Estimates of appropriations

Vote Prime Minister and Cabinet - Finance and Government Administration Sector - Estimates 2016/2017

APPROPRIATION MINISTER(S): Minister of Civil Defence (M11), Prime Minister (M52), Minister supporting Greater Christchurch Regeneration (M85), Minister for Communications (M88), Deputy Prime Minister (M89)

APPROPRIATION ADMINISTRATOR: Department of the Prime Minister and Cabinet

RESPONSIBLE MINISTER FOR DEPARTMENT OF THE PRIME MINISTER AND CABINET: Prime Minister

Overview of the Vote#

The Prime Minister is responsible for appropriations in Vote Prime Minister and Cabinet for the 2016/17 financial year which cover the following:

  • a total of over $4 million for free and frank advice on policy issues, services to facilitate inter-departmental coordination of policy development and leadership of a more collective approach to performance across the state sector
  • a total of nearly $6 million for secretariat services to Cabinet, Cabinet committees and the Executive Council, administration of the New Zealand Royal Honours system and coordination of the Government's legislation programme
  • a total of over $4 million for support services to the Governor-General and maintenance of the official residences
  • a total of just nearly $10 million for leadership, advice, coordination around national security matters, leading collaboration within the New Zealand intelligence community, managing the National Cyber Policy Office and providing assessments to support national security
  • a total of nearly $800,000 for the operation of the Science Advisory Committee and an ex gratia payment for the services of the Prime Minister's Chief Science Advisor
  • a total of over $1 million on Government House capital investment
  • a total of nearly $2 million under permanent legislative authority (Governor-General Act 2010) for payments for the salary, allowances, programme and travel expenses outside New Zealand of the Governor-General
  • a total of over $2 million on departmental capital expenditure
  • a total of $74,000 under permanent legislative authority (New Zealand Security Intelligence Service (NZSIS) Amendment (No. 2) Act 1999) for payments to the Commissioner of Security Warrants, and
  • a total of nearly $3 million for costs of ownership on Crown assets (Government Houses and their contents).

The Minister supporting Greater Christchurch Regeneration is responsible for appropriations in Vote Prime Minister and Cabinet for the 2016/17 year which cover the following:

  • a total of nearly $25 million for the provision of services supporting the regeneration of greater Christchurch.

The Minister of Civil Defence is responsible for appropriations in Vote Prime Minister and Cabinet for the 2016/17 financial year which cover the following:

  • a total of nearly $12 million for ensuring the effective delivery and responsiveness of New Zealand's civil defence emergency management services
  • a total of $2 million for emergency expense payments in line with the criteria as detailed in the National Civil Defence and Emergency Management (CDEM) Plan, and
  • a total of $889,000 in subsidies to Local Government for emergency management preparation.

The Minister for Communications is responsible for appropriations in Vote Prime Minister and Cabinet for the 2016/17 financial year which cover the following:

  • a total of over $5 million for carrying out the functions and services of a national CERT (a New Zealand computer emergency response organisation).

Details of these appropriations are set out in Parts 2-4.

Details of Appropriations and Capital Injections#

Annual and Permanent Appropriations#

  2015/16 2016/17
Titles and Scopes of Appropriations by Appropriation Type Final
Budgeted
$000
Estimated
Actual
$000
Budget
$000

Departmental Output Expenses

     

Canterbury Earthquake Recovery (M85)

This appropriation is limited to provision of services supporting the regeneration of greater Christchurch.
8,922 8,922 20,741

Cyber Security Services (M88)

This appropriation is limited to carrying out the functions and services of a national CERT (a New Zealand computer emergency response organisation).
- - 5,128

Supporting Flag Consideration Process (M89)

This appropriation is limited to advice and services to support public engagement and decision-making in the process to consider New Zealand's Flag.
6,266 4,766 -

Total Departmental Output Expenses

15,188 13,688 25,869

Departmental Capital Expenditure

     

Department of the Prime Minister and Cabinet - Capital Expenditure PLA (M52)

This appropriation is limited to the purchase or development of assets by and for the use of the Department of the Prime Minister and Cabinet, as authorised by section 24(1) of the Public Finance Act 1989.
975 975 2,450

Total Departmental Capital Expenditure

975 975 2,450

Non-Departmental Output Expenses

     

Regenerate Christchurch (M85)

This appropriation is limited to establishment costs and the development of strategies and planning activities, with communities, stakeholders and decision-makers, for the regeneration of areas in Christchurch.
2,000 2,000 -

Total Non-Departmental Output Expenses

2,000 2,000 -

Non-Departmental Other Expenses

     

Emergency Expenses (M11)

This appropriation is limited to payments to local authorities as provided for under the National CDEM Plan.
3,000 3,000 2,000

Emergency Management Preparedness Grants (M11)

This appropriation is limited to projects endorsed by CDEM Groups and managed or supported by the Ministry of Civil Defence & Emergency Management.
1,189 1,189 889

Ex Gratia Payment to the University of Auckland (M52)

This appropriation is limited to ex gratia payments to the University of Auckland to enable continued support of Professor Sir Peter Gluckman's own specialised research programme during his membership of the Science Advisory Committee.
120 120 120

Fees for the Commissioner of Security Warrants PLA (M52)

The appropriation under permanent legislative authority (the NZSIS Amendment (No. 2) Act 1999) will provide for payments to the Commissioner as an independent judicial officer for the authorisation of domestic security warrants.
74 74 74

Governor-General's Programme PLA (M52)

This appropriation is limited to expenses incurred on the Governor-General's Programme, as authorised by section 13 of the Governor-General Act 2010.
1,119 1,119 989

Governor-General's Salary and Allowance PLA (M52)

This appropriation is limited to expenses incurred on the salary, allowance and other payments to the Governor-General, as authorised by section 12 of the Governor-General Act 2010.
476 476 576

Governor-General's Travel Outside New Zealand PLA (M52)

This appropriation is limited to expenses incurred on the Governor-General's travel outside New Zealand, as authorised by section 14 of the Governor-General Act 2010.
357 357 307

Total Non-Departmental Other Expenses

6,335 6,335 4,955

Multi-Category Expenses and Capital Expenditure

     

Emergency Management MCA (M11)

The overarching purpose of this MCA is to support communities to be resilient by enhancing their capacity and capability to manage civil defence emergencies.
12,414 12,254 11,660
Departmental Output Expenses
     
Community Awareness and Readiness
This category is limited to the development and delivery of long-term national programmes to raise individual and community awareness and preparedness.
2,131 2,131 1,938
Emergency Sector and Support and Development
This category is limited to developing and implementing operational policies and projects, advice, assistance and information to the civil defence and emergency management sector.
5,988 5,828 5,574
Management of Emergencies
This category is limited to management of national emergency readiness, response and recovery, including support to local civil defence emergency management organisations, maintaining the National Crisis Management Centre in a state of readiness, national training and exercises, coordination and management of central government's response and recovery activities and administration of related expenses.
3,938 3,938 3,705
Policy Advice - Emergency Management
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to civil defence emergency matters.
357 357 443

Government House Buildings and Assets MCA (M52)

