Supplementary estimates of appropriations

Vote Canterbury Earthquake Recovery - Supplementary Estimates 2014/15

APPROPRIATION MINISTER(S): Minister for Canterbury Earthquake Recovery (M85)

APPROPRIATION ADMINISTRATOR: Canterbury Earthquake Recovery Authority

RESPONSIBLE MINISTER FOR CANTERBURY EARTHQUAKE RECOVERY AUTHORITY: Minister for Canterbury Earthquake Recovery

Details of Appropriations and Capital Injections#

Annual and Permanent Appropriations#

  2014/15
Titles and Scopes of Appropriations by Appropriation Type Estimates
Budget
$000
Supplementary
Estimates
Budget
$000
Total
Budget
$000

Departmental Output Expenses

     

Managing the Recovery (M85)

This appropriation is limited to expenses incurred in managing the recovery from the Canterbury Earthquakes.
81,033 638 81,671

Policy Advice (M85)

This appropriation is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the Canterbury Earthquake Recovery.
3,800 2,296 6,096

Red Zone Property Acquisition Costs (M85)

This appropriation is limited to the costs associated with the management of Canterbury Red Zone properties before settlement.
1,000 (695) 305

Total Departmental Output Expenses

85,833 2,239 88,072

Departmental Capital Expenditure

     

Canterbury Earthquake Recovery Authority - Capital Expenditure PLA (M85)

This appropriation is limited to the purchase or development of assets by and for the use of the Canterbury Earthquake Recovery Authority, as authorised by section 24(1) of the Public Finance Act 1989.
1,000 (806) 194

Total Departmental Capital Expenditure

1,000 (806) 194

Non-Departmental Other Expenses

     

Acquisition of Canterbury Red Zone properties (M85)

This appropriation is limited to the acquisition of Red Zone properties in Canterbury.
20,000 (20,000) -

Anchor Project Land Acquisition Expenses (M85)

This appropriation is limited to legal, valuation, consulting and compensation expenses incurred in the purchase of anchor project land and for physical works for site clearance prior to development of anchor projects.
- 9,593 9,593

Contributions towards legal fees (M85)

This appropriation is limited to contributions towards legal fees incurred by property owners in the Red Zones in Canterbury selling properties to the Crown.
1,000 (966) 34

Mitigation of landslide hazards in the Port Hills (M85)

This appropriation is limited to assisting the Christchurch City Council to respond to landslide hazards in the Port Hills exacerbated by the Canterbury Earthquakes.
- 44 44

Total Non-Departmental Other Expenses

21,000 (11,329) 9,671

Non-Departmental Capital Expenditure

     

Anchor Project Land Acquisitions (M85)

This appropriation is limited to the acquisition of land and buildings and site clearance for the central city anchor projects.
150,000 (74,709) 75,291

Christchurch Bus Interchange (M85)

This appropriation is limited to the capital development of the Christchurch Bus Interchange as part of the central city anchor projects.
- 30,088 30,088

Total Non-Departmental Capital Expenditure

150,000 (44,621) 105,379

Multi-Category Expenses and Capital Expenditure

     

Canterbury Earthquake Recovery Land Ownership and Management MCA (M85)

The overarching purpose of this appropriation is to support the recovery of Canterbury through the purchase, clearance, maintenance and management of land affected by the Canterbury earthquakes.
- 62,910 62,910
Departmental Output Expenses
     
Acquisition and Disposal Expenses
This category is limited to the Crown's costs incurred in transferring land and buildings in Canterbury.
- 569 569
Non-Departmental Other Expenses
     
Demolition of Built Structures
This category is limited to removal and making safe of built structures on Crown land in Canterbury.
- 13,885 13,885
Management and Clearance of Land
This category is limited to costs arising from the ownership of Crown land in Canterbury affected by the earthquakes.
- 8,445 8,445
Mass Movement of Land
This category is limited to the assisting the Christchurch City Council to respond to the landslide hazards in the Port Hills exacerbated by the Canterbury earthquakes.
- 949 949
Purchase of Land and Buildings - Operating
This category is limited to the purchase of land and buildings in Canterbury affected by the earthquakes excluding land and buildings for anchor projects.
- 38,496 38,496
Vendor Legal Fees
This category is limited to a contribution towards vendor's legal fees when selling land and buildings in Canterbury to the Crown.
- 566 566

Development of Central City Anchor Projects MCA (M85)

The single overarching purpose of this appropriation is to support the development and delivery of Anchor Projects that form part of the Christchurch Central Recovery Plan.
- 68,736 68,736
Non-Departmental Other Expenses
     
Christchurch Bus Interchange and associated Transport Infrastructure - Operating
This category is limited to the development of the Christchurch Bus Interchange and associated transport infrastructure.
- 2,684 2,684
Christchurch Convention Centre - Operating
This category is limited to the development of the Christchurch Convention Centre.
- 3,223 3,223
Earthquake Memorial - Operating
This category is limited to the development of the Canterbury Earthquake Memorial.
- 806 806
Metro Sports Facility - Operating
This category is limited to the development of Metro Sports Facility.
- 2,133 2,133
Public Space - Operating
This category is limited to the development of the Crown owned public space.
- 17,746 17,746
Non-Departmental Capital Expenditure
     
Christchurch Bus Interchange and associated Transport Infrastructure - Capital
This category is limited to the capital development of the Christchurch Bus Interchange and associated transport infrastructure.
- 18,644 18,644
Public Space - Capital
This category is limited to the capital development of the Crown owned public space.
- 23,500 23,500

Ownership and Divestment of Anchor Projects MCA (M85)

The single overarching purpose of this appropriation is the management of Anchor Projects and the divestment of land and anchor projects that form part of the Christchurch Central Recovery Plan.
- 40,400 40,400
Non-Departmental Other Expenses
     
Christchurch Bus Interchange and associated Transport Infrastructure
This category is limited to the maintenance, operation, ownership and divestment of the Christchurch Bus Interchange and associated Transport Infrastructure.
- 3,500 3,500
Leasing Anchor Project Land
This category is limited to the financial impact of granting concessionary leases over anchor project land.
- 4,000 4,000
Metro Sports Facility
This category is limited to the maintenance, operation, ownership and divestment of the Metro Sports Facility.
- 2,000 2,000
Public Space
This category is limited to the maintenance, operation, ownership and divestment of the public space owned by the Crown in Christchurch City.
- 26,800 26,800
Sale of Land
This category is limited to the financial impact from the divestment of land and transaction costs incurred in the preparation for sale and the sale of land.
- 4,100 4,100

