Estimates of appropriations

Vote Environment - Environment - Estimates 2014/2015

APPROPRIATION MINISTER(S): Minister for Climate Change Issues (M12), Minister for the Environment (M29)

APPROPRIATION ADMINISTRATOR: Ministry for the Environment

RESPONSIBLE MINISTER FOR MINISTRY FOR THE ENVIRONMENT: Minister for the Environment

Summary of the Vote#

Overview#

The Minister for the Environment and Minister for Climate Change Issues are responsible for appropriations in Vote Environment for the 2014/15 financial year covering the following impact areas:

Improving the quality, flow and availability of fresh water

  • a total of nearly $14 million to provide advice and implement tools for water management
  • a total of nearly $10 million in funding and grants to third parties for water initiatives as part of the Fresh Start for Fresh Water programme

Improving the resource management framework

  • a total of nearly $18 million to provide advice and implement tools to improve resource management

Improving the relationship with Maori

  • a total of just over $1 million for the Ministry for the Environment to negotiate and implement fair, durable and fit for purpose deeds of settlement and environmental accords
  • a total of nearly $4 million in funding for Iwi to engage in the co-management arrangements

Achieving better solutions to environmental problems

  • a total of just over $3 million to manage environmental obligations and programmes
  • a total of nearly $9 million for grants to third parties for domestic environmental management and education programmes, and contributions to international institutions

Reducing harm from natural, chemical and biological hazards and from waste

  • a total of just over $5 million to provide advice and implement tools to mitigate environmental hazards and waste
  • a total of nearly $5 million for services provided by third parties for the investigation, management and remediation services relating to contaminated sites
  • a total of around $17 million for waste minimisation initiatives to fund projects that reduces waste, encourage waste minimisation and decrease waste disposal and find more effective and efficient ways to reduce, reuse, recycle or reprocess it
  • a total of nearly $14 million in payments to territorial local authorities for their proportion of the Waste Disposal Levy as prescribed in the Waste Minimisation Act 2008
  • a total of nearly $19 million in funding provided to the Environmental Protection Authority to undertake existing functions including $3.200 million of additional funding for compliance and enforcement activities in the Exclusive Economic Zone

Decrease New Zealand's net emissions of greenhouse gases

  • a total of just over $4 million for the development of a national carbon accounting system
  • a total of just over $7 million for policy advice in relation to the domestic and international climate change programmes and contributions to international programmes
  • a total of around $165 million for the allocation of New Zealand emission units to the New Zealand economy
  • a total of just over $15 million for administration, implementation and operation of the Emissions Trading Scheme including the impairment of debt

Enabling the organisation

  • a total of $621,000 for capital expenditure mainly for the development and purchase of new software
  • a total of just over $3 million for Ministerial Servicing.

Details of these appropriations are set out in Parts 2-4.

Estimates of Appropriations#

Details of Appropriations and Capital Injections#

Annual and Permanent Appropriations

  2013/14 2014/15
Titles and Scopes of Appropriations by Appropriation Type Budgeted
$000
Estimated
Actual
$000
Budget
$000

Departmental Output Expenses

     

Carbon Monitoring Programme (M12)

Development of a national carbon accounting system that will contribute to the meeting of New Zealand's greenhouse gas reporting obligations under the Kyoto Protocol and the UNFCCC.
- - 4,275

Ministerial Services (M29)

This appropriation is limited to the provision of services to Ministers to enable them to discharge their portfolio responsibilities (other than policy decision-making).
3,190 3,190 3,300

Waste Minimisation Administration (M29)

This appropriation is limited to the collection and administration of the waste levy and assessing and monitoring costs relating to projects considered or approved for funding from the waste levy.
2,220 2,220 1,714

Climate Change MCOA (M12)

6,559 6,559 -
Domestic Climate Change Programme Policy Advice
This output class is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to domestic climate change.
2,914 2,914 -
International Climate Change Programme Policy Advice
This output class is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to international climate change issues, negotiating positions for climate change agreements and development of carbon markets.
3,596 3,596 -
Synthetic Greenhouse Gas Levy
This output class is limited to the implementation and collection of the Synthetic Greenhouse Gas Levy.
49 49 -

Environmental Management Obligations and Programmes MCOA (M29)

3,686 3,686 -
Domestic Obligations and Programmes
This output class is limited to contributing to and monitoring of domestic environmental management programmes and educational programmes promoting awareness of environmental issues.
2,083 2,083 -
International Obligations and Institutions Policy Advice
This output class is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to advice on international environmental arrangements, agreements and partnerships; contributing to negotiations with international parties on environmental issues in line with international arrangements, agreements and partnerships.
1,603 1,603 -

Improving Resource Management MCOA (M29)

25,154 25,154 -
Developing and Implementing Treaty Settlements and Environmental Accords Policy Advice
This output class is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to environmental accords with Maori and Treaty settlements involving natural resources; contributing to negotiations with iwi and affected parties on environmental issues as part of developing deeds of settlement.
1,235 1,235 -
Marine Environment Policy Advice
This output class is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the marine environment.
1,603 1,603 -
Resource Management Implementation
This output class is limited to the implementation of tools, frameworks and institutions and provision of advice, support, information, and guidance to the public, practitioners and wider natural resource sector in relation to resource management policy and practices.
8,995 8,995 -
Resource Management Policy Advice
This output class is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the management of natural and physical resources in New Zealand.
4,275 4,275 -
Water Management Policy Advice
This output class is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the quality, flow and availability of freshwater.
9,046 9,046 -

Mitigating Environmental Hazards and Waste MCOA (M29)

3,901 3,901 -
Environmental Hazards and Waste Policy Advice
This output class is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the risks posed by environmental hazards and waste, including international agreements, conventions and obligations.
1,490 1,490 -
Waste Management and Minimisation
This output class is limited to operational advice, implementation of tools, frameworks and institutions, and support, information and guidance to stakeholders in relation to waste management and minimisation.
2,411 2,411 -

Total Departmental Output Expenses

44,710 44,710 9,289

Departmental Capital Expenditure

     

Ministry for the Environment - Capital Expenditure PLA (M29)

This appropriation is limited to the purchase or development of assets by and for the use of the Ministry for the Environment, as authorised by section 24(1) of the Public Finance Act 1989.
741 741 621

Total Departmental Capital Expenditure

741 741 621

Non-Departmental Output Expenses

     

Administration of New Zealand Units held on Trust (M12)

This appropriation is limited to the application for and holding on trust of New Zealand Units on behalf of the future owners of Crown Forest Licensed land.
177 177 177

Community Environment Fund (M29)

This appropriation is limited to strengthening partnerships, raising environmental awareness and encouraging participation in environmental initiatives in the community.
3,008 2,008 4,872

Contaminated Sites Remediation Fund (M29)

This appropriation is limited to the investigation, management and remediation of contaminated sites.
3,670 1,170 4,628

Contestable Waste Minimisation Fund (M29)

This appropriation is limited to grants for waste minimisation initiatives.
16,642 16,642 15,752

Emissions Trading Scheme (M12)

This appropriation is limited to the implementation and operation of the New Zealand Emissions Trading Scheme and maintenance of a register to enable the holding and transfer of climate change units.
6,392 6,392 6,392

Environmental Training Programmes (M29)

This appropriation is limited to supporting training programmes, including Te Aho Tu Roa, that promote environmental and social sustainability, encourage Maori participation, raise environmental and ecological awareness and encourage children and young people to participate in environmental initiatives in the community.
1,900 1,900 1,900

Fresh Start for Fresh Water: New Initiatives (M29)

This appropriation is limited to the clean-up of New Zealand's freshwater waterbodies arising from historical contamination.
7,341 7,341 1,700

Promotion of Sustainable Land Management (M29)

This appropriation is limited to the promotion and coordination of sustainable land management practice through a national network of coordinators.
800 800 800

Te Mana o Te Wai - restoring the life-giving capacity of fresh water (M29)

This appropriation is limited to restoration initiatives, with involvement from community stakeholders, for New Zealand's freshwater bodies.
- - 2,500

Environmental Protection Authority: Regulatory Functions MCOA (M29)

16,100 16,100 -
Compliance and Enforcement
This output class is limited to promotion of compliance and oversight of enforcement for the legislation, regulations, approvals and permits in relation to hazardous substances, ozone-depleting substances, hazardous waste and new organisms.
3,722 3,722 -
Decision Making
This output class is limited to enabling decision-making processes for approvals or permits relating to new organisms and hazardous substances, or to import, use and export ozone-depleting substances and hazardous waste of international concern.
7,723 7,723 -
Supporting Environmental Management
This output class is limited to supporting decision-making frameworks and providing advice on the implementation and effectiveness of policy, legislation and international developments in the management of hazardous substances, ozone-depleting substances, hazardous waste, new organisms and resource management processes at the national level.
4,655 4,655 -

Total Non-Departmental Output Expenses

56,030 52,530 38,721

Non-Departmental Other Expenses

     

Allocation of New Zealand Units (M12)

This appropriation is limited to the granting of New Zealand Units to sectors of the New Zealand Economy.
164,040 50,852 164,710

Climate Change Development Fund (M12)

This appropriation is limited to supporting international projects to assist developing countries address climate change issues.
300 300 300

Environmental Legal Assistance (M29)

This appropriation is limited to supporting groups that wish to advocate for environmental issues in resource management cases in the courts and appearances at Boards of Inquiry of projects of national significance.
1,125 800 800

Framework Convention on Climate Change (M12)

New Zealand's contribution to the United Nations Framework Convention on Climate Change.
127 127 127

Fresh Start for Fresh Water: Waikato River Clean-up Fund (M29)

This appropriation is limited to funding for the Waikato River Clean-up Fund for the restoration and protection of the health and wellbeing of the Waikato River for future generations.
5,065 5,065 5,291

Impairment of Debt Relating to Climate Change Activities (M12)

This appropriation is limited to the impairment and write down of Crown debt arising from Climate Change related activities.
- - 8,700

Impairment of Debt Relating to Environment Activities (M29)

This appropriation is limited to the impairment and write down of Crown debt arising from Environment related activities excluding Climate Change.
- - 1,500

International Subscriptions (M29)

This appropriation is limited to subscriptions to International Environmental Agreements.
117 117 117

Te Pou Tupua (M29)

This appropriation is limited to the Crown contribution to support Te Pou Tupua (the Whanganui River Guardian) functions.
2,490 2,490 96

United Nations Environment Programme (M29)

New Zealand's membership of the United Nations Environment Programme.
393 393 393

Waikato River Co-Governance (M29)

This appropriation is limited to the governance and operational costs of Waikato River co-governance.
910 910 910

Waikato River Co-Management (M29)

This appropriation is limited to enabling the Waikato River Iwi to engage in the new co-management arrangements in relation to the Waikato River.
2,810 2,810 2,873

Waste Disposal Levy Disbursements to Territorial Local Authorities (M29)