The overarching purpose of this appropriation is maintaining the Government House buildings and related assets in Wellington and Auckland to the standards necessary to fulfil their constitutional, ceremonial and community roles.
3,785 3,185 3,782
Non-Departmental Other Expenses
     
Depreciation of Crown Assets
This category is limited to depreciation expenses on the Government House buildings and related assets.
1,792 1,792 1,962
Government House - Maintenance
This category is limited to the ongoing maintenance of the Government House buildings and related assets, and the grounds on which they are located.
1,014 914 600
Loss on Disposal of Crown Assets
This category is limited to loss on disposal of Government House precinct buildings and related assets.
- - 170
Non-Departmental Capital Expenditure
     
Government House - Capital Investment
This category is limited to investment necessary to preserve the functionality and value of the Government House buildings and related assets.
979 479 1,050

Policy Advice and Support Services MCA (M52)

The overarching purpose of this appropriation is to provide policy advice to support decision-making by the Prime Minister and the Cabinet and provide support services to the Prime Minister, Cabinet and its committees, the Executive Council, and the Governor General.
27,973 27,273 24,726
Departmental Output Expenses
     
National Security Priorities and Intelligence Coordination
This category is limited to leadership and coordination around national security matters, leading collaboration within the New Zealand intelligence community and providing intelligence assessments to support national security priorities.
8,834 8,834 9,991
Policy Advice - Prime Minister and Cabinet
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by the Prime Minister and the Cabinet.
6,811 6,111 4,131
Science Advisory Committee
This category is limited to the purchase of high-quality scientific advice to the Prime Minister.
725 725 675
Support Services to the Governor-General and Maintenance of the Official Residences
This category is limited to financial, administrative, communications and advisory services for the Governor-General; and services to maintain the Governor-General's residences.
4,008 4,008 4,139
Support, Secretariat and Coordination Services
This category is limited to the provision of services to Ministers to enable them to discharge their portfolio (other than policy decision-making) responsibilities including support for the coordination of the Government's legislation programme; secretariat services to the Executive Council, Cabinet and its committees; and administration of the New Zealand Honours system.
7,595 7,595 5,790

Total Multi-Category Expenses and Capital Expenditure

44,172 42,712 40,168

Total Annual and Permanent Appropriations

68,670 65,710 73,442

Multi-Year Appropriations#

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Non-Departmental Output Expenses

   

Regenerate Christchurch (M85)

This appropriation is limited to establishment costs and the development of strategies and planning activities, with communities, stakeholders and decision-makers, for the regeneration of areas in Christchurch.

Commences: 01 July 2016

Expires: 30 June 2021
Original Appropriation 20,000
Adjustments to 2014/15 -
Adjustments for 2015/16 -
Adjusted Appropriation 20,000
Actual to 2014/15 Year End -
Estimated Actual for 2015/16 -
Estimated Actual for 2016/17 4,000
Estimated Appropriation Remaining 16,000

Total Annual and Permanent Appropriations and Multi-Year Appropriation Forecasts#

  2015/16 2016/17
  Final
Budgeted
$000
Estimated
Actual
$000
Budget
$000
Total Annual and Permanent Appropriations 68,670 65,710 73,442
Total MYA Non-Departmental Output Expenses Forecasts - - 4,000

Total Annual and Permanent Appropriations and Multi-Year Appropriation Forecasts

68,670 65,710 77,442

Capital Injection Authorisations#

  2015/16 2016/17
  Final Budgeted
$000
Estimated Actual
$000
Budget
$000
Department of the Prime Minister and Cabinet - Capital Injection (M52) 1,160 1,160 2,350

Supporting Information#

Part 1 - Vote as a Whole#

1.1 - New Policy Initiatives

Policy Initiative Appropriation 2015/16
Final Budgeted
$000
2016/17
Budget
$000
2017/18
Estimated
$000
2018/19
Estimated
$000
2019/20
Estimated
$000
Regenerate Christchurch
Transfer of funding
Regenerate Christchurch
Non-Departmental Output Expenses
2,000 - - - -
Regenerate Christchurch
Transfer of funding
Regenerate Christchurch Multi-Year Appropriation
Non-Departmental Output Expenses
- 4,000 4,000 4,000 4,000
Funding to establish and operate a New Zealand computer emergency response organisation Cyber Security Services
Departmental Output Expenses
- 5,128 4,977 4,934 4,934
Funding to establish and operate a New Zealand computer emergency response organisation Departmental Capital Injection - 2,187 - - -
Funding to increase capacity and capability to manage emergencies Emergency Management MCA
Emergency Sector Support and Development
Departmental Output Expenses
- 730 1,800 1,800 1,800
Funding to increase capacity and capability to manage emergencies Departmental Capital Injection - 63 - - -
Funding for the direction, coordination and provision of intelligence assessments to support national intelligence priorities Policy Advice and Support Services MCA
National Security Priorities and Intelligence Co-ordination
Departmental Output Expenses
- 1,200 1,700 2,500 3,300
Funding for the direction, coordination and provision of intelligence assessments to support national intelligence priorities Departmental Capital Injection - 100 200 300 -
Funding for operating costs
Christchurch Justice and Emergency Services Precinct
Emergency Management MCA
Emergency Sector Support and Development
Departmental Output Expenses
- 40 40 - -
Canterbury Earthquake Recovery
Transfer of function
Canterbury Earthquake Recovery
Departmental Output Expenses
8,922 21,241 12,056 10,810 10,662
Canterbury Earthquake Recovery
Transfer of net assets
Departmental Capital Injection 1,160 - - - -
Emergency Expenses Emergency Expenses
Non-Departmental Other Expenses
1,000 - - - -
Science Advisory Committee
Revised funding due to new Memorandum of Understanding
Policy Advice and Support Services MCA
Science Advisory Committee
Departmental Output Expenses
120 120 120 120 120
Better Public Services (BPS) Seed Funding for development of a Computer Emergency Response Team (CERT) business case Policy Advice and Support Services MCA
National Security Priorities and Intelligence Coordination
Departmental Output Expenses
350 - - - -
Share of costs for Budget 2015 whole-of-government initiatives Policy Advice and Support Services MCA
National Security Priorities and Intelligence Coordination
Departmental Output Expenses
(89) (79) (57) (43) (43)
Total Initiatives   13,463 34,730 24,836 24,421 24,773

Summary of Financial Activity#

  2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20
  Actual
$000
Actual
$000
Actual
$000
Actual
$000
Final Budgeted
$000
Estimated
Actual
$000
Departmental
Transactions
Budget
$000
Non-
Departmental
Transactions
Budget
$000
Total
Budget
$000
Estimated
$000
Estimated
$000
Estimated
$000

Appropriations

                       
Output Expenses - - - 3,333 17,188 15,688 25,869 4,000 29,869 21,033 19,744 23,596
Benefits or Related Expenses - - - - - - N/A - - - - -
Borrowing Expenses - - - - - - - - - - - -
Other Expenses 87,344 13,422 4,554 3,431 6,335 6,335 - 4,955 4,955 4,755 4,755 4,755
Capital Expenditure 1,165 781 362 4,443 975 975 2,450 - 2,450 300 400 100
Intelligence and Security Department Expenses and Capital Expenditure - - - - - - - N/A - - - -
Multi-Category Expenses and Capital Expenditure (MCA)                        
Output Expenses 29,296 31,135 24,733 34,389 40,387 39,527 36,386 - 36,386 38,128 38,902 39,702
Other Expenses - - - 612 2,806 2,706 - 2,732 2,732 2,562 2,562 2,562
Capital Expenditure - - - 54 979 479 N/A 1,050 1,050 800 800 550