Procurement and Preparation of Land and Other Assets for the Development of Anchor Projects MCA (M85)

The single overarching purpose of this appropriation is procurement of land and other assets for anchor projects covered by the Christchurch Central Recovery Plan, making the lands and assets safe, and the holding of that land and those assets prior to development.
- 241,913 241,913
Non-Departmental Other Expenses
     
Pre-Development Holding Costs - Operating
This category is limited to the maintenance, operation and ownership of anchor project land and assets prior to commencement of developments.
- 2,509 2,509
Procurement of Land and Assets - Operating
This category is limited to the purchase, acquisition and clearance of land and assets for anchor project development.
- 53,057 53,057
Non-Departmental Capital Expenditure
     
Land and Asset Acquisition - Capital
This category is limited to the cost of land and assets acquired for anchor project development.
- 186,347 186,347

Total Multi-Category Expenses and Capital Expenditure

- 413,959 413,959

Total Annual and Permanent Appropriations

257,833 359,442 617,275

Multi-Year Appropriations#

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Non-Departmental Other Expenses

   

Anchor Project Development Costs for Te Papa o Otakaro / Avon River Precinct (M85)

This appropriation is limited to the development of Te Papa o Otakaro / Avon River precinct as part of the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2015
Original Appropriation 90,000
Adjustments to 2013/14 23,065
Adjustments for 2014/15 (96,312)
Adjusted Appropriation 16,753
Actual to 2013/14 Year End 8,882
Estimated Actual for 2014/15 7,871
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

Anchor Project Development Costs for the Bus Interchange (M85)

This appropriation is limited to the development costs of the central city Bus Interchange as part of the central city anchor projects.

Commences: 01 October 2013

Expires: 30 June 2015
Original Appropriation 52,400
Adjustments to 2013/14 -
Adjustments for 2014/15 (51,225)
Adjusted Appropriation 1,175
Actual to 2013/14 Year End 1,175
Estimated Actual for 2014/15 -
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

Anchor Project Development Costs for the Christchurch Stadium (M85)

This appropriation is limited to the development of the Christchurch Stadium as part of the central city anchor projects.

Commences: 01 July 2014

Expires: 30 June 2015
Original Appropriation 4,000
Adjustments to 2013/14 -
Adjustments for 2014/15 (4,000)
Adjusted Appropriation -
Actual to 2013/14 Year End -
Estimated Actual for 2014/15 -
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

Anchor Project Development Costs for the City Frame (M85)

This appropriation is limited to the development of the City Frame as part of the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2015
Original Appropriation 71,000
Adjustments to 2013/14 (11,664)
Adjustments for 2014/15 (56,508)
Adjusted Appropriation 2,828
Actual to 2013/14 Year End 2,175
Estimated Actual for 2014/15 653
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

Anchor Project Development Costs for the Convention Centre (M85)

This appropriation is limited to the development of the Convention Centre as part of the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2015
Original Appropriation 7,000
Adjustments to 2013/14 1,967
Adjustments for 2014/15 3,777
Adjusted Appropriation 12,744
Actual to 2013/14 Year End 1,986
Estimated Actual for 2014/15 10,758
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

Anchor Project Development Costs for the Metro Sports Facility (M85)

This appropriation is limited to the development of the Metro Sports Facility as part of the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2015
Original Appropriation 9,000
Adjustments to 2013/14 984
Adjustments for 2014/15 (7,133)
Adjusted Appropriation 2,851
Actual to 2013/14 Year End 1,638
Estimated Actual for 2014/15 1,213
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

Anchor Project Development Costs for the Transport Plan (M85)

This appropriation is limited to the development and implementation of the Transport Plan as part of the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2015
Original Appropriation 12,000
Adjustments to 2013/14 (11,000)
Adjustments for 2014/15 (660)
Adjusted Appropriation 340
Actual to 2013/14 Year End 340
Estimated Actual for 2014/15 -
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

Bad and Doubtful Debts (M85)

The appropriation is limited to recognition of bad and doubtful debts arising from the implementation of the central city recovery plan.

Commences: 01 March 2015

Expires: 30 June 2017
Original Appropriation 500
Adjustments to 2013/14 -
Adjustments for 2014/15 -
Adjusted Appropriation 500
Actual to 2013/14 Year End -
Estimated Actual for 2014/15 300
Estimated Actual for 2015/16 200
Estimated Appropriation Remaining -

Canterbury Earthquake Memorial (M85)

This appropriation is limited to the development of the Canterbury Earthquake Memorial as part of the central city anchor projects.

Commences: 01 May 2014

Expires: 30 June 2015
Original Appropriation 10,000
Adjustments to 2013/14 -
Adjustments for 2014/15 (9,576)
Adjusted Appropriation 424
Actual to 2013/14 Year End -
Estimated Actual for 2014/15 424
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

Holding Costs for Land Acquired for Anchor Projects (M85)

This appropriation is limited to the management of the land acquired for the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2015
Original Appropriation 19,000
Adjustments to 2013/14 866
Adjustments for 2014/15 (15,009)
Adjusted Appropriation 4,857
Actual to 2013/14 Year End 2,597
Estimated Actual for 2014/15 2,260
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

Impairment of Improvements (M85)

This appropriation is limited to the impairment of improvements purchased in conjunction with the land acquisition programme for the anchor projects.

Commences: 01 May 2014

Expires: 30 June 2015
Original Appropriation 51,000
Adjustments to 2013/14 -
Adjustments for 2014/15 -
Adjusted Appropriation 51,000
Actual to 2013/14 Year End 39,775
Estimated Actual for 2014/15 11,225
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

Implementation of transport solutions to deliver An Accessible City in Christchurch (M85)

This appropriation is limited to the development and implementation of the accessible city chapter of the Christchurch Central Recovery Plan as part of the central city anchor projects.