This appropriation is limited to payments to Territorial Local Authorities of their proportion of the Waste Disposal Levy as prescribed under the Waste Minimisation Act 2008.
14,000 14,000 14,000

Hawke's Bay Rivers Clean-up Fund (M29)

This appropriation is limited to a grant to the Hawke's Bay Regional Council for the clean-up of the Mohaka, Waikari and Waihua Rivers consistent with the findings of the Hawke's Bay Regional Council - Ngati Pahauwera Research Study.
2,000 2,000 -

Impairment of Debt Relating to the New Zealand Emissions Trading Scheme (M12)

This appropriation is limited to the impairment and write-down of debt arising from the collection of revenue under the New Zealand Emissions Trading Scheme.
3,500 - -

Impairment of Debt Relating to the Synthetic Greenhouse Gas Levy (M12)

This appropriation is limited to the impairment and write down of Crown debts arising from the collection of the Synthetic Greenhouse Gas Levy.
200 - -

Impairment of Debt Relating to the Waste Disposal Levy collection (M29)

This appropriation is limited to the impairment and write-down of debt arising from the collection of levy under the Waste Minimisation Act 2009.
1,500 - -

Provision of a new water source for Rotorua (M29)

This appropriation is limited to a one-off grant to the Rotorua District Council to identify and provide an alternative drinking water source to that of Taniwha Springs.
1,075 - -

Te Awa Tupua Putea (M29)

This appropriation is limited to the Crown's contribution to the Te Awa Tupua Putea fund established as part of the Whanganui River Treaty Settlement.
30,000 30,000 -

Te Awa Tupua Whole of River Strategy (M29)

This appropriation is limited to the Crown contribution to the establishment, support and collaborative development of the Te Awa Tupua (Whanganui River) Whole of River Strategy.
430 430 -

Transitional Support for Local Government and Iwi (M29)

This appropriation is limited to providing transitional support to local authorities and iwi for new arrangements involving iwi in the management of natural resources arising from historical Treaty settlements.
825 825 -

Total Non-Departmental Other Expenses

230,907 111,119 199,817

Non-Departmental Capital Expenditure

     

Purchase of PRE Units (M12)

Purchasing of PRE emission units by the Crown from the Projects to Reduce Emissions (PRE) portfolio.
1,240 486 -

Total Non-Departmental Capital Expenditure

1,240 486 -

Multi-Category Expenses and Capital Expenditure

     

Climate Change MCA (M12)

The overarching purpose of this appropriation is to provide policy advice and other support to Ministers focusing on decreasing New Zealand's net emissions of greenhouse gases below business as usual levels in a cost-effective way.
- - 7,061
Departmental Output Expenses
     
Domestic Climate Change Programme Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to domestic climate change.
- - 3,462
International Climate Change Programme Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to international climate change issues, negotiating positions for climate change agreements and development of carbon markets.
- - 3,550
Synthetic Greenhouse Gas Levy
This category is limited to the implementation and collection of the Synthetic Greenhouse Gas Levy.
- - 49

Environmental Management Obligations and Programmes MCA (M29)

The overarching purpose of this appropriation is to provide policy advice and other support to Ministers focusing on achieving better solutions to environmental problems by supporting community involvement and action and international cooperation.
- - 3,335
Departmental Output Expenses
     
Domestic Obligations and Programmes
This category is limited to contributing to and monitoring of domestic environmental management programmes and educational programmes promoting awareness of environmental issues.
- - 1,705
International Obligations and Institutions Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to advice on international environmental arrangements, agreements and partnerships; contributing to negotiations with international parties on environmental issues in line with international arrangements, agreements and partnerships.
- - 1,630

Environmental Protection Authority: Regulatory Functions MCA (M29)

The overarching purpose of this appropriation is to provide advice and other support to Ministers focusing on the regulatory functions carried out by the Environmental Protection Authority.
- - 18,585
Non-Departmental Output Expenses
     
Compliance and Enforcement
This category is limited to the compliance and enforcement functions of the activities applicable to EPA's regulatory functions.
- - 8,404
Decision Making
This category is limited to the enabling and supporting decision-making processes for approvals of the activities applicable to EPA's regulatory functions.
- - 10,181

Improving Resource Management MCA (M29)

The overarching purpose of this appropriation is to provide policy advice and other support to Ministers focusing on improving resource management.
- - 32,840
Departmental Output Expenses
     
Developing and Implementing Treaty Settlements and Environmental Accords Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to environmental accords with Maori and Treaty settlements involving natural resources; contributing to negotiations with iwi and affected parties on environmental issues as part of developing deeds of settlement.
- - 1,224
Marine Environment Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the marine environment.
- - 1,316
Resource Management Implementation
This category is limited to the implementation of tools, frameworks and institutions and provision of advice, support, information, and guidance to the public, practitioners and wider natural resource sector in relation to resource management policy and practices.
- - 11,685
Resource Management Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the management of natural and physical resources in New Zealand.
- - 4,797
Water Management Implementation
This category is limited to activities associated with the implementation of water management policy and practises.
- - 3,000
Water Management Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the quality, flow and availability of freshwater.
- - 8,818
Non-Departmental Output Expenses
     
Water science and economics
This category is limited to water science and economic impact analyses, and guidance to support development of the National Objectives Framework.
- - 2,000

Mitigating Environmental Hazards and Waste MCA (M29)

The overarching purpose of this appropriation is to provide policy advice and other support to Ministers focusing on reducing harm from natural, chemical and biological hazards and from waste through more effective management frameworks.
- - 3,450
Departmental Output Expenses
     
Environmental Hazards and Waste Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the risks posed by environmental hazards and waste, including international agreements, conventions and obligations.
- - 1,365
Waste Management and Minimisation
This category is limited to operational advice, implementation of tools, frameworks and institutions, and support, information and guidance to stakeholders in relation to waste management and minimisation.
- - 2,085

Total Multi-Category Expenses and Capital Expenditure

- - 65,271

Total Annual and Permanent Appropriations

333,628 209,586 313,719

Multi-Year Appropriations

Type, Title, Scope and Period of Appropriations Appropriation, Adjustments and Use $000

Departmental Output Expenses

   

Land Use and Carbon Analysis System (M12)

This appropriation is limited to developing a national carbon accounting system that will contribute to meeting of New Zealand's greenhouse gas reporting obligations under the Kyoto Protocol and the UNFCCC.

Commences: 01 July 2012

Expires: 30 June 2014

Original Appropriation 15,843
Adjustments for 2012/13 1,078
Adjustments to 2013/14 -
Adjusted Appropriation 16,921
Actual to 2012/13 Year End 7,889
Estimated Actual for 2013/14 7,032
Estimated Actual for 2014/15 -
Estimated Appropriation Remaining 2,000

Non-Departmental Output Expenses

   

Protecting Lake Taupo Programme (M29)

This appropriation is limited to the reduction of nitrogen levels entering Lake Taupo.

Commences: 22 September 2010

Expires: 30 June 2015

Original Appropriation 10,668
Adjustments for 2012/13 -
Adjustments to 2013/14 -
Adjusted Appropriation 10,668
Actual to 2012/13 Year End 8,517
Estimated Actual for 2013/14 2,085
Estimated Actual for 2014/15 66
Estimated Appropriation Remaining -

Rena Long-term Environment Recovery (M29)

This appropriation is limited to funding for the implementation of the Rena Long-term Environmental Recovery Plan.

Commences: 07 March 2012

Expires: 30 June 2015

Original Appropriation 2,872
Adjustments for 2012/13 (995)
Adjustments to 2013/14 542
Adjusted Appropriation 2,419
Actual to 2012/13 Year End 1,877
Estimated Actual for 2013/14 542
Estimated Actual for 2014/15 -
Estimated Appropriation Remaining -

Tui Mine Remediation (M29)

This appropriation is limited to the remediation and clean up of Tui Mine.

Commences: 01 July 2011

Expires: 30 June 2014

Original Appropriation 15,200
Adjustments for 2012/13 -
Adjustments to 2013/14 (350)
Adjusted Appropriation 14,850
Actual to 2012/13 Year End 14,850
Estimated Actual for 2013/14 -
Estimated Actual for 2014/15 -
Estimated Appropriation Remaining -

Supporting Information#

Part 1 - Vote as a Whole#

1.1 - New Policy Initiatives

Policy Initiative Appropriation 2013/14
Budgeted
$000
2014/15
Budget
$000
2015/16
Estimated
$000
2016/17
Estimated
$000
2017/18
Estimated
$000
Exclusive Economic Zone functions with the EPA

Environmental Protection Authority: Regulatory Functions MCA

Non-Departmental Multi-category appropriation
- 3,200 - - -
Implementing the freshwater management reforms

Improving Resource Management MCA

Water Management Implementation
Departmental Multi-category appropriation
- 3,000 1,000 500 500
  Water science and economics
Non-Departmental Multi-category appropriation
  2,000 2,000 1,500 1,500
Implementing the resource management reforms

Improving Resource Management MCA

Resource Management Implementation
Departmental Multi-category appropriation
- 3,000 - - -
Improving environmental reporting

Improving Resource Management MCA

Resource Management Implementation
Departmental Multi-category appropriation
- 1,100 1,100 1,100 1,100
Te Mana o Te Wai - improve water quality

Te Mana o Te Wai - restoring the life-giving capacity of fresh water

Non-Departmental Output Expenses
- 2,500 2,500 - -
Whanganui River Settlement

Te Pou Tupua

Non-Departmental Other Expenses
- 200 200 200 200

Summary of Financial Activity#

  2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18
  Actual
$000
Actual
$000
Actual
$000
Actual
$000
Budgeted
$000
Estimated
Actual
$000
Departmental
Transactions
Budget
$000
Non-
Departmental
Transactions
Budget
$000
Total
Budget
$000
Estimated
$000
Estimated
$000
Estimated
$000

Appropriations

                       
Output Expenses 26,787 33,177 49,147 58,271 56,999 51,499 9,289 38,787 48,076 50,544 47,544 46,743
Benefits or Related Expenses - - - - - - N/A - - - - -
Borrowing Expenses - - - - - - - - - - - -
Other Expenses 338,375 887,612 370,160 85,332 230,907 111,119 - 199,817 199,817 208,602 213,122 216,880
Capital Expenditure 1,745 1,517 11,426 541 1,981 1,227 621 - 621 306 326 296
Intelligence and Security Department Expenses and Capital Expenditure - - - - - - - N/A - - - -
Multi-Category Expenses and Capital Expenditure (MCA)                        
Output Expenses
57,991 57,014 55,418 53,865 55,400 55,400 44,686 20,585 65,271 56,464 55,466 55,466
Other Expenses
- - - - - - - - - - - -
Capital Expenditure
- - - - - - N/A - - - - -

Total Appropriations

424,898 979,320 486,151 198,009 345,287 219,245 54,596 259,189 313,785 315,916 316,458 319,385

Crown Revenue and Capital Receipts

                       
Tax Revenue - - - - - - N/A - - - - -
Non-Tax Revenue 89,521 556,973 187,844 66,293 48,430 48,430 N/A 75,140 75,140 101,655 101,385 103,496
Capital Receipts - - - - - - N/A - - - - -

Total Crown Revenue and Capital Receipts

89,521 556,973 187,844 66,293 48,430 48,430 N/A 75,140 75,140 101,655 101,385 103,496

Note - where restructuring of the vote has occurred then, to the extent practicable, prior years information has been restated as if the restructuring had occurred before the beginning of the period covered.