Total Appropriations

117,805 45,338 29,649 46,262 68,670 65,710 64,705 12,737 77,442 67,578 67,163 71,265

Crown Revenue and Capital Receipts

                       
Tax Revenue - - - - - - N/A - - - - -
Non-Tax Revenue - - - - - - N/A 150 150 150 150 150
Capital Receipts - - - - - - N/A - - - - -

Total Crown Revenue and Capital Receipts

- - - - - - N/A 150 150 150 150 150

Note - where restructuring of the vote has occurred then, to the extent practicable, prior years information has been restated as if the restructuring had occurred before the beginning of the period covered. In this instance Total Appropriations for the Budgeted and Estimated Actual year may not equal Total Appropriations in the Details of Appropriations and Capital Injections.

Adjustments to the Summary of Financial Activity Table Due to Vote Restructuring#

It was not practicable to restate information in the Summary of Financial Activity table to reflect restructuring of appropriations undertaken because the allocation of the Canterbury Earthquake appropriations is spread across a number of government agencies, and it is not possible to ascertain the portion of historical data that would apply to each agency.

Total Vote - All Appropriations

The movements in departmental and non-departmental appropriations in Vote Prime Minister and Cabinet, which are detailed in the Summary of Financial Activity table above, are largely driven by movements in output expenses and non-departmental capital expenditure.

Details of significant movements within each appropriation category are detailed below.

Output Expenses

The increase in 2012/13 was largely due to additional funding for a project to provide an electronic platform to support Cabinet processes (CabNet), for establishing a new visitor centre at Government House Wellington, for implementing the National Cyber Policy Office, and for increasing capability in the corporate support functions.

The decrease in 2013/14 was mainly due to changes in the restatement of the Vote to reflect the transfer from Vote Internal Affairs in the 2011/12 and 2012/13 years for the transition of emergency functions. This decrease was off-set by increases due to expense transfers from 2012/13 for the Central Agencies Shared Services development programme, a one-off provision of funding to redevelop the future options for CabNet, and a one-off fiscally neutral transfer from Canterbury Earthquake Recovery Authority (CERA) to accelerate the resolution of insurance claims and repair of houses.

The increase in 2014/15 is mainly due to a full year of costs to administer emergency management functions transferred from Vote Internal Affairs, plus the expected costs of the Flag Consideration Project, offset by a reduction due to the baseline returning to status quo after one-off increases due to expense transfers in 2013/14.

The increase in 2015/16 is mainly due to the expected costs of the CabNet project implementation and the Flag Consideration Project, and expected costs relating to supporting the regeneration of greater Christchurch.

The increase in 2016/17 is mainly due to the transfer of a full year of funding from the Canterbury Earthquake Recovery Authority from 1 March 2016 to support ongoing Canterbury earthquake recovery work, funding to establish a New Zealand computer emergency response organisation, and funding to support increased capability and capacity in Emergency Management.

Other Expenses

The decreases in 2012/13 were mainly due to the restatement of the Vote to reflect the transfer from Vote Internal Affairs in the 2011/12 and 2012/13 years, offset by payments made as a result of the September 2010 and February 2011 Canterbury Earthquakes for civil defence and emergency management. In 2012/13 payments were also made to Environment Bay of Plenty for hazard mitigation work following civil defence emergency events in 2004 and 2005, and to the West Coast Regional Council as a result of the December 2010 flood event.

The decrease in 2013/14 is mainly due to a transfer of depreciation funding to 2014/15 arising from a revision of the useful life of the Government House main building.

The decrease in 2014/15 is mainly due to the transfer of depreciation funding to the new multi-category appropriation, as well as a reduction in actual costs for emergency expenses.

The increase for 2015/16 is mainly due to a transfer of funding from 2014/15 to the new Government House Building and Assets Multi-Category appropriation to now be used on capital and maintenance expenditure, expected increases in the costs of Emergency Management due to the flooding events of June 2015, and funding received for the transition of functions related to the Canterbury earthquake recovery.

The decrease for 2016/17 is mainly due to the return to baseline funding for Emergency Expenses, as well as the baseline returning to status quo after one-off increases due to expense transfers from 2014/15 for Emergency Management Preparedness Grants.

Capital Expenditure

The decrease in 2012/13 is mainly due to a return to baseline levels of expenditure after the increases in the previous year.

The decrease in 2013/14 is mainly due to reduced capital spend on Government House capital projects reflecting the uncertainty of ongoing baseline funding.

The increase in 2014/15 is mainly due to funding received for the CabNet project to provide an electronic platform to support Cabinet processes.

The decrease in 2015/16 is mainly due to the completion of the CabNet project, offset by transfers of assets from Canterbury Earthquake Recovery Authority.

The increase in 2016/17 is mainly due to transfers from 2015/16 for expected delays in securing vendor contracts for ongoing capital maintenance for Government House, expected expenditure to support increased capability and capacity in Emergency Management, and expected expenditure to establish a New Zealand computer emergency response organisation.

Part 2 - Details of Departmental Appropriations#

2.1 - Departmental Output Expenses#

Canterbury Earthquake Recovery (M85)

Scope of Appropriation

This appropriation is limited to provision of services supporting the regeneration of greater Christchurch.

Expenses and Revenue

  2015/16 2016/17
  Final Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 8,922 8,922 20,741
Revenue from the Crown 8,922 8,922 20,741
Revenue from Others - - -

 

What is Intended to be Achieved with this Appropriation

This appropriation is intended to achieve support for the regeneration of greater Christchurch including the ongoing provision of corporate capability.

Comparators for Restructured Appropriation

 

  2015/16 2016/17
Vote, Type and Title of Appropriation Final Budgeted
$000
Estimated Actual
$000
Budget
$000
 Vote Canterbury Earthquake Recovery, Departmental Output Expense, Policy Advice 2,953 2,953 -
 Vote Canterbury Earthquake Recovery, Departmental Output Expense, Managing the Recovery (Part Only - Refer Note 1) 68,702 68,702 -
 Vote Prime Minister and Cabinet, Departmental Output Expense, Canterbury Earthquake Recovery 8,922 8,922 20,741
Total 80,577 80,577 20,741

 Note 1 - Expenditure against this appropriation also corresponds to other appropriations in Vote Health, Vote Building and Housing, Vote Business, Science and Innovation and Vote Lands.