Commences: 01 May 2014

Expires: 30 June 2015
Original Appropriation 75,000
Adjustments to 2013/14 -
Adjustments for 2014/15 (70,859)
Adjusted Appropriation 4,141
Actual to 2013/14 Year End 656
Estimated Actual for 2014/15 3,485
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

Red Zone Property Management Costs (M85)

This appropriation is limited to the costs associated with the management of Canterbury Red Zone properties after settlement.

Commences: 01 July 2014

Expires: 30 June 2015
Original Appropriation 70,000
Adjustments to 2013/14 -
Adjustments for 2014/15 (59,796)
Adjusted Appropriation 10,204
Actual to 2013/14 Year End -
Estimated Actual for 2014/15 10,204
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

Residential Red Zone Property Demolition (M85)

This appropriation is limited to tasks necessary to proceed with and expedite demolitions associated with the Canterbury earthquakes and related compensation to Residential Red Zone property owners.

Commences: 01 July 2014

Expires: 30 June 2015
Original Appropriation 31,000
Adjustments to 2013/14 -
Adjustments for 2014/15 1,635
Adjusted Appropriation 32,635
Actual to 2013/14 Year End -
Estimated Actual for 2014/15 32,635
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

Total Annual, Permanent and Multi-Year Appropriations#

  2014/15
  Estimates
Budget
$000
Supplementary
Estimates
Budget
$000
Total
Budget
$000
Total Annual and Permanent Appropriations 257,833 359,442 617,275
Total MYA Non-Departmental Other Expenses Forecasts 312,574 (231,546) 81,028

Total Annual and Permanent Appropriations and Multi-Year Appropriation Forecasts

570,407 127,896 698,303

Capital Injection Authorisations#

  2014/15
  Estimates Budget
$000
Supplementary
Estimates Budget
$000
Total Budget
$000
Canterbury Earthquake Recovery Authority - Capital Injection (M85) - - -

Supporting Information#

Part 1 - Vote as a Whole#

1.2 - Trends in the Vote

Summary of Financial Activity

  2014/15
    Supplementary Estimates  
  Estimates
$000
Departmental
Transactions
$000
Non-Departmental
Transactions
$000
Total
Transactions
$000
Total
$000

Appropriations

         
Output Expenses 85,833 2,239 - 2,239 88,072
Benefits or Related Expenses - N/A - - -
Borrowing Expenses - - - - -
Other Expenses 333,574 - (242,875) (242,875) 90,699
Capital Expenditure 151,000 (806) (44,621) (45,427) 105,573
Intelligence and Security Department Expenses and Capital Expenditure - - N/A - -
Multi-Category Expenses and Capital Expenditure (MCA)          
Output Expenses - 569 - 569 569
Other Expenses - - 184,899 184,899 184,899
Capital Expenditure - N/A 228,491 228,491 228,491

Total Appropriations

570,407 2,002 125,894 127,896 698,303

Crown Revenue and Capital Receipts

         
Tax Revenue - N/A - - -
Non-Tax Revenue 179,292 N/A (173,089) (173,089) 6,203
Capital Receipts 50,000 N/A (50,000) (50,000) -

Total Crown Revenue and Capital Receipts

229,292 N/A (223,089) (223,089) 6,203

1.4 - Reconciliation of Changes in Appropriation Structure

The table below show changes in appropriation structure in 2014/15 relating to the introduction of 3 new multi-category appropriations including Procurement and Preparation of Land and Other Assets for the Development of Anchor Projects MCA, Development of Central City Anchor Projects MCA and Canterbury Earthquake Recovery Land Ownership and Management MCA. These 3 new multi-category appropriations replace 10 multi-year appropriations and 7 annual appropriations.

The final column includes whole of life appropriation when it is a multi-year appropriation. If the transfer of funding from multi-year appropriations to the new multi-category appropriations covers expenditure in future years, the profile across years is included. This table should be read in conjunction with the "Reasons for Change in Appropriation" in Part 2 and Part 3 for each appropriation. The "Reasons for Change in Appropriation" in Part 2 and Part 3 for each appropriation explains the details of new funding and transfers from previous years.

In some cases the new categories will appear more than once - for example the Public Realm and Bus Interchange and associated Transport Infrastructure - Operating and Capital. The sum of the amounts transferred to that category will equal the figures in Supplementary Estimates and the Estimates.

Development of Central City Anchor Projects MCA

Estimates 2014/15
(Estimates)
$000
Supplementary Estimates
(Changes during the year)
Amount
Moved
$000
New Structure 2014/15
(Restated)
$000

Non-Departmental Other Expense

     

Non-Departmental Other Expense

 
Implement of transport solution to deliver An Accessible City for Christchurch (MYA) 75,000 Transfer to new MCA categories as detailed below (70,859) Implement of transport solution to deliver An Accessible City for Christchurch (MYA) 4,141
Anchor Project Development Costs for the Transport Plan (MYA) 1,000 Transfer to the new MCA category as detailed below (660) Anchor Project Development Costs for the Transport Plan (MYA) 340
       

Development of Central City Anchor Project - MCA

 
       

Non-Departmental Other Expenses

 
    Transfer from Implement of transport solution to deliver An Accessible City for Christchurch (MYA) 66,859 Christchurch Bus Interchange and associated Transport Infrastructure - Operating  
        2014/15 2,684
        2015/16 34,235
        2016/17 30,600
    Transfer from Anchor Project Development Costs for the Transport Plan (MYA) 660    
       

Development of Central City Anchor Project - MCA

 
       

Non-Departmental Capital Expenditure

 
    Transfer from Implement of Transport Solution to deliver An Accessible City for Christchurch (MYA) 4,000 Christchurch Bus Interchange and associated Transport Infrastructure - Capital  
        2014/15 600
        2015/16 3,400
Transport
76,000
 
-
Transport
76,000

Non-Departmental Other Expense

     

Non-Departmental Other Expense

 
Anchor Project Development Costs for the Bus Interchange (MYA) 52,400 Transfer to new appropriations as detailed below (51,225) Anchor Project Development Costs for the Bus Interchange (MYA) 1,175
       

Non-Departmental Capital Expenditure

 
    Transfer from Non-Departmental Other Expense - Anchor Project Development Costs for the Bus Interchange (MYA) 30,088 Anchor Project Development Costs for the Bus Interchange 30,088
       