Adjustments to the Summary of Financial Activity table due to Vote Restructuring#

  2009/10
Adjustments
$000
2010/11
Adjustments
$000
2011/12
Adjustments
$000
2012/13
Adjustments
$000
2013/14
Budgeted
Adjustments
$000
2013/14
Estimated
Actual
Adjustments
$000

Appropriations

           
Output Expenses (57,991) (57,014) (55,418) (53,865) (55,400) (55,400)
Benefits or Related Expenses - - - - - -
Borrowing Expenses - - - - - -
Other Expenses - - - - - -
Capital Expenditure - - - - - -
Intelligence and Security Department Expenses and Capital Expenditure - - - - - -
Multi-Category Expenses and Capital Expenditure (MCA)            
Output Expenses 57,991 57,014 55,418 53,865 55,400 55,400
Other Expenses - - - - - -
Capital Expenditure - - - - - -

Total Appropriations

-

-

-

-

-

-

Crown Revenue and Capital Receipts

           
Tax Revenue - - - - - -
Non-Tax Revenue - - - - - -
Capital Receipts - - - - - -

Total Crown Revenue and Capital Receipts

- - - - - -

The prior year information in the Summary of Financial Activity table has been restated to reflect the current Vote structure.

1.4 - Reconciliation of Changes in Appropriation Structure#

    Old Structure New Structure
2013/14 Appropriations
in the 2013/14 Structure
2013/14
(Current)
$000
Appropriations to which
Expenses (or Capital
Expenditure) have been Moved from or to
Amount
Moved
$000
2013/14 Appropriations
in the 2014/15 Structure
2013/14
(Restated)
$000
2014/15
$000
Departmental Output Expense            
Land Use and Carbon Analysis Sys - MYA - From: Land Use and Carbon Analysis Sys - MYA (Change in title only) - To: Carbon Monitoring Programme - 4,275
MCOA Climate Change 6,559 From MCOA Climate Change 6,559 To MCA Climate Change 6,559 7,061
MCOA Environmental Management Obligations and Programmes 3,686 From MCOA Environmental Management Obligations and Programmes 3,686 To MCA Environmental Management Obligations and Programmes 3,686 3,335
MCOA Improving Resource Management 25,154 From MCOA Improving Resource Management 25,154 To MCA Improving Resource Management 25,154 32,840
MCOA Mitigating Environmental Hazards and Waste 3,901 From MCOA Mitigating Environmental Hazards and Waste 3,901 To MCA Mitigating Environmental Hazards and Waste 3,901 3,450
Non-Departmental Output Expense            
MCOA Environmental Protection Authority: Regulatory Functions   From MCOA Environmental Protection Authority: Regulatory Functions   To MCA Environmental Protection Authority: Regulatory Functions    
Compliance and Enforcement 3,722 Compliance and Enforcement 3,722 Compliance and Enforcement 3,722 8,404
Decision Making 7,723 Decision Making 7,723 Decision Making 7,723 10,181
Supporting Environmental Management 4,655 Supporting Environmental Management 4,655 Supporting Environmental Management 4,655 -
Grand Total of Changes in All Appropriations 55,400   55,400   55,400 69,546

Explanations of the reasons for changing the appropriation structure are noted in the details of each appropriation in Parts 2-4.

1.5 - Relationship between Individual Appropriations and the Work Programmes#

Programme of work Appropriations
Impact:
Decrease New Zealand's net emissions of greenhouse gases below business as usual levels in a cost-effective way.
Administration of New Zealand Units held on Trust (M12)
Allocation of New Zealand Units (M12)
Climate Change (MCA) (M12)
  • Domestic Climate Change Programme Policy Advice output class
  • International Climate Change Programme Policy Advice output class
  • Synthetic Greenhouse Gas Levy output class
Carbon Monitoring Programme (M12)
Emissions Trading Scheme (M12)
Framework Convention on Climate Change (M12)
Impairment of Debt Relating to Climate Change Activities (M12)
Ministerial services (M29)
Impact:
Achieve better solutions to environmental problems by supporting community involvement and action, and international cooperation.
Climate Change Development Fund (M12)
Community Environment Fund (M29)
Environmental Legal Assistance (M29)
Environmental Management Obligations and Programmes (MCA) (M29)
  • Domestic Obligations and Programmes output class
  • International Obligations and Institutions Policy Advice output class
Environmental Training Programmes (M29)
International Subscriptions (M29)
Ministerial services (M29)
Promotion of Sustainable Land Management (M29)
United Nations Environment Programme (M29)
Impact:
Improve the quality, flow and availability of fresh water through more effective management frameworks.
Fresh Start for Fresh Water: New Initiatives (M29)
Fresh Start for Fresh Water: Rotorua Lakes Restoration Programme (M29)
Fresh Start for Fresh Water: Waikato River Clean-up Fund (M29)
Improving Resource Management (MCA) (M29)
  • Developing and Implementing Treaty Settlements and Environmental Accords Policy Advice output class
  • Resource Management Implementation output class
  • Resource Management Policy Advice output class
  • Water Management Implementation output class
  • Water Management Policy Advice output class
  • Water science and economics output class
Ministerial services (M29)
Community Environment Fund (M29)
Protecting Lake Taupo Programme (MYA) (M29)
Te Mana o Te Wai - restoring the life-giving capacity of fresh water (M29)
Impact:
Improve the resource management framework to manage environmental effects and allocate resources within environmental limits.
Improving Resource Management (MCA) (M29)
  • Marine Environment Policy Advice output class
  • Resource Management Implementation output class
  • Resource Management Policy Advice output class
Ministerial services (M29)
Impact:
Improve the relationship between the Ministry for the Environment and Maori by negotiating and implementing fair, durable and fit for purpose deeds of settlement and environmental accords.
Improving Resource Management (MCA) (M29)
  • Developing and Implementing Treaty Settlements and Environmental Accords Policy Advice output class
  • Resource Management Implementation output class
  • Resource Management Policy Advice output class
  • Water Management Implementation output class
  • Water Management Policy Advice output class
  • Water science and economics output class
Ministerial services (M29)
Te Mana o Te Wai - restoring the life-giving capacity of fresh water (M29)
Te Pou Tupua (M29)
Waikato River Co-Governance (M29)
Waikato River Co-Management (M29)
Impact:
Reduce harm from chemical and biological hazards, and from waste through more effective management frameworks.
Contaminated Sites Remediation Fund (M29)
Contestable Waste Minimisation Fund (M29)
Environmental Protection Authority: Regulatory Functions (MCA) (M29)
  • Decision Making
  • Compliance and Enforcement
Impairment of Debt Relating to Environment Activities (M29)
Mitigating Environmental Hazards and Waste (MCA) (M29)
  • Environmental Hazards and Waste Policy Advice output class
  • Waste Management and Minimisation Policy Advice output class
Ministerial services (M29)
Waste Disposal Levy Disbursements to Territorial Local Authorities (M29)
Waste Minimisation Administration (M29)
All Ministry Outcomes:
New Zealand becomes a successful low-carbon society that is resilient to climate change impacts on its climate, economy and lifestyle.
New Zealand's fresh water is well governed and sustainably managed to realise the maximum benefit possible for present and future environmental, cultural, social and economic values.
New Zealand's environmental management systems are strengthened and supported so that they can achieve the greatest overall environmental, economic, social and cultural benefits.
Ministry for the Environment - Capital Expenditure PLA (M29)

For further information on the intended impacts, outcomes and objectives of the departmental output expense appropriations please see the Statement of Intent for the Ministry for the Environment.

Part 2 - Details of Departmental Appropriations#

2.1 - Departmental Output Expenses#

Carbon Monitoring Programme (M12)

Scope of Appropriation

Development of a national carbon accounting system that will contribute to the meeting of New Zealand's greenhouse gas reporting obligations under the Kyoto Protocol and the UNFCCC.

Expenses and Revenue

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation - - 4,275
Revenue from the Crown - - 4,275
Revenue from Others - - -

Comparators for Restructured Appropriation

  2013/14 2014/15
Vote, Type and Title of Appropriation Budgeted
$000
Estimated Actual
$000
Budget
$000
Vote Environment      
Departmental Multi-year Appropriation      
Land Use and Carbon Analysis System MYA 9,032 7,032 -
Total 9,032 7,032 4,275

What is Intended to be Achieved with this Appropriation

This appropriation ensures New Zealand meets its reporting requirements under the United Nations Framework Convention on Climate Change and the Kyoto Protocol by tracking and quantifying changes in New Zealand land use. This information is also critical to informing our future international climate change negotiations and commitments.

How Performance will be Assessed and End of Year Reporting Requirements

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
The LUCAS Programme is completed successfully and transitioned to business as usual. New measure New measure Achieved
The LUCAS system is available for use by Ministry for the Environment and the Ministry for Primary Industries (as provided for in the Memorandum of Understanding). 99% during business hours 99% during business hours 99% during business hours
The land use and land-use change and forestry, and Kyoto Protocol portions of the National Inventory Report are completed to quality specifications and submitted on time. Achieved Achieved Achieved

End of Year Performance Reporting

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Reasons for Change in Appropriation

This appropriation has reverted back to an annual appropriation due to the completion of a Multi-year appropriation, Land Use and Carbon Analysis System MYA. The decrease in 2014/15 represents lower costs associated with data sets related to the first commitment period (CP1) than 2013/14.

Ministerial Services (M29)#

Scope of Appropriation#

This appropriation is limited to the provision of services to Ministers to enable them to discharge their portfolio responsibilities (other than policy decision-making).

Expenses and Revenue#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 3,190 3,190 3,300
Revenue from the Crown 3,187 3,187 3,300
Revenue from Others 3 3 -

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to provide support to Ministers, especially in relation to their accountability to Parliament and the public.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
Quality of Policy Advice (See Note 1)      
Percentage of all Regulatory Impact Statements that fully or partially meet quality assurance criteria. At least 90% 88% At least 90% (with 70% of RISs fully meeting quality assurance criteria)
The satisfaction of the Minister for the Environment and the Minister for Climate Change Issues with the policy advice service, as per the common satisfaction survey. At least 80% 67% At least 80%
The total cost per hour of producing outputs. At most $150 $203 At most $150
Technical quality of policy advice papers assessed by a survey with a methodical robustness of 100%. (See Note 2) At least 70% of policy advice papers sampled are of a high quality 51% At least 70% of policy advice papers sampled are of a high quality
Ministerial Services      
Percentage of responses to parliamentary questions that are completed within required timeframes. 100% 100% 100%
Percentage of responses to Ministerial correspondence submitted to the Minister within agreed timeframes. 95% 93% 95%
Percentage of responses to ministerial correspondence accepted first time by the Minister. 90% 96% 90%
Percentage of Ministerial Official Information Act requests submitted within the timeframes agreed with your office. 95% 83% 95%
Percentage of responses to departmental Official Information Act requests sent within statutory deadlines. 100% 98% 100%
Percentage of briefing notes accepted first time by the Minister. 90% 96% 90%

Note 1 - Policy performance targets apply to all four Ministry for the Environment Departmental Multi-category Appropriations (MCAs) and therefore it is more meaningful to aggregate these targets across these appropriations. The full set of measures, including targets for 2014/15 and relevant notes are published under this appropriation. The MCAs are - Climate Change MCA, Environmental Management Obligations and Programmes MCA, Improving Resource Management MCA, Mitigating Environmental Hazards and Waste MCA.

