due to the fact that the Ministry received lower than anticipated Official Information Act requests and Parliamentary Questions arising from the profile and nature of the Ministry's key workstreams such as resource management and water reforms. This funding was reprioritised towards progressing work in relation to water management reforms within the Improving Resource Management MCA.
Waste Minimisation Administration (M29)
Scope of Appropriation
Expenses and Revenue
2014/15 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Total Appropriation | 1,714 | 16 | 1,730 |
Revenue from the Crown | 1,714 | - | 1,714 |
Revenue from Others | - | 16 | 16 |
Reasons for Change in Appropriation
This appropriation increased by $16,000 to $1.730 million for 2014/15. This increase primarily relates to cost recovery revenue from other parties.
2.3 - Departmental Capital Expenditure and Capital Injections
Ministry for the Environment - Capital Expenditure PLA (M29)
Scope of Appropriation
Capital Expenditure
2014/15 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Forests/Agricultural | - | - | - |
Land | - | - | - |
Property, Plant and Equipment | 121 | 142 | 263 |
Intangibles | 500 | 777 | 1,277 |
Other | - | - | - |
Total Appropriation |
621 | 919 | 1,540 |
End of Year Performance Reporting
Performance information for departmental capital expenditure will be reported by the Ministry for the Environment in its Annual Report.
Reasons for Change in Appropriation
This appropriation increased by $919,000 to $1.540 million for 2014/15. This increase primarily relates to the additional investment in the Ministry's core systems including a document records management system.
Capital Injections and Movements in Departmental Net Assets
Ministry for the Environment
Details of Net Asset Schedule | 2014/15 Main Estimates Projections $000 |
2014/15 Supplementary Estimates Projections $000 |
Explanation of Projected Movements in 2014/15 |
---|---|---|---|
Opening Balance | 5,992 | 5,992 | Supplementary Estimates opening balance reflects the audited results as at 30 June 2014. |
Capital Injections | - | - | |
Capital Withdrawals | - | - | |
Surplus to be Retained (Deficit Incurred) | - | - | |
Other Movements | - | - | |
Closing Balance |
5,992 | 5,992 |
Part 3 - Details of Non-Departmental Appropriations#
3.1 - Non-Departmental Output Expenses
Administration of New Zealand Units held on Trust (M12)
Scope of Appropriation
End of Year Performance Reporting
An exemption was granted under s15D(2)(b)(iii) of the Public Finance Act as the amount of this annual appropriation for a non-departmental output expense is less than $5 million.
Community Environment Fund (M29)
Scope of Appropriation
End of Year Performance Reporting
Performance information for this appropriation will be reported by the Minister for the Environment in a report appended to the Ministry for the Environment's Annual Report.
Reasons for Change in Appropriation
This appropriation decreased by $2.475 million to $2.397 million for 2014/15. This decrease is due to an expense transfer to 2015/16 for projects that support the implementation of the freshwater and resource management reforms, and other initiatives. This transfer represents the rephasing of funding to match the expected delivery of projects milestones.
Contaminated Sites Remediation Fund (M29)
Scope of Appropriation
End of Year Performance Reporting
An exemption was granted under s15D(2)(b)(iii) of the Public Finance Act as the amount of this annual appropriation for a non-departmental output expense is less than $5 million.
Reasons for Change in Appropriation
This appropriation decreased by $4.104 million to $524,000 for 2014/15, which is due to:
- a fiscally neutral transfer of $1.510 million to Vote Conservation for the remediation of the Prohibition and Alexander Mines
- an expense transfer of $1.693 million to 2015/16 in relation to a multi-year project to remediate the Kopeopeo Canal. The application for resource consents was appealed to the Environment Court and was only resolved in December 2014. The appeal has delayed the project start date by approximately six months. Therefore the funding originally planned for construction works in the current financial year is now to be undertaken in 2015/16, and
- an expense transfer of $901,000 to 2016/17 in relation to the Calwell Slipway project for the Ministry to support the remedial work for this site.