Development of Central City Anchor Project - MCA

 
       

Non-Departmental Capital Expenditure

 
    Transfer from Non-Departmental Capital Expenditure - Anchor Project Development Costs for the Bus Interchange 18,044 Christchurch Bus Interchange and associated Transport Infrastructure - Capital 18,044
Bus Interchange
52,400
2013/14 Unappropriated Expenditure
(3,093)
Bus Interchange
49,307

Christchurch Bus Interchange and associated Transport Infrastructure

128,400

2013/14 Unappropriated Expenditure

(3,093)

Christchurch Bus Interchange and associated Transport Infrastructure

125,307

Non-Departmental Other Expense

     

Non-Departmental Other Expense

 
Anchor Project Development Costs for Te Papa Otakaro / Avon River Precinct (MYA) 113,065 Transfer to new MCA categories as detailed below (96,312) Anchor Project Development Costs for Te Papa Otakaro/ Avon River Precinct (MYA) 16,753
       

Development of Central City Anchor Project - MCA

 
       

Non-Departmental Other Expenses

 
    Transfer from Anchor Project Development Costs for Te Papa Otakaro / Avon River Precinct (MYA) 76,312 Public Space - Operating  
        2014/15 17,746
        2015/16 58,566
       

Non-Departmental Capital Expenditure

 
    Transfer from Anchor Project Development Costs for Te Papa Otakaro / Avon River Precinct (MYA) 20,000 Public Space - Capital  
        2014/15 10,000
        2015/16 10,000
Avon River
113,065
 
-
Avon River
113,065

Non-Departmental Other Expense

     

Non-Departmental Other Expense

 
Anchor Project Development Costs for the City Frame (MYA) 59,336 Transfer to new MCA categories as detailed below (56,508) Anchor Project Development Costs for the City Frame (MYA) 2,828
       

Development of Central City Anchor Project - MCA

 
       

Non-Departmental Other Expenses

 
    Transfer from Anchor Project Development Costs for the City Frame (MYA) 6,508 Public Space - Operating  
        2015/16 6,508
       

Non-Departmental Capital Expenditure

 
    Transfer from Anchor Project Development Costs for the City Frame (MYA) 50,000 Public Space -Capital  
        2014/15 12,500
        2015/16 25,000
        2016/17 12,500
The Frame
59,336
  -
The Frame
59,336

Public Space

172,401

 
-

Public Space

172,401

Non-Departmental Other Expense

     

Non-Departmental Other Expense

 
Canterbury Earthquake Memorial (MYA) 10,000 Transfer to new MCA categories as detailed below (9,576) Canterbury Earthquake Memorial (MYA) 424
       

Development of Central City Anchor Project - MCA

 
       

Non-Departmental Other Expenses

 
    Transfer from Canterbury Earthquake Memorial (MYA) 806 Earthquake memorial - Operating 806
       

Non-Departmental Capital Expenditure

 
    Transfer from Canterbury Earthquake Memorial (MYA) 9,770 Earthquake memorial - Capital  
        2015/16 9,770

Memorial

10,000

New Funding

1,000

Memorial

11,000

Non-Departmental Other Expenses

     

Non-Departmental Other Expenses

 
Anchor Project Development Costs for the Christchurch Stadium (MYA) 4,000 Transfer to the new MCA category as detailed below (4,000) Anchor Project Development Costs for the Christchurch Stadium (MYA) -
       

Development of Central City Anchor Project - MCA

 
       

Non-Departmental Other Expenses

 
    Transfer from Anchor Project Development Costs for the Christchurch Stadium (MYA) 4,000 Christchurch Stadium -Operating  
        2015/16 4,000

Stadium

4,000

 

-

Stadium

4,000

Non-Departmental Other Expenses

     

Non-Departmental Other Expenses

 
Anchor Project Development Costs for the Convention Centre (MYA) 8,967 Transfer to new MCA categories as detailed below 3,777 Anchor Project Development Costs for the Convention Centre (MYA) 12,744
       

Development of Central City Anchor Project - MCA

 
       

Non-Departmental Other Expenses

 
    Transfer from Anchor Project Development Costs for the Convention Centre (MYA) 3,223 Christchurch Convention Centre -Operating 3,223
       

Non-Departmental Capital Expenditure

 
    Transfer from Anchor Project Development Costs for the Convention Centre (MYA) 1,000 Christchurch Convention Centre - Capital  
        2015/16 1,000

Convention Centre

8,967

New Funding

8,000

Convention Centre

16,967

Non-Departmental Other Expenses

     

Non-Departmental Other Expenses

 
Anchor Project Development Costs for the Metro Sports Facility (MYA) 9,984 Transfer to new MCA categories as detailed below (7,133) Anchor Project Development Costs for the Metro Sports Facility (MYA) 2,851
       

Development of Central City Anchor Project - MCA

 
       

Non-Departmental Other Expenses

 
    Transfer from Anchor Project Development Costs for the Metro Sports Facility (MYA) 6,133 Metro Sports Facility -Operating  
        2014/15 2,133
        2015/16 4,000
       

Non-Departmental Capital Expenditure

 
    Transfer from Anchor Project Development Costs for the Metro Sports Facility (MYA) 1,000 Metro Sports Facility - Capital  
        2015/16 1,000

Metro Sports Facility

9,984

 

-

Metro Sports Facility

9,984

Departmental Output Expenses

     

Departmental Output Expenses

 
Managing the Recovery 81,033 Transfer to the new MCA category as detailed below 638 Managing the Recovery 81,671
       

Development of Central City Anchor Project - MCA

 
       

Non-Departmental Capital Expenditure

 
    Transfer from Managing the Recovery 2,000 Public Space -Capital  
        2014/15 1,000
        2015/16 1,000

Managing the Recovery

81,033

Approved expense transfer from 2013/14

2,638

Managing the Recovery

81,671

       

Public Space

2,000

Procurement and Preparation of Land and Other Assets for the Development of Anchor Projects MCA

Estimates 2014/15
(Estimates)
$000
Supplementary Estimates
(Changes during the year)
Amount
Moved
$000
New Structure 2014/15
(Restated)
$000