Note 2 - The methodical robustness of the Ministry's assessment process takes into account a number of factors such as:

  • the sample size of the assessment relative to the total population
  • the composition of the review panel and the average number of years of policy advice experience of that panel
  • how many of the five following policy attributes are reviewed - clarity, accuracy, analytical rigour, fitness for purpose and relevance to the wider context
  • the method of selecting policy outputs for assessment.

The Ministry expects that all its policy advice and analysis:

  • focuses on the needs of the audience and the decisions needed
  • provides appropriate context to explain the big picture
  • has a clear problem definition which indicates the size and scope of the problem, how current policy settings contribute and how changes can lead to better outcomes
  • displays a robust approach to analysis, based on evidence and logic
  • identifies the risks of the problem, risks of change options, delivery risks and mitigation strategies
  • displays evidence of appropriate consultation and collaboration across government and with affected parties
  • identifies and evaluates a range of practical options for meeting the policy objectives, and selects a preferred option
  • provides action-oriented recommendations with realistic commitments
  • is well-structured, presented in the correct format and is free of errors.

Refer to the Ministry's Statement of Intent for more information on the Ministry's approach to assessing its policy advice.

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Current and Past Policy Initiatives#

Policy Initiative Year of
First
Impact
2013/14
Budgeted
$000
2014/15
Budget
$000
2015/16
Estimated
$000
2016/17
Estimated
$000
2017/18
Estimated
$000
Provision of services to Ministers to enable them to discharge their portfolio responsibilities (other than policy decision-making). 2012/13 2,973 2,973 2,973 2,973 2,973

Reasons for Change in Appropriation#

The increase in this appropriation for 2014/15 is due to the fact that the Ministry anticipates an increase in ministerial products and correspondence relating to the Resource Management and Water Management reforms.

Waste Minimisation Administration (M29)#

Scope of Appropriation#

This appropriation is limited to the collection and administration of the waste levy and assessing and monitoring costs relating to projects considered or approved for funding from the waste levy.

Expenses and Revenue#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 2,220 2,220 1,714
Revenue from the Crown 2,218 2,218 1,714
Revenue from Others 2 2 -

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to achieve the effective and efficient administration of the functions required under the Waste Minimisation Act 2008. These functions are the collection of the Waste Disposal Levy from Disposal Facility Operators, the administration of the Waste Minimisation Fund, and the payment of Levy money to Territorial Authorities, on a per head of population basis, to assist them with minimising waste in their areas.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
Administration costs of the waste disposal levy (including levy collection, administration of Waste Minimisation Fund projects and payments to Territorial Authorities) are not more than 5% of the total levy collected. No more than 5% 5.21% no more than 5%
Administration of Waste Minimisation Fund      
The Waste Minimisation Fund eligibility and assessment criteria are aligned with the requirements of the Waste Minimisation Act 2008. Achieved Achieved Achieved
Percentage of completed Waste Minimisation Fund projects administered within acceptable timeframes (after funding agreement signed). (See Note 1 below) 80% 70% 80%
Percentage of Waste Minimisation Fund applicants whose projects are completed are satisfied (or better) with the timeliness and quality of advice received from the Ministry throughout the course of their project. 80% satisfied or better 90% satisfied or better 80% satisfied or better
Percentage of funding rounds for the Waste Minimisation Fund that proceed through Stage 1 in under 12 weeks per round (standard term: 60 working days). (See Note 2 below) 100% 50% 100%
Collection of the Waste Levy      
Percentage of instances when successful action is taken against disposal facility operators who have outstanding levy payments (over 120 days). 100% 100% 100%
Percentage of Disposal Facility Operators satisfied (or better) with the timeliness and quality of advice received from the Ministry throughout the course of the year. 70% satisfied or better 70% satisfied or better 70% satisfied or better
Payment to Territorial Authorities      
Percentage of Territorial Authorities satisfied (or better) with the timeliness and quality of advice received from the Ministry throughout the course of the year. 70% satisfied or better 70% satisfied or better 70% satisfied or better

Note 1 - Administration functions include project planning and deed negotiation, milestone assessment and payment, and responding to general enquiries. Upon completion of their project, applicants will be required to provide an assessment within their final report of whether these administration functions were carried out within timeframes they considered acceptable. The assessment will be based on a scale of one to five. A score of four or five will be taken as meaning that the timeframes were acceptable.

Note 2 - There was one contestable funding round in 2013/14. The round was progressed through Stage 1 in 86 working days. Work is currently underway to develop improved application and assessment processes which should reduce the Stage 1 timeframe for future funding rounds. A second round is expected to open before the end of 2013/14.

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Reasons for Change in Appropriation#

The decrease in this appropriation for 2014/15 is primarily due to the completion of the TV TakeBack scheme.

2.3 - Departmental Capital Expenditure and Capital Injections#

Ministry for the Environment - Capital Expenditure PLA (M29)#

Scope of Appropriation

This appropriation is limited to the purchase or development of assets by and for the use of the Ministry for the Environment, as authorised by section 24(1) of the Public Finance Act 1989.

Capital Expenditure

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Forests/Agricultural - - -
Land - - -
Property, Plant and Equipment 241 241 121
Intangibles 500 500 500
Other - - -

Total Appropriation

741 741 621

What is Intended to be Achieved with this Appropriation

This appropriation is intended to achieve the renewal, upgrade and/or redesign of assets in support of the delivery of the Ministry's service.

How Performance will be Assessed and End of Year Reporting Requirements

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
Expenditure is in accordance with the Ministry's capital asset management plan:      
Computer Hardware 101 101 36
Computer Software 500 500 500
Office Equipment 15 15 15
Furniture and Fixtures 125 125 70
Total 741 741 621

End of Year Performance Reporting

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Reasons for Change in Appropriation

The decrease in this appropriation for 2014/15 is primarily due to the Ministry moving to Infrastructure as a Service. The funding is allocated to the purchase and development of upgrades to the Ministry's core systems such as Online Waste Levy System, Customer Relationship Management System and Document Record Management System to improve efficiency and effectiveness.

Capital Injections and Movements in Departmental Net Assets

Ministry for the Environment#

Details of Net Asset Schedule 2013/14
Estimated Actual
$000
2014/15
Projected
$000
Explanation of Projected Movements in 2014/15
Opening Balance 5,992 5,992  
Capital Injections - -  
Capital Withdrawals - -  
Surplus to be Retained (Deficit Incurred) - -  
Other Movements - -  

Closing Balance

5,992 5,992  

Part 3 - Details of Non-Departmental Appropriations#

3.1 - Non-Departmental Output Expenses#

Administration of New Zealand Units held on Trust (M12)

Scope of Appropriation

This appropriation is limited to the application for and holding on trust of New Zealand Units on behalf of the future owners of Crown Forest Licensed land.

Expenses

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 177 177 177

What is Intended to be Achieved with this Appropriation

This appropriation is intended to fund the administration costs of the Forestry Emissions Unit Trust. This Trust was established to apply for and hold New Zealand Units on behalf of future owners of eligible pre-1990 Crown Forest Licence (CFL) land until ownership of CFL land is transferred to iwi under relevant Treaty of Waitangi settlement legislation.

How Performance will be Assessed and End of Year Reporting Requirements

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
The Forestry Emission Unit Trust distributes emission units to beneficiaries following Treaty of Waitangi settlements as required under its trust deed. Achieved Achieved Achieved

End of Year Performance Reporting

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Current and Past Policy Initiatives

Policy Initiative Year of
First
Impact
2013/14
Budgeted
$000
2014/15
Budget
$000
2015/16
Estimated
$000
2016/17
Estimated
$000
2017/18
Estimated
$000
The Trust to meet its obligations under its trust deed to apply and hold NZUs for the future owners of CFL land. 2010/11 177 177 177 177 177

Community Environment Fund (M29)#

Scope of Appropriation#

This appropriation is limited to strengthening partnerships, raising environmental awareness and encouraging participation in environmental initiatives in the community.

Expenses#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 3,008 2,008 4,872

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to empower New Zealanders to achieve positive environmental change. The Fund supports partnerships to increase community-based advice, educational opportunities, and public awareness on environmental issues.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
Percentage of completed Community Environment Fund projects that achieve stated objectives. 80% 80% 80%

Fund Criteria#

Fund Fund Criteria
Community Environment Fund Preference will be given to applicants who demonstrate that their project will support more than one of the following objectives:
  • raise awareness and involvement in resolving environmental issues
  • support and strengthen collaboration between environmental groups, business/farmers, industry, iwi and local authorities on finding community solutions to environmental challenges
  • involve the community in practically focused action to improve environmental quality
  • provide improved community-based advice, educational opportunities and public information about environmental legislation and policy
  • provide wider economic, social or cultural benefits.
Some rounds of the Community Environment Fund may be targeted at a specific environmental issue and therefore, the criteria are subject to change and approval by the Minister for the Environment. In addition, projects should be for a discreet timeframe of up to three years, after which the project objectives will have been achieved and, where appropriate, the initiative will have become self-funding.

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Service Providers#

Provider 2013/14
Budgeted
$000
2013/14
Estimated Actual
$000
2014/15
Budget
$000
Reporting to the
House
Expiry of
Resourcing
Commitment
Non-Government Organisations          
Organisations that receive funding for projects that strengthen partnerships, raise environmental awareness and encourage participation in environmental initiatives in the community. 3,008 2,008 4,872 See above Ongoing

Current and Past Policy Initiatives#

Policy Initiative Year of
First
Impact
2013/14
Budgeted
$000
2014/15
Budget
$000
2015/16
Estimated
$000
2016/17
Estimated
$000
2017/18
Estimated
$000
Reprioritisation of funding from Fresh Start for Fresh Water fund: New Initiatives. 2013/14 475 - - - -
Reprioritisation of funding for targeted water initiatives. 2013/14 1,100 1,100 - - -
Reprioritisation of funding for Upper Waipa River Clean-up Fund Commitments. 2013/14 (150) (150) (150) (150) (150)
Reprioritisation from the Sustainable Management Fund. 2010/11 2,444 2,444 2,444 2,444 2,444
Reprioritisation from Legal and Environment Centre Grants. 2010/11 578 578 578 578 578

Reasons for Change in Appropriation#

The increase in this appropriation for 2014/15 is due to an expense transfer from 2013/14 for projects that represents existing projects deliverables and a funding round focused on community participation in collaborative planning and implementation of the National Policy Statement for Freshwater Management to be undertaken in 2014/15.