Contestable Waste Minimisation Fund (M29)
Scope of Appropriation
End of Year Performance Reporting
Performance information for this appropriation will be reported by the Minister for the Environment in a report appended to the Ministry for the Environment's Annual Report.
Reasons for Change in Appropriation
This appropriation decreased by $3.169 million to $12.583 million for 2014/15. This is due to the rephasing of funds to match the actual and expected delivery of milestones in outyears. Appropriation levels are initially set at the annual funding round limit and timing of deliverables and project milestones are unknown until the funding round is complete.
Emissions Trading Scheme (M12)
Scope of Appropriation
Reasons for Change in Appropriation
This appropriation decreased by $300,000 to $6.092 million for 2014/15. This decrease is due to an expense transfer of $300,000 to 2015/16 to cover the dual costs of operating the current and new Emissions Unit Register, currently being built by the Environmental Protection Authority.
Environmental Training Programmes (M29)
Scope of Appropriation
End of Year Performance Reporting
An exemption was granted under s15D(2)(b)(iii) of the Public Finance Act as the amount of this annual appropriation for a non-departmental output expense is less than $5 million.
Fresh Start for Fresh Water: New Initiatives (M29)
Scope of Appropriation
End of Year Performance Reporting
Performance information for this appropriation will be reported by the Minister for the Environment in a report appended to the Ministry for the Environment's Annual Report.
Reasons for Change in Appropriation
This appropriation increased by $729,000 to $2.429 million for 2014/15. This increase is primarily due to an expense transfer of $1.084 million from 2013/14 to match the actual delivery of milestones. However this is partially offset by an expense transfer of $355,000 to 2015/16.
Fresh Start for Fresh Water: Rotorua Lakes Restoration Programme (M29)
Scope of Appropriation
Expenses
2014/15 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Total Appropriation | - | 298 | 298 |
What is Intended to be Achieved with this Appropriation
This appropriation is intended to achieve improved water quality outcomes by targeted interventions in the Lake Rotorua catchment.
How Performance will be Assessed and End of Year Reporting Requirements
2014/15 | |||
---|---|---|---|
Performance Measures | Estimates Standard |
Supplementary Estimates Standard |
Total Standard |
The Rotorua Lakes Programme is undertaken in accordance with the agreed Annual work programme. |
New measure | Achieved | Achieved |
End of Year Performance Reporting
Performance information for this appropriation will be reported by the Minister for the Environment in a report appended to the Ministry for the Environment's Annual Report.
Service Providers
2014/15 | |||||
---|---|---|---|---|---|
Provider | Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
Reporting to the House |
Expiry of Resourcing Commitment |
Environment Bay of Plenty and Rotorua District Council for the restoration of Rotorua Lakes. | - | 298 | 298 | See above | 30 June 2032 |
Reasons for Change in Appropriation
The increase in this appropriation in 2014/15 is due to an expense transfer of $298,000 from 2013/14. This transfer represents the rephasing of the funding to match the expected delivery of project milestones. The rephasing of the funds is necessary to successfully implement the framework of nutrient reduction.
Promotion of Sustainable Land Management (M29)
Scope of Appropriation
End of Year Performance Reporting
An exemption was granted under s15D(2)(b)(iii) of the Public Finance Act as the amount of this annual appropriation for a non-departmental output expense is less than $5 million.
Te Mana o Te Wai - restoring the life-giving capacity of fresh water (M29)
Scope of Appropriation
End of Year Performance Reporting
An exemption was granted under s15D(2)(b)(iii) of the Public Finance Act as the amount of this annual appropriation for a non-departmental output expense is less than $5 million.
Reasons for Change in Appropriation
This appropriation decreased by $2.030 million to $470,000 for 2014/15. This is due to an expense transfer of $2.030 million to 2016/17.