Non-Departmental Other Expenses

     

Non-Departmental Other Expenses

 
Holding Costs for Land Acquired for Anchor Projects (MYA) 19,866 Transfer to new appropriations as detailed below (15,009) Holding Costs for Land Acquired for Anchor Projects (MYA) 4,857
       

Non-Departmental Other Expenses

 
    Transfer from Holding Costs for Land Acquired for Anchor Projects (MYA) 500 Bad and Doubtful Debt (MYA)  
        2014/15 300
        2015/16 200
       

Procurement and Preparation of Land and Other Assets for the Development of Anchor Projects - MCA

 
       

Non-Departmental Other Expenses

 
    Transfer from Holding Costs for Land Acquired for Anchor Projects (MYA) 14,509 Pre-Development Holding Costs- Operating  
        2014/15 2,509
        2015/16 6,000
        2016/17 6,000

Holding Costs

19,866

  -

Holding Costs

19,366

       

Bad and Doubtful Debt

500

Non-Departmental Capital Expenditure

     

Non-Departmental Capital Expenditure

 
Anchor Project Land Acquisitions 150,000 Transfer to new appropriations as detailed below (218,867) Land Acquisition Costs for Anchor Projects 75,291
       

Non-Departmental Other Expenses

 
    Transfer from Anchor Project Land Acquisitions 9,593 Anchor Project Land Acquisition Expenses 9,593
       

Procurement and Preparation of Land and Other Assets for the Development of Anchor Projects - MCA

 
       

Non-Departmental Other Expenses

 
    Transfer from Anchor Project Land Acquisitions 157 Procurement of Land and Assets - Operating 157
       

Non-Departmental Capital Expenditure

 
    Transfer from Anchor Project Land Acquisitions 209,117 Land and Asset Acquisition - Capital  
        2014/15 186,347
        2015/16 22,770

Land Acquisition

150,000

Approved expense transfer from 2013/14

144,158

Land Acquisition

294,158

Canterbury Earthquake Recovery Land Ownership and Management - MCA

Estimates 2014/15
(Estimates)
$000
Supplementary Estimates
(Changes during the year)
Amount
Moved
$000
New Structure 2014/15
(Restated)
$000

Departmental Output Expense

     

Departmental Output Expense

 
Red Zone Property Acquisition Costs 1,000 Transfer to the new MCA category as detailed below (695) Red Zone Property Acquisition Costs 305
       

Canterbury Earthquake Recovery Land Ownership and Management - MCA

 
       

Departmental Output Expense

 
    Transfer from Red Zone Property Acquisition Costs 1,469 Acquisition and Disposal Expenses  
        2014/15 569
        2015/16 900

Acquisition Costs

1,000

Approved expense transfer from 2013/14

774

Acquisition Costs

1,774

Non-Departmental Other Expenses

     

Non-Departmental Other Expenses

 
Red Zone Property Management Costs (MYA) 70,000 Transfer to new MCA categories as detailed below (59,796) Red Zone Property Management Costs (MYA) 10,204
       

Canterbury Earthquake Recovery Land Ownership and Management - MCA

 
       

Non-Departmental Other Expenses

 
    Transfer from Red Zone Property Management Costs (MYA) 73,745 Management and Clearance of Land  
        2014/15 8,445
        2015/16 22,300
        2016/17 43,000
           
    Transfer from Red Zone Property Management Costs (MYA) 10,000 Demolition of Built Structures 10,000

Property Management

70,000

Approved expense transfer from 2013/14

23,949

Property Management

93,949

Non-Departmental Other Expenses

     

Non-Departmental Other Expenses

 
Residential Red Zone Property Demolition (MYA) 31,000 Transfer to the new MCA category as detailed below 1,635 Residential Red Zone Property Demolition (MYA) 32,635
       

Canterbury Earthquake Recovery Land Ownership and Management - MCA

 
       

Non-Departmental Other Expenses

 
    Transfer from Residential Red Zone Property Demolition (MYA) 20,975 Demolition of Built Structures  
        2014/15 3,885
        2015/16 17,090

Property Demolition

31,000

Approved expense transfer from 2013/14 and new funding (third party revenue)

22,610

Property Demolition

53,610

Non-Departmental Other Expenses

     

Non-Departmental Other Expenses

 
Contribution towards legal fees 1,000 Transfer to the new MCA category as detailed below (966) Contribution towards legal fees 34
       

Canterbury Earthquake Recovery Land Ownership and Management - MCA

 
       

Non-Departmental Other Expenses

 
    Transfer from Contribution towards legal fees 1,966 Vendor Legal Fees  
        2014/15 566
        2015/16 1,400

Legal fees

1,000

Approved expense transfer from 2013/14

1,000

Legal fees

2,000

Non-Departmental Other Expenses

     

Non-Departmental Other Expenses

 
Acquisition of Canterbury Red Zone properties 20,000 Transfer to new appropriations as detailed below (20,000) Acquisition of Canterbury Red Zone properties -
       

Non-Departmental Other Expenses

 
    Transfer from Acquisition of Canterbury Red Zone properties 44 Mitigation of landslide hazards in the Port Hills 44
       

Canterbury Earthquake Recovery Land Ownership and Management - MCA

 
       

Non-Departmental Other Expenses

 
    Transfer from Acquisition of Canterbury Red Zone properties 8,456 Mass Movement of Land  
        2014/15 949
        2015/16 7,507
    Transfer from Acquisition of Canterbury Red Zone properties 48,496 Purchase of Land and Buildings -Operating  
        2014/15 38,496
        2015/16 10,000

Property Acquisition

20,000

Approved expense transfer from 2013/14

36,996

Property Acquisition

56,996

Explanations of the reasons for changing the appropriation structure are noted in the details of each appropriation in Parts 2-4.

Part 2 - Details of Departmental Appropriations#

2.1 - Departmental Output Expenses

Managing the Recovery (M85)

Scope of Appropriation

This appropriation is limited to expenses incurred in managing the recovery from the Canterbury Earthquakes.

Reasons for Change in Appropriation

The appropriation increased by $638,000 to $81.671 million for 2014/15 due to:

  • transferring of $2.849 million from 2013/14
  • providing Advisory Service programme $789,000 which is funded by revenue from others.