Contaminated Sites Remediation Fund (M29)#

Scope of Appropriation#

This appropriation is limited to the investigation, management and remediation of contaminated sites.

Expenses#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 3,670 1,170 4,628

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to encourage and support regional councils and unitary authorities to investigate and remediate sites that pose a risk to human health and the environment.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
Percentage of contaminated sites projects that achieve stated project objectives. 75% 75% 75%
Total number of sites remediated and/or managed since Fund established. 19 20 22

Fund Criteria#

Fund Fund Criteria
Contaminated Sites Remediation Fund Applications should show that the contamination poses a health and/or an environmental risk, or is close to areas of cultural or national significance; they should show the capability and capacity of the project team and the practicality of the proposed solution; partnerships between parties are reflected; and cost-effectiveness is demonstrated.

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Service Providers#

Provider 2013/14
Budgeted
$000
2013/14
Estimated Actual
$000
2014/15
Budget
$000
Reporting to the
House
Expiry of
Resourcing
Commitment
Territorial Local Authorities          
Councils that receive funding to assist in the clean-up of contaminated land in New Zealand. 3,670 1,170 4,628 See above Ongoing

Current and Past Policy Initiatives#

Policy Initiative Year of
First
Impact
2013/14
Budgeted
$000
2014/15
Budget
$000
2015/16
Estimated
$000
2016/17
Estimated
$000
2017/18
Estimated
$000
Reprioritisation of funding for Upper Waipa River Clean-up Fund commitments. 2013/14 (150) (150) (150) (150) (150)
Reprioritisation from the Sustainable Management Fund. 2010/11 1,000 1,000 1,000 1,000 1,000

Reasons for Change in Appropriation#

The increase in this appropriation for 2014/15 is primarily due to delays in timing of deliverables and project milestones. Funding has been committed to a multi-year Kopeopeo Canal project. The project has been further delayed by appeals in the Environment Court.

Contestable Waste Minimisation Fund (M29)#

Scope of Appropriation#

This appropriation is limited to grants for waste minimisation initiatives.

Expenses#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 16,642 16,642 15,752

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to increase resource efficiency use, reuse, recovery and recycling, and decrease waste to landfill by funding projects that promote or achieve waste minimisation.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
Percentage of completed Waste Minimisation Fund projects that achieve stated objectives. New measure 50% 80%

Fund Criteria#

Fund Fund Criteria
Waste Minimisation Fund Preference will be given to projects that collectively give the largest net benefit over time. The assessment of the effectiveness of projects will include the extent to which the projects can demonstrate:
  • likelihood of success
  • reduction of harm to the environment
  • reduction in the value of waste disposed
  • economic, environmental, social or cultural benefits
  • longer term benefits after the completion of the project.
Potential projects will also be assessed for:
  • their strategic value in achieving the purpose of the fund. Strategic value means the likely ability of projects to act as catalysts that enhance and extend the uptake of waste minimisation.
  • the degree of partnership and cross-sectoral collaboration
  • the level of funding from other sources - shared funding is preferred.

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Service Providers#

Provider 2013/14
Budgeted
$000
2013/14
Estimated Actual
$000
2014/15
Budget
$000
Reporting to the
House
Expiry of
Resourcing
Commitment
Non-Government Organisations          
Organisations that receive funding for projects that increase resource efficiency, increase re-use, recovery and recycling, and decrease waste to landfill. 16,642 16,642 15,752 See above Ongoing

Reasons for Change in Appropriation#

The decrease in this appropriation for 2014/15 is primarily due to a change in forecast to match the amount of funding with the revised timing of deliverables.

The Contestable Waste Minimisation Fund is governed by the Waste Minimisation Act which limits how the waste levy can be spent. The timing of the introduction of the Waste Levy to the initial funding round of the fund meant that approximately one year's worth of levy has accumulated in the notional account. The Ministry is working through future funding rounds that could deliver high quality projects to reduce waste. The level of the notional account is expected to decrease over time.

Emissions Trading Scheme (M12)#

Scope of Appropriation#

This appropriation is limited to the implementation and operation of the New Zealand Emissions Trading Scheme and maintenance of a register to enable the holding and transfer of climate change units.

Expenses#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 6,392 6,392 6,392

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to achieve the efficient and effective administration of the New Zealand Emissions Trading Scheme and the operation of the New Zealand Emission Unit Register to ensure that the allocation and trading of emission units are recorded accurately and in a timely manner.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
Application summaries for allocations are processed within 4 weeks of receiving the signed application summary. 90% 90% 90%
Percentage of participants accurately recorded in the New Zealand Emissions Unit Register within two business days of receipt of a properly completed application. 98% 98% 98%

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Environmental Protection Authority in its Annual Report.

Current and Past Policy Initiatives#

Policy Initiative Year of
First
Impact
2013/14
Budgeted
$000
2014/15
Budget
$000
2015/16
Estimated
$000
2016/17
Estimated
$000
2017/18
Estimated
$000
Processing of applications received for allocations of units and implementing and operating New Zealand Emissions Unit Register. 2011/12 6,392 6,392 6,392 6,392 6,392

Environmental Training Programmes (M29)#

Scope of Appropriation#

This appropriation is limited to supporting training programmes, including Te Aho Tu Roa, that promote environmental and social sustainability, encourage Maori participation, raise environmental and ecological awareness and encourage children and young people to participate in environmental initiatives in the community.

Expenses#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 1,900 1,900 1,900

What is Intended to be Achieved with this Appropriation#

The appropriation is intended to provide funding to the Enviroschools Foundation to support the development and delivery of its Enviroschools and Te Ahu Tu Roa Programmes. These Programmes provide support and opportunities for children and young people to work with their centres, schools, kura (Maori immersion schools) and communities to create healthy and sustainable communities.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
The Enviroschools Foundation programme is delivered in accordance with its contractual obligations. Achieved Achieved Achieved

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Current and Past Policy Initiatives#

Policy Initiative Year of
First
Impact
2013/14
Budgeted
$000
2014/15
Budget
$000
2015/16
Estimated
$000
2016/17
Estimated
$000
2017/18
Estimated
$000
Increasing Conservation Education in Schools. 2012/13 1,900 1,900 1,900 1,900 1,900

Fresh Start for Fresh Water: New Initiatives (M29)#

Scope of Appropriation#

This appropriation is limited to the clean-up of New Zealand's freshwater waterbodies arising from historical contamination.

Expenses#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 7,341 7,341 1,700

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to help communities clean up waterways affected by historical water quality issues.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
Percentage of project deliverables completed in accordance with the approved annual work programme for Lake Ellesmere, Manawatu River, Wairarapa Moana, Wainono Lagoon, Waituna Lagoon, and Lake Brunner. 90% 90% 90%

Fund Criteria#

Fund Fund criteria
Fresh Start for Fresh Water Clean-up Fund Eligibility criteria for the Fresh Start for Fresh Water Clean-up Fund is as follows:
  • Funding is only available for the remediation of nationally significant freshwater bodies.
  • Regional council led: jointly-led proposals are encouraged. Applications must be submitted and led or co-led by a regional council (including unitary authorities).
  • Applicants must provide evidence that contamination is a legacy issue which results from decisions and/or activities that occurred before the passage of the Resource Management Act in 1991.
  • Regulatory drivers: applicants must provide evidence that appropriate regulatory plans and measures are in place, or will be implemented, to manage/minimise future contamination in a way that gives effect to the National Policy Statement for Freshwater Management.
  • Collaboration: applicants must provide evidence of partnership and/or a collaborative approach, including with iwi/Maori.
  • New activities: the project must result in new freshwater remediation activity, either by implementing new initiatives or expanding the scope of existing activities.
Funding: the Fund will not cover the entire cost of the project. Local contributions must at least match the Crown's contribution.

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Service Providers#

Provider 2013/14
Budgeted
$000
2013/14
Estimated Actual
$000
2014/15
Budget
$000
Reporting to the
House
Expiry of
Resourcing
Commitment
Territorial Local Authorities          
Organisations that receive funding for the clean-up of New Zealand's fresh water bodies. 7,341 7,341 1,700 See above 30 June 2015

Reasons for Change in Appropriation#

The decrease in this appropriation is due to an expense transfer of $1.700 million to 2014/15 from 2013/14.

Funding of $15 million was appropriated for the two financial years 2011/12 and 2012/13. The establishment period has taken longer than anticipated, particularly for the large projects such as Lake Te Waihora and the Manawatu River, resulting in timeframes for the projects being extended. The first of these projects are expected to be completed in 2013/14 and the last in 2015/16. The appropriation has now been rephased to match the actual and expected delivery of milestones.

Promotion of Sustainable Land Management (M29)#

Scope of Appropriation#

This appropriation is limited to the promotion and coordination of sustainable land management practice through a national network of coordinators.

Expenses#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 800 800 800

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to provide funding for Landcare Trust's core services, including the national network of Regional Coordinators and the Trust's work in assisting and encouraging sustainable land management (through activities that include: supporting landcare and community based groups; dissemination of information and knowledge sharing activities; and holding master classes in integrated catchment management).

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
Landcare Trust undertakes work on sustainable land management and training in line with its contractual obligations. Achieved Achieved Achieved

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Current and Past Policy Initiatives#

Policy Initiative Year of
First
Impact
2013/14
Budgeted
$000
2014/15
Budget
$000
2015/16
Estimated
$000
2016/17
Estimated
$000
2017/18
Estimated
$000
Reprioritisation from Sustainable Management Fund. 2010/11 400 400 400 400 400

Protecting Lake Taupo Programme (M29)#

Scope of Appropriation and Expenses#

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Protecting Lake Taupo Programme (M29)

This appropriation is limited to the reduction of nitrogen levels entering Lake Taupo.