Funding of $5 million is appropriated over two financial years (2014/16). This decrease is due to an expense transfer to support freshwater initiatives such as riparian planting, projects to reduce nitrate levels, and community-run water restoration efforts for local waterways.
3.4 - Non-Departmental Other Expenses
Allocation of New Zealand Units (M12)
Scope of Appropriation
End of Year Performance Reporting
Performance information for this appropriation will be reported by the Minister for the Environment in a report appended to the Ministry for the Environment's Annual Report.
Reasons for Change in Appropriation
This appropriation decreased by $14.890 million to $149.820 million for 2014/15. The decrease reflects the latest forecast changes of the allocation of units due to lower level of uptake rate by the post-1989 forestry and industrial sectors.
Climate Change Development Fund (M12)
Scope of Appropriation
End of Year Performance Reporting
An exemption was granted under s15D(2)(b)(iii) of the Public Finance Act as the amount of this annual appropriation for a non-departmental other expense is less than $5 million.
Environmental Legal Assistance (M29)
Scope of Appropriation
End of Year Performance Reporting
An exemption was granted under s15D(2)(b)(iii) of the Public Finance Act as the amount of this annual appropriation for a non-departmental other expense is less than $5 million.
Reasons for Change in Appropriation
This appropriation decreased by $120,000 to $680,000 for 2014/15. This decrease is due to a transfer of funding to Vote Transport to provide financial support to Maori groups engaged in the Bay of Plenty Regional Council hearing into the Rena Owner's resource consent application to leave the remains of the Rena wreck on Otaiti.
Exclusive Economic Zone Major Prosecutions Fund (M29)
Scope of Appropriation
Expenses
2014/15 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Total Appropriation | - | 500 | 500 |
What is Intended to be Achieved with this Appropriation
This appropriation is intended to allow the Environmental Protection Authority to carry out major prosecutions under the Exclusive Economic Zone and Continental Shelf (Environmental Effects) Act 2012.
End of Year Performance Reporting
An exemption was granted under s15D(2)(b)(iii) of the Public Finance Act as the amount of this annual appropriation for a non-departmental other expense is less than $5 million.
Reasons for Change in Appropriation
This is a new appropriation established in 2014/15 to cover costs of the Environmental Protection Authority to carry out major prosecutions under the Exclusive Economic Zone and Continental Shelf (Environmental Effects) Act 2012. A fiscally neutral transfer of $500,000 for 2014/15 was sought from the Non-Departmental Output Expense: Compliance and Enforcement category within the Multi-category appropriation: Environmental Protection Authority: Regulatory Functions.
Framework Convention on Climate Change (M12)
Scope of Appropriation
End of Year Performance Reporting
An exemption was granted under s15D(2)(b)(iii) of the Public Finance Act as the amount of this annual appropriation for a non-departmental other expense is less than $5 million.
Fresh Start for Fresh Water: Waikato River Clean-up Fund (M29)
Scope of Appropriation
End of Year Performance Reporting
Performance information for this appropriation will be reported by the Minister for the Environment in a report appended to the Ministry for the Environment's Annual Report.
Impairment of Debt Relating to Climate Change Activities (M12)
Scope of Appropriation
End of Year Performance Reporting
An exemption was granted under s15D(2)(b)(ii) of the Public Finance Act, as additional information is unlikely to be informative because this appropriation is the provision for incurring the expense involved in the impairment and write-down of Crown debt arising from climate change related activities (excluding environment).
Impairment of Debt Relating to Environment Activities (M29)
Scope of Appropriation
End of Year Performance Reporting
An exemption was granted under s15D(2)(b)(ii) of the Public Finance Act, as additional information is unlikely to be informative because this appropriation is the provision for incurring the expense involved in the impairment and write-down of Crown debt arising from environment related activities (excluding climate change).