Offset by:

  • transferring out $2 million to Non-Departmental appropriation for the development of performing arts programme
  • transferring out $1 million to Policy Advice appropriation after reprioritising work programmes.

Policy Advice (M85)

Scope of Appropriation

This appropriation is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the Canterbury Earthquake Recovery.

Reasons for Change in Appropriation

This appropriation increased by $2.296 million to $6.096 million for 2014/15. The increase mainly relates to:

  • a transfer of $1.296 million from 2013/14
  • a transfer of $1 million from Managing the Recovery after reprioritising work programmes.

Red Zone Property Acquisition Costs (M85)

Scope of Appropriation

This appropriation is limited to the costs associated with the management of Canterbury Red Zone properties before settlement.

Reasons for Change in Appropriation

This appropriation decreased by $695,000 to $305,000 for 2014/15. The decrease mainly relates to:

  • a transfer of $1.469 million to a newly created multi-category appropriation as a result of reorganisation of the appropriations for the Residential Red Zone programme.

Offset by:

  • a transfer of $774,000 from 2013/14.

2.3 - Departmental Capital Expenditure and Capital Injections

Canterbury Earthquake Recovery Authority - Capital Expenditure PLA (M85)

Scope of Appropriation

This appropriation is limited to the purchase or development of assets by and for the use of the Canterbury Earthquake Recovery Authority, as authorised by section 24(1) of the Public Finance Act 1989.

Capital Expenditure

  2014/15
  Estimates
$000
Supplementary
Estimates
$000
Total
$000
Forests/Agricultural - - -
Land - - -
Property, Plant and Equipment 1,000 (806) 194
Intangibles - - -
Other - - -

Total Appropriation

1,000 (806) 194

Reasons for Change in Appropriation

The decrease of capital expenditure is due to the fact that Canterbury Earthquake Recovery Authority has been transferred to a new Departmental Agency, under the Department of the Prime Minister and Cabinet from 1 February 2015.

Part 3 - Details of Non-Departmental Appropriations#

3.4 - Non-Departmental Other Expenses

Acquisition of Canterbury Red Zone properties (M85)

Scope of Appropriation

This appropriation is limited to the acquisition of Red Zone properties in Canterbury.

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation in an annex to the Annual Report for the Department of the Prime Minister and Cabinet.

Reasons for Change in Appropriation

This appropriation decreased by $20 million to nil for 2014/15. The decrease mainly relates to:

  • a transfer of $56.952 million to a newly created multi-category appropriation - Canterbury Earthquake Recovery Land Ownership and Management
  • a transfer of $44,000 to a newly created non-departmental other expense - Mitigation of Landslide hazards in the Port Hills.

Offset by:

  • a transfer of $36.996 million from 2013/14.

Anchor Project Development Costs for Te Papa o Otakaro / Avon River Precinct (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Anchor Project Development Costs for Te Papa o Otakaro / Avon River Precinct (M85)

This appropriation is limited to the development of Te Papa o Otakaro / Avon River precinct as part of the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2015
Original Appropriation 90,000
Adjustments to 2013/14 23,065
Adjustments for 2014/15 (96,312)
Adjusted Appropriation 16,753
Actual to 2013/14 Year End 8,882
Estimated Actual for 2014/15 7,871
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation in an annex to the Annual Report for the Department of the Prime Minister and Cabinet.

Reasons for Change in Appropriation

This appropriation was replaced by a newly created multi-category appropriation: Development of Central City Anchor Projects from 1 April 2015.

Anchor Project Development Costs for the Bus Interchange (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Anchor Project Development Costs for the Bus Interchange (M85)

This appropriation is limited to the development costs of the central city Bus Interchange as part of the central city anchor projects.

Commences: 01 October 2013

Expires: 30 June 2015
Original Appropriation 52,400
Adjustments to 2013/14 -
Adjustments for 2014/15 (51,225)
Adjusted Appropriation 1,175
Actual to 2013/14 Year End 1,175
Estimated Actual for 2014/15 -
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation in an annex to the Annual Report for the Department of the Prime Minister and Cabinet.

Reasons for Change in Appropriation

This appropriation was replaced by a newly created multi-category appropriation - Development of Central City Anchor Projects from 1 April 2015.

Anchor Project Development Costs for the Christchurch Stadium (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Anchor Project Development Costs for the Christchurch Stadium (M85)

This appropriation is limited to the development of the Christchurch Stadium as part of the central city anchor projects.

Commences: 01 July 2014

Expires: 30 June 2015
Original Appropriation 4,000
Adjustments to 2013/14 -
Adjustments for 2014/15 (4,000)
Adjusted Appropriation -
Actual to 2013/14 Year End -
Estimated Actual for 2014/15 -
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation in an annex to the Annual Report for the Department of the Prime Minister and Cabinet.

Reasons for Change in Appropriation

This appropriation was replaced by a newly created multi-category appropriation - Development of Central City Anchor Projects from 1 April 2015.

Anchor Project Development Costs for the City Frame (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Anchor Project Development Costs for the City Frame (M85)

This appropriation is limited to the development of the City Frame as part of the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2015
Original Appropriation 71,000
Adjustments to 2013/14 (11,664)
Adjustments for 2014/15 (56,508)
Adjusted Appropriation 2,828
Actual to 2013/14 Year End 2,175
Estimated Actual for 2014/15 653
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation in an annex to the Annual Report for the Department of the Prime Minister and Cabinet.

Reasons for Change in Appropriation

This appropriation was replaced a newly created appropriation - Development of Central City Anchor Projects from 1 April 2015.

Anchor Project Development Costs for the Convention Centre (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Anchor Project Development Costs for the Convention Centre (M85)

This appropriation is limited to the development of the Convention Centre as part of the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2015
Original Appropriation 7,000
Adjustments to 2013/14 1,967
Adjustments for 2014/15 3,777
Adjusted Appropriation 12,744
Actual to 2013/14 Year End 1,986
Estimated Actual for 2014/15 10,758
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation in an annex to the Annual Report for the Department of the Prime Minister and Cabinet.