Commences: 22 September 2010

Expires: 30 June 2015
Original Appropriation 10,668
Adjustments to 2012/13 -
Adjustments for 2013/14 -
Adjusted Appropriation 10,668
Actual to 2012/13 Year End 8,517
Estimated Actual for 2013/14 2,085
Estimated Actual for 2014/15 66
Estimated Appropriation Remaining -

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to help improve the quality of water within Lake Taupo. The Crown is working with the Waikato Regional Council and Taupo District Council to reduce the amount of manageable nitrogen entering the lake by 20 per cent by 2020.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
The Lake Taupo Protection Programme is undertaken in accordance with the Lake Taupo Trust annual Statement of Intent approved by the Lake Taupo Protection Project Joint Committee. Achieved Achieved Achieved
Percentage of the total Nitrogen reduction target contracted to achieve the 153 tonnes Nitrogen reduction objective. 100% 100% 100%

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Service Providers#

Provider 2013/14
Budgeted
$000
2013/14
Estimated Actual
$000
2014/15
Budget
$000
Reporting to the
House
Expiry of
Resourcing
Commitment
Non-Government Organisations          
Lake Taupo Protection Project Joint Committee through the Lake Taupo Protection Trust. 2,085 2,085 66 See above 30 June 2019

Current and Past Policy Initiatives#

Policy Initiative Year of
First
Impact
2013/14
Budgeted
$000
2014/15
Budget
$000
2015/16
Estimated
$000
2016/17
Estimated
$000
2017/18
Estimated
$000
Improving quality of water at Lake Taupo. 2010/11 800 368 - - -

Rena Long-term Environment Recovery (M29)#

Scope of Appropriation and Expenses#

Type, Title, Scope and Period of Appropriations Appropriations, Adjustments and Use $000

Rena Long-term Environment Recovery (M29)

This appropriation is limited to funding for the implementation of the Rena Long-term Environmental Recovery Plan.

Commences: 07 March 2012

Expires: 30 June 2015
Original Appropriation 2,872
Adjustments to 2012/13 (995)
Adjustments for 2013/14 542
Adjusted Appropriation 2,419
Actual to 2012/13 Year End 1,877
Estimated Actual for 2013/14 542
Estimated Actual for 2014/15 -
Estimated Appropriation Remaining -

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to achieve the effective implementation of the Rena Long-term Environmental Recovery Plan. The Plan sets out the goal and objectives for the long-term environmental recovery following the grounding of the Rena on Otaiti (Astrolabe Reef).

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
Percentage of project deliverables completed in accordance with the Rena Long-term environmental recovery plan. New measure 90% 100%

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Service Providers#

Provider 2013/14
Budgeted
$000
2013/14
Estimated Actual
$000
2014/15
Budget
$000
Reporting to the
House
Expiry of
Resourcing
Commitment
Bay of Plenty Regional Council 542  542 - See above 30 June 2015

Current and Past Policy Initiatives#

Policy Initiative Year of
First
Impact
2013/14
Budgeted
$000
2014/15
Budget
$000
2015/16
Estimated
$000
2016/17
Estimated
$000
2017/18
Estimated
$000
Rena Long-term environmental recovery plan - Update. 2013/14 542 - - - -

Te Mana o Te Wai - restoring the life-giving capacity of fresh water (M29)#

Scope of Appropriation#

This appropriation is limited to restoration initiatives, with involvement from community stakeholders, for New Zealand's freshwater bodies.

Expenses#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation - - 2,500

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to help communities to restore the life-giving capacity of their local freshwater bodies through initiatives such as planting riparian buffers; use of nitrate inhibitors, and establishing artificial or constructed wetlands.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
Percentage of completed restoration initiatives that achieve stated objectives. New measure New measure 100%

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Service Providers#

Provider 2013/14
Budgeted
$000
2013/14
Estimated Actual
$000
2014/15
Budget
$000
Reporting to the
House
Expiry of
Resourcing
Commitment
Non-Government Organisations          
Community groups that receive funding for restorative initiatives to increase the life-giving capacity of local freshwater bodies. - - 2,500 See above 30 June 2018

Current and Past Policy Initiatives#

Policy Initiative Year of
First
Impact
2013/14
Budgeted
$000
2014/15
Budget
$000
2015/16
Estimated
$000
2016/17
Estimated
$000
2017/18
Estimated
$000
Te Mana o Te Wai - restoring the life-giving capacity of freshwater 2014/15 - 2,500 2,500 - -

Reasons for Change in Appropriation#

This is a new appropriation established through Budget 2014.

3.4 - Non-Departmental Other Expenses#

Allocation of New Zealand Units (M12)#

Scope of Appropriation

This appropriation is limited to the granting of New Zealand Units to sectors of the New Zealand Economy.

Expenses

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 164,040 50,852 164,710

What is Intended to be Achieved with this Appropriation

This appropriation provides for incurring the expense by the Crown in relation to the allocation of New Zealand Units (NZUs) to sectors of the New Zealand economy under the New Zealand Emissions Trading Scheme.

How Performance will be Assessed and End of Year Reporting Requirements

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
Percentage of applicants deemed to be eligible receive units to compensate for increased costs resulting from the Emissions Trading Scheme. 100% 100% 100%
Percentage of eligible forestry participants, who have entered the Emissions Trading Scheme, that receive units. 100% 100% 100%

End of Year Performance Reporting

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Service Providers

Provider 2013/14
Budgeted
$000
2013/14
Estimated Actual
$000
2014/15
Budget
$000
Reporting to the
House
Expiry of
Resourcing
Commitment
Non-Government Organisations          
Participants eligible to receive units to compensate for increased costs resulting from the Emissions Trading Scheme. 164,040 50,852 164,710 See above Ongoing

Current and Past Policy Initiatives

Policy Initiative Year of
First
Impact
2013/14
Budgeted
$000
2014/15
Budget
$000
2015/16
Estimated
$000
2016/17
Estimated
$000
2017/18
Estimated
$000
Emissions Trading Scheme - Updating the Electricity Allocation Factor for 2013 and Beyond; and Exempting Small and Remote Landfills. 2012/13 (242) (242) (242) (242) (242
Emissions Trading Scheme Review 2012: Final Decisions on Amendments to the Climate Change Response Act 2002. 2012/13 (84,633) (96,672) (107,061) (107,061) (107,061)

Reasons for Change in Appropriation

The increase in this appropriation for 2014/15 primarily reflects the difference in price per carbon unit adopted for appropriation purposes. The appropriation is based on $10 per carbon unit, while the estimated actual is based on the current market price per carbon unit at the time of the forecast.

Climate Change Development Fund (M12)#

Scope of Appropriation#

This appropriation is limited to supporting international projects to assist developing countries address climate change issues.

Expenses#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 300 300 300

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to provide contributions to projects that advance international action to address climate change but which fall outside the New Zealand Official Development Assistance (NZ ODA) mandate.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
Percentage of funding distributed to international projects addressing climate change according to priority criteria (leverage, impact, continuity, consistency, visibility). 100% 100% 100%

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Service Providers#

Provider 2013/14
Budgeted
$000
2013/14
Estimated Actual
$000
2014/15
Budget
$000
Reporting to the
House
Expiry of
Resourcing
Commitment
Non-Government Organisations          
International projects those addresses climate change issues. 300 300 300 See above Ongoing

Scope of Appropriation#

This appropriation is limited to supporting groups that wish to advocate for environmental issues in resource management cases in the courts and appearances at Boards of Inquiry of projects of national significance.

Expenses#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 1,125 800 800

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to help remove barriers to public participation in resource management processes by providing financial assistance to non-for-profit groups to advocate for an environmental issue of high public interest in resource management cases at the Environment Court, and at boards of inquiry constituted under the "Call in" provisions of the Resource Management Act 1991.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
Percentage of funded groups that report a difference to how their case proceeded as a result of receiving funding from the Environmental Legal Assistance Fund. 80% 80% 80%

Fund Criteria#

Fund Fund Criteria
Environmental Legal Assistance Fund An independent panel assesses applications against primary criteria and other matters. The Primary criteria are as follows:
  • The focus of the case is the protection or enhancement of nationally or regionally important environmental qualities. Relevant considerations include: Resource Management Act Part II considerations, and the potential for useful case law.
  • The case affects the wider community or general public. Relevant considerations include: may improve the administration and efficiency of the Resource Management Act, the status of the activity in the statutory plans, maintaining the integrity of a statutory plan, impacts on the wider community or general public, public/private interest balance, and the significance of the environmental issues.
  • Whether the case involves issues of national importance which will not be addressed in full before the Environment Court or a board of inquiry without the expert evidence provided by the group.
  • The degree of collaboration, the commitment of the group, and the resources it can offer to support its case, including:
    • what strength of contribution has been made by the group, having regard to the position of the group, the pro bono contribution from lawyers and/or experts and its efforts to raise funds. A strong weighting will be given to those groups that have made a significant contribution
    • whether the contribution sought from the fund is proportionate to the total cost of the case, and
    • the group has shown that financial assistance is required as there is likely to be an imbalance between the level or quality of evidence and case management due to a lack of financial resources.

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Service Providers#

Provider 2013/14
Budgeted
$000
2013/14
Estimated Actual
$000
2014/15
Budget
$000
Reporting to the
House
Expiry of
Resourcing
Commitment
Non-Government Organisations          
Not-for-profit organisations groups such as environmental, community, iwi and hapu receive financial assistance to advocate for an environmental issue of high public interest. 1,125 800 800 See above Ongoing

Current and Past Policy Initiatives#

Policy Initiative Year of
First
Impact
2013/14
Budgeted
$000
2014/15
Budget
$000
2015/16
Estimated
$000
2016/17
Estimated
$000
2017/18
Estimated
$000
Reprioritisation from Legal and Environment Centre Grants. 2010/11 800 800 800 800 800

Reasons for Change in Appropriation#

The decrease in this appropriation for 2014/15 is in line with the established funding profile. This decrease is due to the fact that in 2013/14 there was a transfer of $325,000 from 2012/13 to provide assistance to fund appeals to the Environment Court and board of Inquiry proceedings.

Framework Convention on Climate Change (M12)#

Scope of Appropriation#

New Zealand's contribution to the United Nations Framework Convention on Climate Change.

Expenses#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 127 127 127

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to ensure New Zealand meets its international financial obligations to the United Nations Framework Convention on Climate Change (UNFCCC) to ensure New Zealand's participation in international forums that aim to develop a global response to stabilising greenhouse gas concentrations in the atmosphere.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
Contribution to the United Nations Framework Convention on Climate Change enables New Zealand to participate in international forums. Achieved Achieved Achieved

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Fresh Start for Fresh Water: Waikato River Clean-up Fund (M29)#

Scope of Appropriation#

This appropriation is limited to funding for the Waikato River Clean-up Fund for the restoration and protection of the health and wellbeing of the Waikato River for future generations.

Expenses#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 5,065 5,065 5,291

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to meet the Crown's obligation under the Deed of Settlement with Waikato-Tainui to provide funding for a contestable Clean-up Fund, administered by the Waikato River Clean-up Trust, to fund initiatives for the restoration and protection of the health and wellbeing of the Waikato River for present and future generations.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
The Crown's obligation under the Deed of Settlement with Waikato-Tainui to periodically settle sums on the Trustees of the Waikato River Clean-Up Trust has been met. Agreed sum paid on the due date Agreed sum paid on the due date Agreed sum paid on the due date

Fund Criteria#

The Waikato River Clean-up Fund is administered by the Waikato River Clean-up Trust. For more information on the criteria for this Fund, please refer to the 'Waikato River Clean-up Trust Funding Strategy 2013' on the Waikato River Authority's (the sole Trustee of the Waikato River Clean-up Trust) website: www.waikatoriver.org.nz/key-documents/.