 

How Performance will be Assessed and End of Year Reporting Requirements

  2015/16 2016/17
Assessment of Performance Final Budgeted
Standard
Estimated
Actual
Budget
Standard

Departmental Output Expenses

     

Horizontal Infrastructure

     

Monitor and report on progress, timeliness and budget to Minister(s) and the Treasury, at least

4 Monthly 4 Monthly 4 Monthly

The wider Horizontal Infrastructure programme completion, close-out and transition is finalised within the agreed timeframe

Completed on Time Completed on Time Completed on time

Policy and Legislation

     

The satisfaction of the Minister with the policy and legal advice service, as per the common satisfaction survey (see Note 1)

Minister's expectations are met or exceeded Minister's expectations are met or exceeded Minister's expectations are met or exceeded

Technical quality of policy and legal advice papers assessed by a survey with a robust methodology (see Note 2)

90% 90% 90%

Land and Land Use Planning

     

All Crown submissions are completed within the statutory timeframes

100% 100% 100%

Leadership/Brokering/Coordination

     

The satisfaction of the Minister with the policy advice service, as per the common satisfaction survey (at least)

- - 80%

Technical quality of policy advice and legal advice papers assessed by a robust methodology (see Note 2)

80% 80% 80%

The Learn, Prepare, Act Symposium and Report are completed by June 2017

Completed Completed Completed

Monitoring and Reporting

     

Report to the Minister(s) at least six monthly on recovery progress and the performance of the Regenerate Christchurch Board

Achieved Achieved Achieved

Provide advice to the Minister on Crown appointments to the Regenerate Christchurch Board, as required (see Note 3)

Achieved Achieved Achieved

The total cost per hour of producing outputs

$100 $100 $90-$120

Note 1 - Reporting on this measure will be covered in the Stakeholder Survey to the Minister supporting Greater Christchurch Regeneration.

Note 2 - The quality characteristics of policy advice to be surveyed with the Minister supporting Greater Christchurch Regeneration in 2016/17 are:

  • completeness/alignment (advice meets the Minister's needs)
  • timeliness (advice provided in time to meet Cabinet Office and ministerial requirements, or as otherwise agreed)
  • robustness (advice received is of high technical quality, considering clarity, accuracy, analytical rigour, fitness for purpose and relevance to the wider context), and
  • likelihood to recommend (level to which the Minister will tell other Ministers they have received good policy advice from policy advice units).

Note 3 - Reporting on this measure will be covered through Stakeholder Survey to the Minister supporting Greater Christchurch Regeneration. Achieved means that all the advice provided on appointments meet the Minister's expectations on completeness, quality and timeliness.

End of Year Performance Reporting

Performance information for this appropriation will be reported by the Department of the Prime Minister and Cabinet in the 2016/17 Annual Report.

Current and Past Policy Initiatives

Policy Initiative Year of
First
Impact
2015/16
Final Budgeted
$000
2016/17
Budget
$000
2017/18
Estimated
$000
2018/19
Estimated
$000
2019/20
Estimated
$000
Canterbury Earthquake Recovery 2015/16 8,922 21,241 12,056 10,810 10,662

Reasons for Change in Appropriation

This is a new appropriation established as part of the transition from Canterbury Earthquake Recovery Authority (CERA) to other central government agencies. The new appropriation reflects the increased functions and accountabilities transferred to the Department of the Prime Minister and Cabinet.

Cyber Security Services (M88)#

Scope of Appropriation#

This appropriation is limited to carrying out the functions and services of a national CERT (a New Zealand computer emergency response organisation).

Expenses and Revenue#

  2015/16 2016/17
  Final Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation - - 5,128
Revenue from the Crown - - 5,128
Revenue from Others - - -

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to achieve the establishment and operation of a New Zealand computer emergency response organisation to enhance New Zealand's cyber security and resilience and help prevent cybercrime.

How Performance will be Assessed and End of Year Reporting Requirements#

  2015/16 2016/17
Assessment of Performance Final Budgeted
Standard
Estimated
Actual
Budget
Standard

New Zealand businesses have increasing awareness of cyber security risks and available mitigations

New Measure   increase 5 percentage points per annum

New Zealand businesses demonstrate understanding of reporting cyber incidents to the CERT

New Measure   increase 5 percentage points per annum

Establish a baseline from which to evaluate the outcomes of the CERT based on the three objectives for the CERT as set out in the business case and associated performance measures

New Measure   Baseline established

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Department of the Prime Minister and Cabinet in the 2016/17 Annual Report.

Current and Past Policy Initiatives#

Policy Initiative Year of
First
Impact
2015/16
Final Budgeted
$000
2016/17
Budget
$000
2017/18
Estimated
$000
2018/19
Estimated
$000
2019/20
Estimated
$000
Funding to establish and operate a New Zealand computer emergency response organisation
 - operating expenditure
2016/17 - 5,128 4,977 4,934 4,934

Reasons for Change in Appropriation#

This is a new appropriation to fund the establishment and operation of a New Zealand computer emergency response organisation.

2.3 - Departmental Capital Expenditure and Capital Injections#

Department of the Prime Minister and Cabinet - Capital Expenditure PLA (M52)#

Scope of Appropriation

This appropriation is limited to the purchase or development of assets by and for the use of the Department of the Prime Minister and Cabinet, as authorised by section 24(1) of the Public Finance Act 1989.

Capital Expenditure

  2015/16 2016/17
  Final Budgeted
$000
Estimated Actual
$000
Budget
$000
Forests/Agricultural - - -
Land - - -
Property, Plant and Equipment 525 525 2,400
Intangibles 400 400 -
Other 50 50 50

Total Appropriation

975 975 2,450

What is Intended to be Achieved with this Appropriation

This appropriation is intended to achieve the renewal, upgrade or redesign of assets in support of the delivery of the department's services.

How Performance will be Assessed and End of Year Reporting Requirements

Expenditure is in accordance with the department's capital asset management plan.

End of Year Performance Reporting

Performance information for this appropriation will be reported by the Department of the Prime Minister and Cabinet in the 2016/17 Annual Report.

Reasons for Change in Appropriation

The increase in this appropriation is due to the increased funding for the establishment and operation of a New Zealand computer emergency response organisation, and increased funding to support increased capability and capacity in Emergency Management.

Capital Injections and Movements in Departmental Net Assets

Department of the Prime Minister and Cabinet

Details of Net Asset Schedule 2015/16
Estimated Actual
$000
2016/17
Projected
$000
Explanation of Projected Movements in 2016/17
Opening Balance 8,059 8,534  
Capital Injections 1,160 2,350 Capital injections for the establishment and operation of a computer emergency response organisation, to increase capacity and capability of Emergency Management, and for the direction, coordination and provision of intelligence assessments to support national intelligence priorities
Capital Withdrawals (685) (700) Transfer of accumulated depreciation reserves for information technology assets, as replacements are managed by Treasury Central Agency Shared Services (CASS)
Surplus to be Retained (Deficit Incurred) - -  
Other Movements - -  

Closing Balance

8,534 10,184  

Part 3 - Details of Non-Departmental Appropriations#

3.1 - Non-Departmental Output Expenses#

Regenerate Christchurch (M85)

Scope of Appropriation and Expenses

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Regenerate Christchurch (M85)

This appropriation is limited to establishment costs and the development of strategies and planning activities, with communities, stakeholders and decision-makers, for the regeneration of areas in Christchurch.

Commences: 01 July 2016

Expires: 30 June 2021
Original Appropriation 20,000
Adjustments to 2014/15 -
Adjustments for 2015/16 -
Adjusted Appropriation 20,000
Actual to 2014/15 Year End -
Estimated Actual for 2015/16 -
Estimated Actual for 2016/17 4,000
Estimated Appropriation Remaining 16,000

What is Intended to be Achieved with this Appropriation

This appropriation is intended to achieve strategies and planning activities for the regeneration of areas in Christchurch.