Reasons for Change in Appropriation

This multi-year appropriation increased by $3.777 million. The increase mainly relates to:

  • $8 million for accelerating the planning process for the Christchurch Convention Centre Precinct.

Offset by:

  • a transfer of $4.223 million to a newly created multi-category appropriation - Development of Central City Anchor Projects.

This appropriation was replaced by the newly created multi-category appropriation from 1 April 2015.

Anchor Project Development Costs for the Metro Sports Facility (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Anchor Project Development Costs for the Metro Sports Facility (M85)

This appropriation is limited to the development of the Metro Sports Facility as part of the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2015
Original Appropriation 9,000
Adjustments to 2013/14 984
Adjustments for 2014/15 (7,133)
Adjusted Appropriation 2,851
Actual to 2013/14 Year End 1,638
Estimated Actual for 2014/15 1,213
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation in an annex to the Annual Report for the Department of the Prime Minister and Cabinet.

Reasons for Change in Appropriation

This appropriation was replaced by a newly created multi-category appropriation - Development of Central City Anchor Projects from 1 April 2015.

Anchor Project Development Costs for the Transport Plan (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Anchor Project Development Costs for the Transport Plan (M85)

This appropriation is limited to the development and implementation of the Transport Plan as part of the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2015
Original Appropriation 12,000
Adjustments to 2013/14 (11,000)
Adjustments for 2014/15 (660)
Adjusted Appropriation 340
Actual to 2013/14 Year End 340
Estimated Actual for 2014/15 -
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation in an annex to the Annual Report for the Department of the Prime Minister and Cabinet.

Reasons for Change in Appropriation

This appropriation was replaced by Christchurch Bus Interchange Non-Departmental Capital Expenditure from 1 October 2014.

Anchor Project Land Acquisition Expenses (M85)

Scope of Appropriation

This appropriation is limited to legal, valuation, consulting and compensation expenses incurred in the purchase of anchor project land and for physical works for site clearance prior to development of anchor projects.

What is Intended to be Achieved with this Appropriation

This category is intended to achieve the successful purchase of land and assets and the clearance and making ready of land for development or sale.

How Performance will be Assessed and End of Year Reporting Requirements

  2014/15
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard

Transaction costs associated with the acquisition land and improvements have been incurred in line with the scope of the appropriation.

100% 100% 100%

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation in an annex to the Annual Report for the Department of the Prime Minister and Cabinet.

Service Providers

  2014/15    
Provider Estimates
$000
Supplementary
Estimates
$000
Total
$000
Reporting to the
House
Expiry of
Resourcing
Commitment
Various professional service providers for acquisition of land 5,000 (539) 4,461 See above 2014/15
Various lead contractors for land clearance and making ready of land for development or sale 4,750 (450) 4,300 See above 2014/15

Reasons for Change in Appropriation

This is a new appropriation in 2014/15 for $9.593 million. The increase mainly relates to a transfer from Non-Departmental Capital Expenditure - Anchor Project Land Acquisitions.

Bad and Doubtful Debts (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Bad and Doubtful Debts (M85)

The appropriation is limited to recognition of bad and doubtful debts arising from the implementation of the central city recovery plan.

Commences: 01 March 2015

Expires: 30 June 2017
Original Appropriation 500
Adjustments to 2013/14 -
Adjustments for 2014/15 -
Adjusted Appropriation 500
Actual to 2013/14 Year End -
Estimated Actual for 2014/15 300
Estimated Actual for 2015/16 200
Estimated Appropriation Remaining -

What is Intended to be Achieved with this Appropriation

This appropriation is intended to achieve accurate reporting of the value of Crown receivables for various programmes managed by the Canterbury Earthquake Recovery Authority.

How Performance will be Assessed and End of Year Reporting Requirements

  2014/15
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard

Bad and doubtful debts are recognised appropriately within the financial statements.

- 100% 100%

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation as in annex to the Annual Report for the Department of the Prime Minister and Cabinet.

Reasons for Change in Appropriation

This multi-year appropriation increased by $300,000 for 2014/15 and $200,000 for 2015/16. The increase mainly relates to a transfer of $500,000 from non-departmental other expense - Holding Costs for Land Acquired for Anchor Projects.

Canterbury Earthquake Memorial (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Canterbury Earthquake Memorial (M85)

This appropriation is limited to the development of the Canterbury Earthquake Memorial as part of the central city anchor projects.

Commences: 01 May 2014

Expires: 30 June 2015
Original Appropriation 10,000
Adjustments to 2013/14 -
Adjustments for 2014/15 (9,576)
Adjusted Appropriation 424
Actual to 2013/14 Year End -
Estimated Actual for 2014/15 424
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation in an annex to the Annual Report for the Department of the Prime Minister and Cabinet.

Reasons for Change in Appropriation

This appropriation decreased by $9.576 million to $424,000 in 2014/15. The decrease mainly relates to:

  • a transfer of $10.576 million to a newly created multi-category appropriation - Development of Central City Anchor Projects.

Offset by:

  • $1 million new funding from Christchurch Earthquake Mayoral Relief Fund.

Contributions towards legal fees (M85)

Scope of Appropriation

This appropriation is limited to contributions towards legal fees incurred by property owners in the Red Zones in Canterbury selling properties to the Crown.

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation in an annex to the Annual Report for the Department of the Prime Minister and Cabinet.

Reasons for Change in Appropriation

This appropriation decreased by $966,000 to $34,000 for 2014/15. The decrease mainly relates to:

  • a transfer of $1.966 million to a newly created multi-category appropriation - Canterbury Earthquake Recovery Land Ownership and Management.

Offset by:

  • a transfer of $1 million from 2013/14.

Holding Costs for Land Acquired for Anchor Projects (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Holding Costs for Land Acquired for Anchor Projects (M85)

This appropriation is limited to the management of the land acquired for the central city anchor projects.

Commences: 01 July 2013

Expires: 30 June 2015
Original Appropriation 19,000
Adjustments to 2013/14 866
Adjustments for 2014/15 (15,009)
Adjusted Appropriation 4,857
Actual to 2013/14 Year End 2,597
Estimated Actual for 2014/15 2,260
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation in an annex to the Annual Report for the Department of the Prime Minister and Cabinet.