International Subscriptions (M29)
Scope of Appropriation
End of Year Performance Reporting
An exemption was granted under s15D(2)(b)(iii) of the Public Finance Act as the amount of this annual appropriation for a non-departmental other expense is less than $5 million.
Te Awa Tupua Putea (M29)
Scope of Appropriation
Expenses
2014/15 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Total Appropriation | - | 882 | 882 |
What is Intended to be Achieved with this Appropriation
This appropriation is intended to achieve the advancement of initiatives relating to the health and wellbeing of Te Awa Tupua, funded through this contestable fund, which can be applied for by any person, group or entity.
End of Year Performance Reporting
An exemption was granted under s15D(2)(b)(iii) of the Public Finance Act as the amount of this annual appropriation for a non-departmental other expense is less than $5 million.
Reasons for Change in Appropriation
The increase in this appropriation in 2014/15 is due to an expense transfer of $882,000 from 2013/14.
This appropriation represents the unwinding of the discount for the one-off payment of $30 million recognised as an expense in 2013/14 in net present value terms. This amount is payable on legislation being enacted which is likely to happen within two years of signing of the deed.
Te Awa Tupua Whole of River Strategy (M29)
Scope of Appropriation
Expenses
2014/15 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Total Appropriation | - | 13 | 13 |
What is Intended to be Achieved with this Appropriation
This appropriation is intended to achieve the development of the Te Awa Tupua (Whanganui River) Whole of River Strategy, the purpose of which will be to identify issues for the environmental, social, cultural and economic health and wellbeing of Te Awa Tupua and provide a strategy and recommended actions for addressing those issues.
End of Year Performance Reporting
An exemption was granted under s15D(2)(b)(iii) of the Public Finance Act as the amount of this annual appropriation for a non-departmental other expense is less than $5 million.
Reasons for Change in Appropriation
The increase in this appropriation in 2014/15 is due to an expense transfer of $13,000 from 2013/14.
This appropriation represents the unwinding of the discount for the one-off Crown contribution of $430,000 recognised as an expense in 2013/14 in net present value terms. This amount is payable on legislation being enacted which is likely to happen within two years of signing of the deed.
Te Pou Tupua (M29)
Scope of Appropriation
End of Year Performance Reporting
An exemption was granted under s15D(2)(b)(iii) of the Public Finance Act as the amount of this annual appropriation for a non-departmental other expense is less than $5 million.
Transitional Support for Local Government and Iwi (M29)
Scope of Appropriation
End of Year Performance Reporting
Expenses
2014/15 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Total Appropriation | - | 17 | 17 |
What is Intended to be Achieved with this Appropriation
This appropriation is intended to achieve assistance with costs associated with new natural resource arrangements.
End of Year Performance Reporting
An exemption was granted under s15D(2)(b)(iii) of the Public Finance Act as the amount of this annual appropriation for a non-departmental other expense is less than $5 million.
Reasons for Change in Appropriation
The increase in this appropriation in 2014/15 is due to an expense transfer of $17,000 from 2013/14.
This appropriation represents the unwinding of the discount for the one-off Crown contribution of $575,000 recognised as an expense in 2013/14 in net present value terms. This amount is payable to the Bay of Plenty Regional Council to cover the costs arising from the Tauranga Moana Framework Co-management Arrangements. This payment is dependent on legislation being enacted.
United Nations Environment Programme (M29)
Scope of Appropriation
End of Year Performance Reporting
An exemption was granted under s15D(2)(b)(iii) of the Public Finance Act as the amount of this annual appropriation for a non-departmental other expense is less than $5 million.
Waikato River Co-Governance (M29)
Scope of Appropriation
End of Year Performance Reporting
An exemption was granted under s15D(2)(b)(iii) of the Public Finance Act as the amount of this annual appropriation for a non-departmental other expense is less than $5 million.