How Performance will be Assessed and End of Year Reporting Requirements

  2015/16 2016/17
Assessment of Performance Final Budgeted
Standard
Estimated
Actual
Budget
Standard

Regenerate Christchurch will operate and deliver its work programme in accordance with the Responsible Minister's and Christchurch City Mayor's Letter of Expectations.

New Measure - Achieved

End of Year Performance Reporting

Performance information for this appropriation will be reported by the Minister supporting Greater Christchurch Regeneration in a report appended to the Department of the Prime Minister and Cabinet's 2016/17 Annual Report.

Reasons for Change in Appropriation

This is a new multi-year appropriation to support the strategies and planning activities for the regeneration of areas in Christchurch.

3.4 - Non-Departmental Other Expenses#

Emergency Expenses (M11)#

Scope of Appropriation

This appropriation is limited to payments to local authorities as provided for under the National CDEM Plan.

Expenses

  2015/16 2016/17
  Final Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 3,000 3,000 2,000

What is Intended to be Achieved with this Appropriation

This appropriation is intended to achieve provision of financial assistance to local authorities facing emergency management related expenses, through reimbursing them, where eligible, for costs incurred in caring for displaced people; while other eligible response and recovery will be partially reimbursed under the criteria provided for in the National CDEM Plan.

How Performance will be Assessed and End of Year Reporting Requirements

An exemption was granted under section 15D(2)(b)(iii) of the Public Finance Act 1989 on the basis that the amount (or annual average equivalent) of the appropriation is less than $5 million for expenses.

Reasons for Change in Appropriation

The decrease in this appropriation for 2016/17 is due to a return to baseline levels after a funding increase in 2015/16 of $1 million to cover the reimbursements of response and recovery costs to local authorities after flooding events in June 2015.

Emergency Management Preparedness Grants (M11)#

Scope of Appropriation#

This appropriation is limited to projects endorsed by CDEM Groups and managed or supported by the Ministry of Civil Defence & Emergency Management.

Expenses#

  2015/16 2016/17
  Final Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 1,189 1,189 889

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to achieve enhanced preparedness and response capabilities in the local community through provision of contestable funding for relevant projects managed by local authorities. Where practicable, the local authority is encouraged to contribute to the cost of the project.

How Performance will be Assessed and End of Year Reporting Requirements#

An exemption was granted under section 15D(2)(b)(iii) of the Public Finance Act 1989 on the basis that the amount (or annual average equivalent) of the appropriation is less than $5 million for expenses.

Reasons for Change in Appropriation#

The decrease in this appropriation for 2016/17 is due to the return to base level funding after a one-off transfer into 2015/16 from 2014/15 to reflect delays from local authorities in completing complex projects claims.

Ex Gratia Payment to the University of Auckland (M52)#

Scope of Appropriation#

This appropriation is limited to ex gratia payments to the University of Auckland to enable continued support of Professor Sir Peter Gluckman's own specialised research programme during his membership of the Science Advisory Committee.

Expenses#

  2015/16 2016/17
  Final Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 120 120 120

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to achieve the provision of high-quality scientific advice to the Prime Minister.

How Performance will be Assessed and End of Year Reporting Requirements#

An exemption was granted under section 15D(2)(b)(iii) of the Public Finance Act 1989 on the basis that the amount (or annual average equivalent) of the appropriation is less than $5 million for expenses.

Fees for the Commissioner of Security Warrants PLA (M52)#

Scope of Appropriation#

The appropriation under permanent legislative authority (the NZSIS Amendment (No. 2) Act 1999) will provide for payments to the Commissioner as an independent judicial officer for the authorisation of domestic security warrants.

Expenses#

  2015/16 2016/17
  Final Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 74 74 74

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to achieve remuneration of the Commissioner of Security Warrants.

How Performance will be Assessed and End of Year Reporting Requirements#

An exemption was granted under section 15D(2)(b)(ii) of the Public Finance Act 1989 on the basis that end-of-year performance information for the appropriation or category is not likely to be informative, because this appropriation is solely for payments to the Commissioner of Security Warrants for authorisation of domestic security warrants.

Governor-General's Programme PLA (M52)#

Scope of Appropriation#

This appropriation is limited to expenses incurred on the Governor-General's Programme, as authorised by section 13 of the Governor-General Act 2010.

Expenses#

  2015/16 2016/17
  Final Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 1,119 1,119 989

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to achieve strengthening of the office of the Governor-General as a symbol of national unity and leadership and enhancement of New Zealand's sense of nationhood.

How Performance will be Assessed and End of Year Reporting Requirements#

An exemption was granted under section 15D(2)(b)(iii) of the Public Finance Act 1989 on the basis that the amount (or annual average equivalent) of the appropriation is less than $5 million for expenses.

Reasons for Change in Appropriation#

The decrease in this appropriation for 2016/17 is due to the variable expenditure pattern associated with the Governor-General's official programme.

Governor-General's Salary and Allowance PLA (M52)#

Scope of Appropriation#

This appropriation is limited to expenses incurred on the salary, allowance and other payments to the Governor-General, as authorised by section 12 of the Governor-General Act 2010.

Expenses#

  2015/16 2016/17
  Final Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 476 476 576

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to achieve remuneration of the Governor-General.

How Performance will be Assessed and End of Year Reporting Requirements#

An exemption was granted under section 15D(2)(b)(ii) of the Public Finance Act 1989 on the basis that end-of-year performance information for the appropriation or category is not likely to be informative, because this appropriation is solely for salary and allowance payments to the Governor-General.

Reasons for Change in Appropriation#

This increase in this appropriation for 2016/17 is due to the expected increase in salary costs associated with the transition to the incoming Governor-General.

Governor-General's Travel Outside New Zealand PLA (M52)#

Scope of Appropriation#

This appropriation is limited to expenses incurred on the Governor-General's travel outside New Zealand, as authorised by section 14 of the Governor-General Act 2010.

Expenses#

  2015/16 2016/17
  Final Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 357 357 307

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to achieve the enablement of the Governor-General, in the head of state role, to represent New Zealand overseas, in support of the government's foreign policy objectives, to enhance relations between New Zealand and other countries, and to attend events that are important to New Zealand and New Zealanders.

How Performance will be Assessed and End of Year Reporting Requirements#

An exemption was granted under section 15D(2)(b)(iii) of the Public Finance Act 1989 on the basis that the amount (or annual average equivalent) of the appropriation is less than $5 million for expenses.

Reasons for Change in Appropriation#

The decrease in this appropriation for 2016/17 is due to expected lower levels of expenditure in the approved international travel plan.

Part 4 - Details of Multi-Category Expenses and Capital Expenditure#

Multi-Category Expenses and Capital Expenditure#

Emergency Management (M11)

Overarching Purpose Statement

The overarching purpose of this MCA is to support communities to be resilient by enhancing their capacity and capability to manage civil defence emergencies.