Reasons for Change in Appropriation

This appropriation decreased by $15.009 million to $4.857 million in 2014/15. The decrease mainly relates to:

  • a transfer of $14.509 million to the newly created multi-category appropriation - Procurement and Preparation of Land and Other Assets for the Development of Anchor Projects
  • a transfer of $500,000 to non-departmental other expenses - Bad and Doubtful Debts.

Implementation of transport solutions to deliver An Accessible City in Christchurch (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Implementation of transport solutions to deliver An Accessible City in Christchurch (M85)

This appropriation is limited to the development and implementation of the accessible city chapter of the Christchurch Central Recovery Plan as part of the central city anchor projects.

Commences: 01 May 2014

Expires: 30 June 2015
Original Appropriation 75,000
Adjustments to 2013/14 -
Adjustments for 2014/15 (70,859)
Adjusted Appropriation 4,141
Actual to 2013/14 Year End 656
Estimated Actual for 2014/15 3,485
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation in an annex to the Annual Report for the Department of the Prime Minister and Cabinet.

Reasons for Change in Appropriation

This appropriation is replaced by a newly created multi-category appropriation - Development of Central City Anchor Projects from 1 April 2015.

Mitigation of landslide hazards in the Port Hills (M85)

Scope of Appropriation

This appropriation is limited to assisting the Christchurch City Council to respond to landslide hazards in the Port Hills exacerbated by the Canterbury Earthquakes.

What is Intended to be Achieved with this Appropriation

This appropriation is intended to achieve a co-ordinated approach between the Crown and the Christchurch City Council for the mitigation of the landslide hazards in the Port Hills.

How Performance will be Assessed and End of Year Reporting Requirements

  2014/15
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard

The percentage of agreed work programme for the mitigation of landslide hazards in the Port Hills underway or completed.

- 0.5% 0.5%

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation in an annex to the Annual Report for the Department of the Prime Minister and Cabinet.

Service Providers

  2014/15    
Provider Estimates
$000
Supplementary
Estimates
$000
Total
$000
Reporting to the
House
Expiry of
Resourcing
Commitment
Various lead contractors for landslide hazards management have not been appointed - 44 44 See above 2014/15

Reasons for Change in Appropriation

This is a new appropriation of $44,000 for 2014/15. The increase relates a transfer from non-departmental other expenses - Acquisition of Canterbury Red Zone Properties to fund the delivery of the agreed work programme for the mitigation of landslide hazards in the Port Hills.

Red Zone Property Management Costs (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Red Zone Property Management Costs (M85)

This appropriation is limited to the costs associated with the management of Canterbury Red Zone properties after settlement.

Commences: 01 July 2014

Expires: 30 June 2015
Original Appropriation 70,000
Adjustments to 2013/14 -
Adjustments for 2014/15 (59,796)
Adjusted Appropriation 10,204
Actual to 2013/14 Year End -
Estimated Actual for 2014/15 10,204
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation in an annex to the Annual Report for the Department of the Prime Minister and Cabinet.

Reasons for Change in Appropriation

This appropriation decreased by $59.796 million for 2014/15. The decrease mainly relates to:

  • a transfer of $83.745 million to a newly created multi-category appropriation - Canterbury Earthquake Recovery Land Ownership and Management.

Offset by:

  • a transfer of $23.949 million from 2013/14.

Residential Red Zone Property Demolition (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Residential Red Zone Property Demolition (M85)

This appropriation is limited to tasks necessary to proceed with and expedite demolitions associated with the Canterbury earthquakes and related compensation to Residential Red Zone property owners.

Commences: 01 July 2014

Expires: 30 June 2015
Original Appropriation 31,000
Adjustments to 2013/14 -
Adjustments for 2014/15 1,635
Adjusted Appropriation 32,635
Actual to 2013/14 Year End -
Estimated Actual for 2014/15 32,635
Estimated Actual for 2015/16 -
Estimated Appropriation Remaining -

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation in an annex to the Annual Report for the Department of the Prime Minister and Cabinet.

Reasons for Change in Appropriation

This appropriation increased by $1.635 million for 2014/15. The increase mainly relates to:

  • a transfer of $22.610 million from 2013/14.

Offset by:

  • a transfer of $20.975 million to a newly created multi-category appropriation - Canterbury Earthquake Recovery Land Ownership and Management.

3.5 - Non-Departmental Capital Expenditure

Anchor Project Land Acquisitions (M85)

Scope of Appropriation

This appropriation is limited to the acquisition of land and buildings and site clearance for the central city anchor projects.

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation in an annex to the Annual Report for the Department of the Prime Minister and Cabinet.

Reasons for Change in Appropriation

This appropriation decreased by $74.709 million to $75.291 million for 2014/15. The decrease mainly relates to:

  • a transfer of $209.274 million to a newly created multi-category appropriation Procurement and Preparation of Land and Other Assets for the Development of Anchor Projects
  • a transfer of $9.593 million to Anchor Project Land Acquisition Expenses for the transaction costs of buying land.

Offset by:

  • an increase of $144.158 million due to delays in purchasing land in 2013/14.

Christchurch Bus Interchange (M85)

Scope of Appropriation

This appropriation is limited to the capital development of the Christchurch Bus Interchange as part of the central city anchor projects.

What is Intended to be Achieved with this Appropriation

This appropriation is intended to achieve the delivery of integrated transport solutions for the recovery of the central city and associated anchor projects including the successful development over the 13 months to June 2015 of a new Bus Interchange to provide greater Christchurch with a transport hub and offer an easy commute into the central city. The new interchange will support the integration of transport services across greater Christchurch.

How Performance will be Assessed and End of Year Reporting Requirements

  2014/15
Performance Measures Estimates
Standard
Supplementary
Estimates
Standard
Total
Standard

Christchurch Bus Interchange is on schedule for completion as determined by its business case.

- 100% 100%

End of Year Performance Reporting

The Minister for Canterbury Earthquake Recovery will report the performance information for this appropriation in an annex to the Annual Report for the Department of the Prime Minister and Cabinet.

Reasons for Change in Appropriation

This is a new appropriation of $30.088 million for 2014/15. The increase mainly relates to a transfer from non-departmental other expenses - Christchurch Bus Interchange.