Waikato River Co-Management (M29)
Scope of Appropriation
End of Year Performance Reporting
An exemption was granted under s15D(2)(b)(iii) of the Public Finance Act as the amount of this annual appropriation for a non-departmental other expense is less than $5 million.
Waste Disposal Levy Disbursements to Territorial Local Authorities (M29)
Scope of Appropriation
End of Year Performance Reporting
Performance information for this appropriation will be reported by the Minister for the Environment in a report appended to the Ministry for the Environment's Annual Report.
Reasons for Change in Appropriation
This appropriation increased by $2 million to $16 million for 2014/15 to align to the amount of the Waste Disposal Levy revenue collected by the Crown.
Part 4 - Details of Multi-Category Expenses and Capital Expenditure#
Multi-Category Expenses and Capital Expenditure
Climate Change (M12)
Overarching Purpose Statement
Scope of Appropriation
Departmental Output Expenses
Domestic Climate Change Programme Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to domestic climate change.
International Climate Change Programme Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to international climate change issues, negotiating positions for climate change agreements and development of carbon markets.
Synthetic Greenhouse Gas Levy
This category is limited to the implementation and collection of the Synthetic Greenhouse Gas Levy.
Expenses, Revenue and Capital Expenditure
2014/15 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Total Appropriation |
7,061 | 875 | 7,936 |
Departmental Output Expenses |
|||
Domestic Climate Change Programme Policy Advice | 3,462 | 59 | 3,521 |
International Climate Change Programme Policy Advice | 3,550 | 816 | 4,366 |
Synthetic Greenhouse Gas Levy | 49 | - | 49 |
Funding for Departmental Output Expenses |
|||
Revenue from the Crown |
7,061 | 750 | 7,811 |
Domestic Climate Change Programme Policy Advice | 3,462 | - | 3,462 |
International Climate Change Programme Policy Advice | 3,550 | 750 | 4,300 |
Synthetic Greenhouse Gas Levy | 49 | - | 49 |
Revenue from Others |
- | 125 | 125 |
Domestic Climate Change Programme Policy Advice | - | 59 | 59 |
International Climate Change Programme Policy Advice | - | 66 | 66 |
Synthetic Greenhouse Gas Levy | - | - | - |
Reasons for Change in Appropriation
This Multi-category appropriation increased by $875,000 to $7.936 million for 2014/15. The increase is due to a reprioritisation of funds from the Carbon Monitoring Programme towards progressing work in relation to international climate change negotiations.
Environmental Management Obligations and Programmes (M29)
Overarching Purpose Statement
Scope of Appropriation
Departmental Output Expenses
Domestic Obligations and Programmes
This category is limited to contributing to and monitoring of domestic environmental management programmes and educational programmes promoting awareness of environmental issues.
International Obligations and Institutions Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to advice on international environmental arrangements, agreements and partnerships; contributing to negotiations with international parties on environmental issues in line with international arrangements, agreements and partnerships.
Expenses, Revenue and Capital Expenditure
2014/15 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Total Appropriation |
3,335 | (341) | 2,994 |
Departmental Output Expenses |
|||
Domestic Obligations and Programmes | 1,705 | (135) | 1,570 |
International Obligations and Institutions Policy Advice | 1,630 | (206) | 1,424 |
Funding for Departmental Output Expenses |
|||
Revenue from the Crown |
3,330 | (430) | 2,900 |
Domestic Obligations and Programmes | 1,700 | (150) | 1,550 |
International Obligations and Institutions Policy Advice | 1,630 | (280) | 1,350 |
Revenue from Others |
5 | 89 | 94 |
Domestic Obligations and Programmes | 5 | 15 | 20 |
International Obligations and Institutions Policy Advice | - | 74 | 74 |
Reasons for Change in Appropriation
This Multi-category appropriation decreased by $341,000 to $2.994 million for 2014/15. The decrease is primarily due to a reprioritisation of funding towards progressing work in relation to Marine and Exclusive Economic Zone (EEZ) legislative and regulatory policy work.