Scope of Appropriation

Departmental Output Expenses
Community Awareness and Readiness
This category is limited to the development and delivery of long-term national programmes to raise individual and community awareness and preparedness.
Emergency Sector and Support and Development
This category is limited to developing and implementing operational policies and projects, advice, assistance and information to the civil defence and emergency management sector.
Management of Emergencies
This category is limited to management of national emergency readiness, response and recovery, including support to local civil defence emergency management organisations, maintaining the National Crisis Management Centre in a state of readiness, national training and exercises, coordination and management of central government's response and recovery activities and administration of related expenses.
Policy Advice - Emergency Management
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to civil defence emergency matters.

Expenses, Revenue and Capital Expenditure

  2015/16 2016/17
  Final Budgeted
$000
Estimated Actual
$000
Budget
$000

Total Appropriation

12,414 12,254 11,660

Departmental Output Expenses

     
Community Awareness and Readiness 2,131 2,131 1,938
Emergency Sector and Support and Development 5,988 5,828 5,574
Management of Emergencies 3,938 3,938 3,705
Policy Advice - Emergency Management 357 357 443

Funding for Departmental Output Expenses

     

Revenue from the Crown

11,748 11,588 11,430
Community Awareness and Readiness 2,108 2,108 1,915
Emergency Sector and Support and Development 5,453 5,293 5,453
Management of Emergencies 3,830 3,830 3,619
Policy Advice - Emergency Management 357 357 443

Revenue from Others

666 666 230
Community Awareness and Readiness 23 23 23
Emergency Sector and Support and Development 535 535 121
Management of Emergencies 108 108 86

What is Intended to be Achieved with this Appropriation

This appropriation is intended to achieve the enablement and facilitation of leadership in promoting resilience to hazard risks and development of capability and capacity in civil defence emergency management.

How Performance will be Assessed for this Appropriation

  2015/16 2016/17
Assessment of Performance Final Budgeted
Standard
Estimated
Actual
Budget
Standard

New Zealand communities are aware of their hazards and risks, are prepared, and are able to respond and recover from an emergency.

85% 85% To be discontinued

What is Intended to be Achieved with each Category and How Performance will be Assessed

  2015/16 2016/17
Assessment of Performance Final Budgeted
Standard
Estimated
Actual
Budget
Standard

Departmental Output Expenses

     

Community Awareness and Readiness

     

This category is intended to ensure that programmes are in place to enable the community to prepare and react to emergency events

     

Availability of the civil defence website 24 hours a day, 7 days a week, at least:

99.9% 99.9% 99.9%

Each year increase the percentage of New Zealanders who describe themselves as "fully prepared", which means: have an emergency survival plan that includes what to do when not at home, have emergency items and water, and regularly update emergency survival items.

15.5% 15.5% Discontinued in 2016/17

The proportion of New Zealanders who describe themselves as "fully prepared", which means: have an emergency survival plan that includes what to do when not at home, have emergency items and water, and regularly update emergency survival items, will increase on the previous year by between:

New measure New measure 1 to 2%

Each year increase the percentage of New Zealanders who describe themselves as "prepared at home", which means: have an emergency survival plan that includes what to do when at home, have emergency items and water, and regularly update emergency survival items.

30.5% 30.5% Discontinued in 2016/17

The proportion of New Zealanders who describe themselves as "prepared at home", which means: have an emergency survival plan that includes what to do when at home, have emergency items and water, and regularly update emergency survival items, will increase on the previous year by between:

New measure New measure 1 to 2%

Emergency Sector and Support and Development

     

This category is intended to develop and implement operational policies and projects, advice, assistance and information to the civil defence and emergency management sector.

     

Director Guidelines, Technical Standards, Codes and other civil defence and emergency management sector information publications maintained.

4 5 Discontinued in 2016/17

The number of Director Guidelines, Technical Standards, Codes and other civil defence emergency management information publications that are either reviewed or published will be, at least:

New measure New measure 2 per year

Satisfaction assessed as 'Good' or 'Very Good', in relation to: (see Note 1)

     
  • Civil Defence and Emergency Management Group - coverage of the Guidelines, Technical Standards, Codes and other publications.
80% 80% Discontinued in 2016/17
  • Coverage of the new Guidelines, Technical Standards, Codes and other publications.
New measure New measure 80%
  • Quality of the new Guidelines, Technical Standards, Codes and other publications.
80% 80% 80%
  • The quality of the newsletters / updates - 16-20 issues.
80% 80% 80%

Facilitate civil defence emergency management courses or workshops annually, at least:

3 5 3

The number of CDEM initiatives developed or implemented in partnership with public sector, private sector and/or the not-for-profit sector, will be, between:

New measure New measure 5 - 6

Management of Emergencies

     

This category is intended to enable management of national emergency readiness, response and recovery operations.

     

National Warning System tests conducted, at least:

4 4 4

National warning issued within 30 minutes after the notification of a pending event that exceeds the thresholds.

100% 100% Discontinued in 2016/17

National warning issued within 15 minutes after a decision

New measure New measure 100%

National warning distribution list - accuracy of contact details (at each warning or test), at least:

95% 95% 95%

Stakeholder satisfaction with the timing and content of national warning messages.

Assessed Satisfied or better (at least 85%) 85% Discontinued in 2015/16

National Crisis Management Centre managed, during activations, with:

     
  • Staffing in place according to the activation mode within two hours.
100% 100% 100%
  • Essential information technology systems available and operating at agreed performance levels.
95% All 95%
  • Back-up information technology stems and equipment fully functional, at least.
99.8% 99.8% 99.8%
  • Co-ordination and management consistent with the Response Concept of Operations for extended activations.
100% 100% 100%

National Crisis Management Centre activations reviewed:

     
  • Mode 2 or higher activations - within three months.
100% 100% 100%
  • Approved recommendations (lessons identified) actioned - within set timeframes.
100% 100% 100%

Policy Advice - Emergency Management

     

This category is intended to ensure that decisions by Ministers on matters relating to civil defence emergency management are supported with world-class advice, assessments and processes.

     

Technical quality of policy advice papers and legal advice assessed by a robust methodology.

95% 95% 95%

Minister's satisfaction with the quality of policy advice (quarterly) (see Note 2), assessed as "satisfied" or better.

100% 100% 95%

Total cost per hour of producing outputs.

$90-$120 $135 $90-$120

Note 1 - Satisfaction performance measure involves a five point scale, either numerical 1-5 (with '5' the highest rating) or qualitative: Very Good, Good, Satisfied, Poor and Very Poor.

Note 2 - Satisfaction performance measure involves a 10 point scale (with '10' the highest rating).

End of Year Performance Reporting

Performance information for this appropriation will be reported by the Department of the Prime Minister and Cabinet in the 2016/17 Annual Report.

Current and Past Policy Initiatives

Policy Initiative Year of
First
Impact
2015/16
Final Budgeted
$000
2016/17
Budget
$000
2017/18
Estimated
$000
2018/19
Estimated
$000
2019/20
Estimated
$000
Funding to address diseconomies of scale resulting from transfer of emergency management functions from Vote Internal Affairs. 2013/14 570 570 570 570 570
Funding to increase capacity and capability to manage emergencies. 2016/17 - 730 1,800 1,800 1,800
Funding for operating costs for the Christchurch Justice and Emergency Services Precinct 2016/17 - 40 40 - -

Reasons for Change in Appropriation

In 2016/17 new funding will increase capacity and capability to manage emergencies, and new funding for operating costs for the Christchurch Justice and Emergency Services Precinct.