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Service Providers#

Provider 2013/14
Budgeted
$000
2013/14
Estimated Actual
$000
2014/15
Budget
$000
Reporting to the
House
Expiry of
Resourcing
Commitment
Non-Government Organisation          
Waikato River Authority 5,065 5,065 5,291 See above 30 June 2038

Current and Past Policy Initiatives#

Policy Initiative Year of
First
Impact
2013/14
Budgeted
$000
2014/15
Budget
$000
2015/16
Estimated
$000
2016/17
Estimated
$000
2017/18
Estimated
$000
Upper Waipa River Clean-up Fund Commitments. 2011/12 333 333 333 333 333

Reasons for Change in Appropriation#

In accordance with New Zealand Financial Reporting Standards, the Ministry recognised the payment of $210 million over 30 years to the Waikato River Clean-up Trust as an expense in 2009/10 in net present value terms and an additional $10 million payment for the Waipa River extension clean-up as an expense in 2011/12 in net present value terms. The expense recognised annually since, represents the unwinding of the discounts recognised in 2009/10 and 2011/12. It does not represent the cash payments made each financial year. These remain unchanged from what was agreed under the deeds of settlement. The cash payment profile as per the deeds of settlement is an annual payment of $7.333 million until 2036/37 and $7.342 million in 2037/38.

Impairment of Debt Relating to Climate Change Activities (M12)#

Scope of Appropriation#

This appropriation is limited to the impairment and write down of Crown debt arising from Climate Change related activities.

Expenses#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation - - 8,700

Comparators for Restructured Appropriation#

  2013/14 2014/15
Vote, Type and Title of Appropriation Budgeted
$000
Estimated Actual
$000
Budget
$000
Vote Environment      
Non-Departmental Other Expenses      
Impairment of Debt Relating to the New Zealand Emissions Trading Scheme 3,500 0 -
Impairment of Debt Relating to the Synthetic Greenhouse Gas Levy 200 0 -
Total 3,700 0 8,700

What is Intended to be Achieved with this Appropriation#

This appropriation provides for incurring the expense involved in the impairment and write-down of Crown debt arising from climate change related activities. Examples of climate change related activities including the collection of the Synthetic Greenhouse Gas Levy and the surrendering of Emission Trading Units.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
Debt to be impaired is identified in a timely manner and is written off in accordance with generally accepted accounting practices. New measure New measure Achieved

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Reasons for Change in Appropriation#

This appropriation was approved during the year to provide for the potential non-collectability of debts arising from Climate Change related activities.

Impairment of Debt Relating to Environment Activities (M29)#

Scope of Appropriation#

This appropriation is limited to the impairment and write down of Crown debt arising from Environment related activities excluding Climate Change.

Expenses#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation - - 1,500

Comparators for Restructured Appropriation#

  2013/14 2014/15
Vote, Type and Title of Appropriation Budgeted
$000
Estimated Actual
$000
Budget
$000
Vote Environment: Non-Departmental Other Expense: Impairment of Debt relating to the Waste Disposal Levy collection. 1,500 0 -
Total 1,500 0 1,500

What is Intended to be Achieved with this Appropriation#

This appropriation provides for incurring the expense involved in the impairment and write-down of Crown debt arising from environment related activities (excluding climate change activities). An example of an environment related activity is the collection of the Waste Disposal Levy under the Waste Minimisation Act 2008.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
Debt to be impaired is identified in a timely manner and is written off in accordance with generally accepted accounting practices. New measure New measure Achieved

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Reasons for Change in Appropriation#

This appropriation was approved during the year to provide for the potential non-collectability of debts arising from Environment related activities.

International Subscriptions (M29)#

Scope of Appropriation#

This appropriation is limited to subscriptions to International Environmental Agreements.

Expenses#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 117 117 117

What is Intended to be Achieved with this Appropriation#

This appropriation provides for New Zealand's subscriptions to International Environmental Agreements it has ratified (for example, the Basel, Stockholm, Rotterdam and Montreal Protocols) to ensure New Zealand's participation in related international forums on global environmental issues.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
Subscriptions to International Environmental Agreements enable New Zealand to participate in related international forums. Achieved Achieved Achieved

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Service Providers#

Provider 2013/14
Budgeted
$000
2013/14
Estimated Actual
$000
2014/15
Budget
$000
Reporting to the
House
Expiry of
Resourcing
Commitment
Non-Government Organisations          
United Nations Environment Programme and the Secretariat of the Pacific Regional Environment Programme. 117 117 117 See above Ongoing

Te Pou Tupua (M29)#

Scope of Appropriation#

This appropriation is limited to the Crown contribution to support Te Pou Tupua (the Whanganui River Guardian) functions.

Expenses#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 2,490 2,490 96

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to meet the Crown's obligation under the Tutohu Whakatapua agreement with Whanganui iwi to provide ongoing support to Te Pou Tupua Putea - guardians who act on behalf of Te Awa Tupua to protect its status and health and wellbeing.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
The Crown's obligation under the Tutohu Whakatapua agreement with Whanganui iwi to provide ongoing funding support to Te Pou Tupua has been met. New measure New measure Agreed sum paid on the due date

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Current and Past Policy Initiatives#

Policy Initiative Year of
First
Impact
2013/14
Budgeted
$000
2014/15
Budget
$000
2015/16
Estimated
$000
2016/17
Estimated
$000
2017/18
Estimated
$000
Funding for the governance and operational costs of Whanganui River. 2014/15 - 200 200 200 200

Reasons for Change in Appropriation#

In accordance with New Zealand Financial Reporting Standards, the Ministry recognised the payment of $4 million over 20 years to the Te Pou Tupua as an expense in 2013/14 in net present value terms. The expense recognised annually since, represents the unwinding of the discounts recognised in 2013/14. It does not represent the cash payment made each financial year. This remains unchanged from what was agreed with Whanganui iwi under the agreement. The cash payment profile as per the agreement is an annual payment of $200,000 until 2033/34.

United Nations Environment Programme (M29)#

Scope of Appropriation#

New Zealand's membership of the United Nations Environment Programme.

Expenses#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 393 393 393

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to ensure New Zealand meets its financial obligations to the United Nations Environment Programme in order to protect and advance its interest in that organisation's work programme and processes.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
Contributions to the United Nations Environment Programme help New Zealand to fulfil its international obligations. Achieved Achieved Achieved

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Waikato River Co-Governance (M29)#

Scope of Appropriation#

This appropriation is limited to the governance and operational costs of Waikato River co-governance.

Expenses#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 910 910 910

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to meet the Crown's obligation under the Deed of Settlement with Waikato-Tainui to provide financial assistance to the Waikato River Authority ensuring Waikato-Tainui's participation in the co-governance processes under the settlement.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
The Crown's obligation in respect of ensuring the Waikato River Authority is supported with appropriate secretariat resources has been met. Agreed sum paid on the due date Agreed sum paid on the due date Agreed sum paid on the due date

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Current and Past Policy Initiatives#

Policy Initiative Year of
First
Impact
2013/14
Budgeted
$000
2014/15
Budget
$000
2015/16
Estimated
$000
2016/17
Estimated
$000
2017/18
Estimated
$000
Original funding for the governance and operational costs of Waikato River Authority. 2010/11 910 910 1,195 910 910

Waikato River Co-Management (M29)#

Scope of Appropriation#

This appropriation is limited to enabling the Waikato River Iwi to engage in the new co-management arrangements in relation to the Waikato River.

Expenses#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 2,810 2,810 2,873

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to meet the Crown's obligation under the Deed of Settlement with Waikato-Tainui to provide funding for practical and efficient co-management arrangements for the Waikato River. The co-management agreements provide an integrated approach between Waikato-Tainui and central and local government to the management of the Waikato River.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
The Crown's obligation under the Deed of Settlement with Waikato-Tainui to settle sums on the trustees of the five Waikato River iwi (Waikato-Tainui, Maniapoto, Ngati Tuwharetoa, Affiliate Te Arawa iwi/hapu and Raukawa) has been met. Agreed sum paid on the due date Agreed sum paid on the due date Agreed sum paid on the due date

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Service Providers#

Provider 2013/14
Budgeted
$000
2013/14
Estimated Actual
$000
2014/15
Budget
$000
Reporting to the
House
Expiry of
Resourcing
Commitment
Non-Government Organisations          
Five Waikato River Iwi. 2,810 2,810 2,873 See above 30 June 2030

Reasons for Change in Appropriation#

In accordance with New Zealand Financial Reporting Standards the Ministry recognised the payment of $150 million over 30 years to the Waikato River Iwi as an expense in 2009/10 in net present value terms. The expenses recognised annually since represent the unwinding of the discount recognised in 2009/10. It does not represent the cash payments made each financial year. These remain unchanged from what was agreed under the deeds of settlement. The cash payment profile as per the deeds of settlement is $5 million in 2014/15 and each year until 2027/28 and then $4 million in 2028/29 and 2029/30.

Waste Disposal Levy Disbursements to Territorial Local Authorities (M29)#

Scope of Appropriation#

This appropriation is limited to payments to Territorial Local Authorities of their proportion of the Waste Disposal Levy as prescribed under the Waste Minimisation Act 2008.

Expenses#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000
Total Appropriation 14,000 14,000 14,000

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to achieve more effective and efficient waste management and minimisation across the country through the distribution of 50 per cent of the Waste Disposal Levy (collected under the Waste Minimisation Act 2008) to Territorial Authorities, on a per head of population basis, to fund activities set out in their Waste Management and Minimisation Plans.

How Performance will be Assessed and End of Year Reporting Requirements#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard
Percentage of territorial authorities that are paid the accurate share of the levy revenue on time when their statutory responsibilities have been met. 100% 100% 100%

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Service Providers#

Provider 2013/14
Budgeted
$000
2013/14
Estimated Actual
$000
2014/15
Budget
$000
Reporting to the
House
Expiry of
Resourcing
Commitment
Territorial Local Authorities          
Territorial Local Authorities (approximately 67 authorities, of which two receive more than $1 million per annum). 14,000 14,000 14,000 See above Ongoing

Part 4 - Details of Multi-Category Expenses and Capital Expenditure#

Multi-Category Expenses and Capital Expenditure#

Climate Change (M12)

Overarching Purpose Statement

The overarching purpose of this appropriation is to provide policy advice and other support to Ministers focusing on decreasing New Zealand's net emissions of greenhouse gases below business as usual levels in a cost-effective way.

Scope of Appropriation

Departmental Output Expenses
Domestic Climate Change Programme Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to domestic climate change.
International Climate Change Programme Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to international climate change issues, negotiating positions for climate change agreements and development of carbon markets.
Synthetic Greenhouse Gas Levy
This category is limited to the implementation and collection of the Synthetic Greenhouse Gas Levy.