Environmental Protection Authority: Regulatory Functions (M29)
Overarching Purpose Statement
Scope of Appropriation
Non-Departmental Output Expenses
Compliance and Enforcement
This category is limited to the compliance and enforcement functions of the activities applicable to EPA's regulatory functions.
Decision Making
This category is limited to the enabling and supporting decision-making processes for approvals of the activities applicable to EPA's regulatory functions.
Expenses, Revenue and Capital Expenditure
2014/15 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Total Appropriation |
18,585 | (550) | 18,035 |
Non-Departmental Output Expenses |
|||
Compliance and Enforcement | 8,404 | - | 8,404 |
Decision Making | 10,181 | (550) | 9,631 |
End of Year Performance Reporting
Performance information for this appropriation will be reported by the Ministry for the Environment in a report appended to its Annual Report.
Reasons for Change in Appropriation
This Multi-category appropriation decreased by $550,000 to $18.035 million for 2014/15. The decrease is due to an expense transfer to 2015/16 to complete the strategic business cases for the Hazardous Substances (HS) Compliance Register and the Integrated HS Information System.
Improving Resource Management (M29)
Overarching Purpose Statement
Scope of Appropriation
Departmental Output Expenses
Developing and Implementing Treaty Settlements and Environmental Accords Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to environmental accords with Maori and Treaty settlements involving natural resources; contributing to negotiations with iwi and affected parties on environmental issues as part of developing deeds of settlement.
Marine Environment Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the marine environment.
Resource Management Implementation
This category is limited to the implementation of tools, frameworks and institutions and provision of advice, support, information, and guidance to the public, practitioners and wider natural resource sector in relation to resource management policy and practices.
Resource Management Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the management of natural and physical resources in New Zealand.
Water Management Implementation
This category is limited to activities associated with the implementation of water management policy and practises.
Water Management Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the quality, flow and availability of freshwater.
Non-Departmental Output Expenses
Water science and economics
This category is limited to water science and economic impact analyses, and guidance to support development of the National Objectives Framework.
Expenses, Revenue and Capital Expenditure
2014/15 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Total Appropriation |
32,840 | 327 | 33,167 |
Departmental Output Expenses |
|||
Developing and Implementing Treaty Settlements and Environmental Accords Policy Advice | 1,224 | 76 | 1,300 |
Marine Environment Policy Advice | 1,316 | 323 | 1,639 |
Resource Management Implementation | 11,685 | (2,667) | 9,018 |
Resource Management Policy Advice | 4,797 | 2,879 | 7,676 |
Water Management Implementation | 3,000 | 1,771 | 4,771 |
Water Management Policy Advice | 8,818 | (555) | 8,263 |
Non-Departmental Output Expenses |
|||
Water science and economics | 2,000 | (1,500) | 500 |
Funding for Departmental Output Expenses |
|||
Revenue from the Crown |
30,840 | 1,275 | 32,115 |
Developing and Implementing Treaty Settlements and Environmental Accords Policy Advice | 1,224 | 50 | 1,274 |
Marine Environment Policy Advice | 1,316 | 300 | 1,616 |
Resource Management Implementation | 11,685 | (2,775) | 8,910 |
Resource Management Policy Advice | 4,797 | 2,770 | 7,567 |
Water Management Implementation | 3,000 | 1,700 | 4,700 |
Water Management Policy Advice | 8,818 | (770) | 8,048 |
Revenue from Others |
- | 552 | 552 |
Developing and Implementing Treaty Settlements and Environmental Accords Policy Advice | - | 26 | 26 |
Marine Environment Policy Advice | - | 23 | 23 |
Resource Management Implementation | - | 108 | 108 |
Resource Management Policy Advice | - | 109 | 109 |
Water Management Implementation | - | 71 | 71 |
Water Management Policy Advice | - | 215 | 215 |
How Performance will be Assessed for this Appropriation
2014/15 | |||
---|---|---|---|
Assessment of Performance | Estimates Standard |
Supplementary Estimates Standard |