Funding for 2015/16 was higher due to:

  • $913,000 transfer from categories in Policy Advice and Support Services multi-category appropriation to reflect a recalibration of corporate costs across the Department
  • $436,000 for overseas aid for civil defence and emergency management funded by recoveries from the Ministry of Foreign Affairs and Trade, and recoverable communications activities, and
  • $175,000 expense transfers from 2014/15.

Government House Buildings and Assets (M52)#

Overarching Purpose Statement#

The overarching purpose of this appropriation is maintaining the Government House buildings and related assets in Wellington and Auckland to the standards necessary to fulfil their constitutional, ceremonial and community roles.

Scope of Appropriation#

Non-Departmental Other Expenses

Depreciation of Crown Assets
This category is limited to depreciation expenses on the Government House buildings and related assets.
Government House - Maintenance
This category is limited to the ongoing maintenance of the Government House buildings and related assets, and the grounds on which they are located.
Loss on Disposal of Crown Assets
This category is limited to loss on disposal of Government House precinct buildings and related assets.

Non-Departmental Capital Expenditure

Government House - Capital Investment
This category is limited to investment necessary to preserve the functionality and value of the Government House buildings and related assets.

Expenses, Revenue and Capital Expenditure#

  2015/16 2016/17
  Final Budgeted
$000
Estimated Actual
$000
Budget
$000

Total Appropriation

3,785 3,185 3,782

Non-Departmental Other Expenses

     
Depreciation of Crown Assets 1,792 1,792 1,962
Government House - Maintenance 1,014 914 600
Loss on Disposal of Crown Assets - - 170

Non-Departmental Capital Expenditure

     
Government House - Capital Investment 979 479 1,050

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to achieve an ongoing programme of planned capital and maintenance for Government Houses.

How Performance will be Assessed for this Appropriation#

  2015/16 2016/17
Assessment of Performance Final Budgeted
Standard
Estimated
Actual
Budget
Standard

The Governor-General's official residences are well maintained with maintenance, heritage and gardening plans adhered to.

Plans are adhered to Plans are adhered to Plans are adhered to

What is Intended to be Achieved with each Category and How Performance will be Assessed#

  2015/16 2016/17
Assessment of Performance Final Budgeted
Standard
Estimated
Actual
Budget
Standard

Non-Departmental Other Expenses

     

Depreciation of Crown Assets

     

This category is intended to achieve the funding of depreciation expenses for Government buildings and related assets.

     

An exemption was granted under section15D(2)(b)(ii) of the PFA, as additional performance information is unlikely to be informative because this appropriation is solely for depreciation expenses on Government Houses in Wellington and Auckland and their contents.

Exempt Exempt Exempt

Government House - Maintenance

     

This category is intended to achieve the maintenance of all Government House properties to the standard required.

     

An exemption was granted under section15D(2)(b)(iii) of the PFA, as the amount of the annual appropriation is less than $5 million for expenses.

Exempt Exempt Exempt

Loss on Disposal of Crown Assets

     

This category is intended to achieve the provision of funding for any loss on disposal of Government House property.

     

An exemption was granted under section15D(2)(b)(ii) of the PFA, as additional performance information is unlikely to be informative because this appropriation is solely for loss on disposal of Crown Assets.

Exempt Exempt Exempt

Non-Departmental Capital Expenditure

     

Government House - Capital Investment

     

This category is intended to achieve preservation of the functionality and value of Government House buildings and assets

     

An exemption was granted under section 15D(2)(b)((iii) of the PFA, as the amount of the appropriation is less than $15 million for capital expenditure

Exempt Exempt Exempt

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Department of the Prime Minister and Cabinet in a report appended to its 2016/17 Annual Report.

Current and Past Policy Initiatives#

Policy Initiative Year of
First
Impact
2015/16
Final Budgeted
$000
2016/17
Budget
$000
2017/18
Estimated
$000
2018/19
Estimated
$000
2019/20
Estimated
$000
Government House - Maintenance Non-Departmental Other Expenses 2016/17 - 600 600 600 600
Government House - Capital Investment Non-Departmental Capital expenses 2016/17 - 400 400 400 400

Policy Advice and Support Services (M52)#

Overarching Purpose Statement#

The overarching purpose of this appropriation is to provide policy advice to support decision-making by the Prime Minister and the Cabinet and provide support services to the Prime Minister, Cabinet and its committees, the Executive Council, and the Governor General.

Scope of Appropriation#

Departmental Output Expenses

National Security Priorities and Intelligence Coordination
This category is limited to leadership and coordination around national security matters, leading collaboration within the New Zealand intelligence community and providing intelligence assessments to support national security priorities.
Policy Advice - Prime Minister and Cabinet
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by the Prime Minister and the Cabinet.
Science Advisory Committee
This category is limited to the purchase of high-quality scientific advice to the Prime Minister.
Support Services to the Governor-General and Maintenance of the Official Residences
This category is limited to financial, administrative, communications and advisory services for the Governor-General; and services to maintain the Governor-General's residences.
Support, Secretariat and Coordination Services
This category is limited to the provision of services to Ministers to enable them to discharge their portfolio (other than policy decision-making) responsibilities including support for the coordination of the Government's legislation programme; secretariat services to the Executive Council, Cabinet and its committees; and administration of the New Zealand Honours system.

Expenses, Revenue and Capital Expenditure#

  2015/16 2016/17
  Final Budgeted
$000
Estimated Actual
$000
Budget
$000

Total Appropriation

27,973 27,273 24,726

Departmental Output Expenses

     
National Security Priorities and Intelligence Coordination 8,834 8,834 9,991
Policy Advice - Prime Minister and Cabinet 6,811 6,111 4,131
Science Advisory Committee 725 725 675
Support Services to the Governor-General and Maintenance of the Official Residences 4,008 4,008 4,139
Support, Secretariat and Coordination Services 7,595 7,595 5,790

Funding for Departmental Output Expenses

     

Revenue from the Crown

27,023 26,323 24,696
National Security Priorities and Intelligence Coordination 8,484 8,484 9,991
Policy Advice - Prime Minister and Cabinet 6,351 5,651 4,131
Science Advisory Committee 675 675 675
Support Services to the Governor-General and Maintenance of the Official Residences 3,978 3,978 4,109
Support, Secretariat and Coordination Services 7,535 7,535 5,790

Revenue from Others

950 950 30
National Security Priorities and Intelligence Coordination 350 350 -
Policy Advice - Prime Minister and Cabinet 460 460 -
Science Advisory Committee 50 50 -
Support Services to the Governor-General and Maintenance of the Official Residences 30 30 30
Support, Secretariat and Coordination Services 60 60 -

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to achieve the enablement and facilitation of decision making by executive government through the delivery of policy advice and support services to the Prime Minister, Cabinet and its committees, the Executive Council and the Governor-General.

How Performance will be Assessed for this Appropriation#

  2015/16 2016/17
Assessment of Performance Final Budgeted
Standard
Estimated
Actual
Budget
Standard

Increasing proportion of Better Public Services result areas on track to achieve their targets.

8 6 6

Overall service quality of Public Services improves over time.

Service quality score for Kiwis Count improved 0.74 0.745

What is Intended to be Achieved with each Category and How Performance will be Assessed#

  2015/16 2016/17
Assessment of Performance Final Budgeted
Standard
Estimated
Actual
Budget
Standard

Departmental Output Expenses

     

National Security Priorities and Intelligence Coordination

     

This category is intended to ensure that New Zealand has world-class processes in place to deal with national security events and emergencies, and an intelligence community that is trusted, integrated, customer-oriented and crucial to building national resilience (refer Note 1)

     

Advice and guidance on policies and preparation for strengthening national security is fully integrated, timely and of high quality.

Meets expectations Meets expectations Meets expectations

Assessments provided to inform Ministers and senior officials of risks and opportunities relating to New Zealand interests are accurate and succinct.

95% 98% 95%

Ministers and senior officials have confidence that assessments provided are of high quality and of policy relevance to New Zealand, assessed as the proportion of stakeholders whose expectations are met or exceeded.

90% 90% 90%

All-of-government responses to national crises and events are effectively coordinated and managed, assessed as the proportion of stakeholders whose expectations are met or exceeded (see Note 2).

90% 90% 90%

Policy Advice - Prime Minister and Cabinet

     

This category is intended to ensure that decisions by the Prime Minister and Cabinet are supported with world-class advice, assessments and processes.

     

The satisfaction of the Prime Minister and Cabinet with the policy advice service, as per the common satisfaction survey (see Note 3).

Exceeds expectations Exceeds expectations Exceeds expectations

The total cost per hour of producing outputs.

$105 $77 $90-$120

Science Advisory Committee

     

This category is intended to achieve the provision of high-quality scientific advice to the Prime Minister.

     

Advice produced is relevant to policymaking, is high quality, and meets the Prime Minister's expectations.

Prime Minister's expectations are met or exceeded Prime Minister's expectations are met Prime Minister's expectations are met or exceeded

Support Services to the Governor-General and Maintenance of the Official Residences

     

This category is intended to ensure the Governor-General is appropriately advised and supported in carrying out his or her constitutional, ceremonial, community and international roles. This is intended to be achieved through effective advisory, operational, financial, administrative and communications support being provided to the Governor-General. It is also intended to ensure that the official residences are appropriately maintained.

     

Support to the Governor-General is efficient and effective.

Governor-General's expectations met or exceeded Meets expectations and feedback is positive Governor-General's expectations met or exceeded

Events at the Government House are well organised.

Governor-General's expectations met or exceeded Meets expectations and feedback is positive Governor-General's expectations met or exceeded

The Governor-General's official residences are well maintained, with maintenance, heritage and gardening plans adhered to.

Plans are adhered to Plans are adhered to Plans are adhered to

Management of the Governor-General's domestic and international programme is appropriate and well-balanced.

Governor-General's expectations met or exceeded Meets expectations and feedback is positive Governor-General's expectations met or exceeded

Support, Secretariat and Coordination Services

     

This category is intended to achieve the provision of effective support to the Prime Minister and Ministers to enable them to discharge their portfolio responsibilities, and to support the coordination of the Government's legislation programme, provide secretarial services to the Executive Council, Cabinet, and its committees, and to administer the New Zealand Honours system.

     

Cabinet and Cabinet committee minutes requiring subsequent amendment (excluding amendments made as the result of Cabinet decisions).

0.5% 0.5% 0.5%

Papers for Cabinet and Cabinet committee meetings will be published on CabNet by the close of business, two business days before the meeting (subject to on-time lodgement in CabNet).

90% 90% 90%

Cabinet minutes will be published on CabNet within three business days of the Cabinet meeting.

95% 95% 95%

Formal feedback from the Governor-General and the Prime Minister on services provided.

Overall expectations are met or exceeded Meets expectations Overall expectations are met or exceeded

Note 1 - The National Security Priorities and Intelligence Coordination category encompasses three primary functions: gathering information, assessment of information and intelligence coordination.

Note 2 - Reporting on this measure will cover the satisfaction of stakeholders with the support DPMC provides to ODESC governance boards, as well as satisfaction with the national exercise programme and responses to national security events.

Note 3 - The quality characteristics of policy and scientific advice to be surveyed with the Prime Minister in 2016/17 are:

  • completeness/alignment (advice meets the Prime Minister's needs)
  • timeliness (advice provided in time to meet Cabinet Office and ministerial requirements, or as otherwise agreed)
  • robustness (advice received is of high technical quality, considering clarity, accuracy, analytical rigour, fitness for purpose and relevance to the wider context), and
  • likelihood to recommend (level to which the Prime Minister will tell other Ministers they have received good policy advice from policy advice units).

Note 4 - The higher the robustness score, the stronger the quality of the completed assessment.

Note - Alongside the other central agencies, the department plays a system-level coordination and leadership role within the State Sector and therefore has an important role in enhancing the wider State Sector's performance.

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Department of the Prime Minister and Cabinet in the 2016/17 Annual Report.

Reasons for Change in Appropriation#

The decrease in this appropriation for 2016/17 is due to completed projects for which there was a transfer from 2014/15 to 2015/16; including CabNet, information technology expenditure and secondment costs, which are recovered from other agencies; partially offset by an increase in funding for the direction, coordination and provision of intelligence assessments to support national intelligence priorities.

Current and Past Policy Initiatives#

Policy Initiative Year of
First
Impact
2015/16
Final Budgeted
$000
2016/17
Budget
$000
2017/18
Estimated
$000
2018/19
Estimated
$000
2019/20
Estimated
$000
Funding for the direction, coordination and provision of intelligence assessments to support national intelligence priorities 2016/17 - 1,200 1,700 2,500 3,300
New Better Public Services (BPS) Seed Funding for development of a Computer Emergency Response Team (CERT) business case. 2015/16 350 - - - -
Revised funding to the Science Advisory Committee due to a new Memorandum of Understanding 2015/16 120 120 120 120 120
Share of costs for Budget 2015 whole-of-government initiatives 2015/16 (89) (79) (57) (43) (43)
Rephasing of baseline to address future cost pressures 2014/15 110 110 110 110 -
Additional funding to support CabNet 2014/15 1,312 1,312 1,462 1,462 1,462
Strengthening capability on security and risk management 2013/14 330 330 330 330 330
Address on-going fiscal cost pressures 2013/14 2,170 2,170 2,170 2,170 2,170
Reappointment of Chief Science Advisor 2013/14 457 457 457 457 457
Increase the capability of intelligence co-ordination and strategic communications 2013/14 600 600 600 600 600
To implement a secure, shared platform to improve the Cabinet support system (CabNet project) 2012/13 1,639 1,639 1,639 1,639 1,639
Establishment of the National Cyber Policy Office 2012/13 1,000 1,000 1,000 1,000 1,000
To establish a visitor centre at Government House, Wellington 2012/13 180 180 180 180 180
Government efficiency dividend 2012/13 (488) (488) (488) (488) (488)
Increase capability funding for Prime Minister and Cabinet's Intelligence Group 2011/12 390 390 390 390 390