Total Standard |
Departmental Output Expenses |
|||
Resource Management Policy Advice |
|||
This category is intended to achieve policy advice to Ministers in relation to improving the resource management framework so that it is easy to use, provides certainty and predictability, and reduces unnecessary duplication and cost. It provides greater confidence for businesses to grow and create jobs, and greater certainty for communities to plan for their area's needs now and in the future. |
|||
Provide advice to Minister on forward agenda of priorities for national direction under the Resource Management Act 1991, on developing new national instruments and on exiting national instruments within agreed timeframes. |
30 September 2014 | 30 June 2015 | 30 June 2015 |
Non-Departmental Output Expenses |
|||
Water science and economics |
|||
This category is intended to build science and economics knowledge and capability through the development of the science underpinning the attributes for the National Objectives Framework, and the understanding of the economic impacts associated with setting limits for these attributes, so that regional councils can consider and understand the environmental and economic impacts of the choices they are making. |
|||
Number of attributes progressed for population in the National Objectives Framework, based on the investment. |
New measure | 3 | 3 |
Reasons for Change in Appropriation
This Multi-category appropriation increased by $327,000 to $33.167 million for 2014/15. This increase is due to the reprioritisation of funding for progressing work on:
- Marine and Exclusive Economic Zone (EEZ) legislative and regulatory policy work - $323,000
- the National Reporting template on water quality and quantity, identifying future information needs for future research, evidence to support policy processes and measuring, monitoring and evaluation framework and developing a pressure, state and impact model for freshwaters - $1.771 million
- the National Planning template to undertake research on metrics, geospatial content, urban content and definitions in plans - $212,000, and
- Treaty Settlements and Environmental Accords policy work - $76,000.
These increases are partially offset by:
- delays in the National Policy Statement - Freshwater Management (NPS-FM) amendment consultation and the processing of applications for Water Conservation Orders - $555,000, and
- an expense transfer of $1.500 million to 2015/16 for non-departmental output class ' Water science and economics' to build science and economics knowledge and capability through the development of the science underpinning the attributes for the National Objectives Framework, and the understanding of the economic impacts associated with setting limits for these attributes, so that regional councils can consider and understand the environmental and economic impacts of the choices they are making.
Mitigating Environmental Hazards and Waste (M29)
Overarching Purpose Statement
Scope of Appropriation
Departmental Output Expenses
Environmental Hazards and Waste Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the risks posed by environmental hazards and waste, including international agreements, conventions and obligations.
Waste Management and Minimisation
This category is limited to operational advice, implementation of tools, frameworks and institutions, and support, information and guidance to stakeholders in relation to waste management and minimisation.
Expenses, Revenue and Capital Expenditure
2014/15 | |||
---|---|---|---|
Estimates $000 |
Supplementary Estimates $000 |
Total $000 |
|
Total Appropriation |
3,450 | 54 | 3,504 |
Departmental Output Expenses |
|||
Environmental Hazards and Waste Policy Advice | 1,365 | 554 | 1,919 |
Waste Management and Minimisation | 2,085 | (500) | 1,585 |
Funding for Departmental Output Expenses |
|||
Revenue from the Crown |
3,450 | - | 3,450 |
Environmental Hazards and Waste Policy Advice | 1,365 | 525 | 1,890 |
Waste Management and Minimisation | 2,085 | (525) | 1,560 |
Revenue from Others |
- | 54 | 54 |
Environmental Hazards and Waste Policy Advice | - | 29 | 29 |
Waste Management and Minimisation | - | 25 | 25 |
Reasons for Change in Appropriation
This Multi-category appropriation increased by $54,000 to $3.504 million for 2014/15. This increase is primarily due to a reprioritisation of funding towards progressing policy work in relation to product stewardship scheme.