Expenses, Revenue and Capital Expenditure

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000

Total Appropriation

- - 7,061

Departmental Output Expenses

     
Domestic Climate Change Programme Policy Advice - - 3,462
International Climate Change Programme Policy Advice - - 3,550
Synthetic Greenhouse Gas Levy - - 49

Funding for Departmental Output Expenses

     

Revenue from the Crown

- - 7,061
Domestic Climate Change Programme Policy Advice - - 3,462
International Climate Change Programme Policy Advice - - 3,550
Synthetic Greenhouse Gas Levy - - 49

Revenue from Others

- - -
Domestic Climate Change Programme Policy Advice - - -
International Climate Change Programme Policy Advice - - -
Synthetic Greenhouse Gas Levy - - -

Comparators for Restructured Appropriation

  2013/14 2014/15
Vote, Type and Title of Appropriation Budgeted
$000
Estimated Actual
$000
Budget
$000
Vote Environment      
Departmental Output Expenses      
Domestic Climate Change Programme Policy Advice 2,914 2,914 3,462
International Climate Change Programme Policy Advice 3,596 3,596 3,550
Synthetic Greenhouse Gas Levy 49 49 49
Total 6,559 6,559 7,061

The previous MCOA Climate Change has been converted to an MCA.

What is Intended to be Achieved with this Appropriation

This appropriation is intended to achieve policy advice and other support to Ministers focusing on reducing New Zealand's greenhouse gas emissions in a cost-effective way; managing the risks posed by climate change impacts; and contributing to coordinated international action to stabilise greenhouse gas concentrations in the atmosphere.

How Performance will be Assessed for this Appropriation

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard

Climate Change

     
Trends in greenhouse gas emissions and removals in the annual greenhouse gas inventory. Downward trend in net emissions Net emissions under the Kyoto Protocol were lower in 2011 than they were in 2008. Downward trend in net emissions
Trends in greenhouse gas intensity of the economy by emissions per unit of GDP and emissions per capita. Downward trends Downward trends Downward trends
Divergence between forecast net position and Kyoto Protocol obligations. Decreasing liability/increasing asset Increased surplus of units but decreasing bookable value of the asset due to a fall in carbon price Decreasing liability/increasing asset

What is Intended to be Achieved with each Category and How Performance will be Assessed

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard

Climate Change

     

Departmental Output Expenses

     
Domestic Climate Change Programme Policy Advice
     
This category is intended to achieve policy advice on domestic climate change issues, such as the effective operation and evolution of the New Zealand Emissions Trading Scheme and the need for other mitigation measures.      
Percentage of agreed deliverables in relation to the domestic climate change work programme completed within agreed timeframes. (see Note 2) 100% 100% 100%
International Climate Change Programme Policy Advice
     
This category is intended to enable participation in international climate change negotiations, provide policy advice on New Zealand's negotiating position and possible New Zealand contributions under a new global agreement, and the projection and reporting on New Zealand's greenhouse gas emissions and removals to comply with international obligations and track progress towards meeting New Zealand's commitments.      
Percentage of agreed deliverables in relation to international negotiating positions and resulting submissions completed within agreed timeframes. (See Note 2) 100% 100% 100%
New Zealand's annual greenhouse gas inventory meets agreed deadlines and is accepted by international institutions as meeting UNFCCC and Kyoto Protocol reporting requirements 100% 100% 100%
Synthetic Greenhouse Gas Levy
     
This category is intended to achieve the efficient administration of the Synthetic Greenhouse Gas Levy Collection System by the New Zealand Transport Agency and New Zealand Customs Service.      
Administer the funding for the ongoing costs of collecting the Synthetic Greenhouse Gas Levy by New Zealand Transport Agency and New Zealand Customs Service in accordance with respective Memoranda of Understanding Achieved Achieved Achieved

Note 1 - Policy performance targets apply to all four Ministry for the Environment Departmental Multi-category Appropriations (MCAs) and therefore it is more meaningful to aggregate these targets across these output classes. The full set of measures, including targets for 2014/15 and relevant notes are published under the Ministerial Services appropriation.

Note 2 - Deliverables are agreed between the Minister and the Ministry and set out in the Output Plan.

End of Year Performance Reporting

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Reasons for Change in Appropriation

The increase in this multi-category appropriation for 2014/15 is primarily due to a reprioritisation of funding towards Environmental Reporting.

Environmental Management Obligations and Programmes (M29)#

Overarching Purpose Statement#

The overarching purpose of this appropriation is to provide policy advice and other support to Ministers focusing on achieving better solutions to environmental problems by supporting community involvement and action and international cooperation.

Scope of Appropriation#

Departmental Output Expenses

Domestic Obligations and Programmes
This category is limited to contributing to and monitoring of domestic environmental management programmes and educational programmes promoting awareness of environmental issues.
International Obligations and Institutions Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to advice on international environmental arrangements, agreements and partnerships; contributing to negotiations with international parties on environmental issues in line with international arrangements, agreements and partnerships.

Expenses, Revenue and Capital Expenditure#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000

Total Appropriation

- - 3,335

Departmental Output Expenses

     
Domestic Obligations and Programmes - - 1,705
International Obligations and Institutions Policy Advice - - 1,630

Funding for Departmental Output Expenses

     

Revenue from the Crown

- - 3,330
Domestic Obligations and Programmes - - 1,700
International Obligations and Institutions Policy Advice - - 1,630

Revenue from Others

- - 5
Domestic Obligations and Programmes - - 5
International Obligations and Institutions Policy Advice - - -

Comparators for Restructured Appropriation#

  2013/14 2014/15
Vote, Type and Title of Appropriation Budgeted
$000
Estimated Actual
$000
Budget
$000
Vote Environment      
Departmental Output Expenses      
Domestic Obligations and Programmes 2,083 2,083 1,705
International Obligations and Institutions Policy Advice 1,603 1,603 1,630
Total 3,686 3,686 3,335

The previous MCOA Environmental Management Obligations and Programmes has been converted to an MCA.

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to achieve solutions to environmental problems through community involvement and international cooperation that are better than what the Ministry could achieve alone. The activities under this appropriation are mainly operational, with a focus on administering government funding, coordinating activities with partner countries, and involvement in projects with other organisations.

How Performance will be Assessed for this Appropriation#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard

Environmental Management Obligations and Programmes

     
Progress in investigation, remedial planning or remediation of priority contaminated sites in conjunction with regional councils and / or landowners - increasing percentage managed or remediated. Increasing proportion of priority contaminated sites remediated and / or managed Total priority sites identified = 72 sites; Remediated priority sites = 20; Managed Priority Sites = 7; Percentage remediated/managed = 38% Increasing proportion of priority contaminated sites remediated and / or managed
Level of community involvement in projects funded by the Community Environment Fund. Increasing community involvement 14.4 million of in-kind contributions projected for the $7.5 million of government funding committed to 75 Community Environment Fund projects Increasing community involvement
Percentage of Community Environment Fund and Waste Minimisation Fund completed projects that report full achievement against objectives. 100% of objectives met by 80% of completed projects 100% of objectives met by 76% of projects 100% of objectives met by 80% of completed projects

What is Intended to be Achieved with each Category and How Performance will be Assessed#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard

Environmental Management Obligations and Programmes

     

Departmental Output Expenses

     
Domestic Obligations and Programmes
     
This category is intended to achieve the efficient administration of grant schemes through which parties can seek funding to achieve environmental objectives. Through these grant schemes, the government partners with community organisations and councils to achieve more than either party could achieve alone.      
The Community Environment Fund eligibility and assessment criteria is aligned with the Ministry's Outcome Framework. Achieved Achieved Achieved
Percentage of completed Community Environment Fund projects administered within acceptable timeframes (after funding agreement signed). (See Notes 2 and 3) 80% 80% 80%
Percentage of Community Environment Fund applicants whose projects are completed are satisfied (or better) with the timeliness and quality of advice received from the Ministry throughout the course of their project. 80% satisfied or better 80% satisfied or better 80% satisfied or better
Percentage of funding rounds for the Community Environment Fund that proceed through Stage 1 in under 12 weeks per round (standard term: 60 working days). (See Note 4) 100% 50% 100%
Percentage of Environmental Legal Assistance grants administered within acceptable timeframes. 80% 90% 80%
Percentage of completed Environmental Legal Assistance grants reporting that the quality of advice received from the Ministry throughout the course of their project as satisfactory or better. 80% satisfied or better 80% satisfied or better 80% satisfied or better
Percentage of contestable funding allocated according to Contaminated Sites Remediation Fund eligibility and assessment criteria within agreed timeframes. 100% 100% 100%
Percentage of Contaminated Sites Remediation Fund applicants whose projects are completed are satisfied (or better) with the timeliness and quality of advice received from the Ministry throughout the course of their project. 80% satisfied or better 100% satisfied or better 80% satisfied or better
Administration costs are no more than 12% of the total funds being allocated. (See Note 5) Not more than 12% 9.48% Not more than 12%
International Obligations and Institutions Policy Advice
     
This category is intended to achieve cooperation with other countries to promote action on important international environmental issues and to ensure that New Zealand's interests are protected and advanced and obligations are met under multi-lateral environment agreements.      
Percentage of agreed deliverables in relation to international obligations completed within agreed timeframes. (See Note 2) 100% 100% 100%

Note 1 - Policy performance targets apply to all four Ministry for the Environment Departmental Multi-category Appropriations (MCAs) and therefore it is more meaningful to aggregate these targets across these output classes. The full set of measures, including targets for 2014/15 and relevant notes are published under the Ministerial Services appropriation.

Note 2 - Administration functions include project planning and deed negotiation, milestone assessment and payment, and responding to general enquiries. Upon completion of their project, applicants will be required to provide an assessment within their final report of whether these administration functions were carried out within timeframes they considered acceptable. The assessment will be based on a scale of one to five. A score of four or five will be taken as meaning that the timeframes were acceptable.

Note 3 - Deliverables are agreed between the Minister and the Ministry and set out in the Output Plan.

Note 4 - There is one contestable Community Environment Fund funding round currently open and a targeted round is expected to open before the end of the 2013/14 financial year. Specific circumstances, such as changes to the process and the requirement to appoint a new Panel, have increased the timeframe for the current funding round.

Note 5 - The Ministry has developed robust processes around funds management to ensure that funded projects are successful and that there is transparent accountability for public money. There are a range of activities undertaken before funding is guaranteed which include: due diligence; project planning; and, deed negotiation. The Ministry engages with the fund recipients during the project delivery (projects span between 1 and 3 years), providing advice when sought and undertaking a vigorous assessment of milestone deliverables. All recipients are visited by officials at least once during the project's lifetime. The Community Environment Fund grants are smaller in nature than many other funds that the Ministry administers, ranging from $10,000 to $300,000. There are also a higher number of projects than most other grants. All of these factors result in higher percentage administration costs.

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Reasons for Change in Appropriation#

The decrease in this multi-category appropriation for 2014/15 is primarily due to a reprioritisation of funding towards Environmental Reporting.

Environmental Protection Authority: Regulatory Functions (M29)#

Overarching Purpose Statement#

The overarching purpose of this appropriation is to provide advice and other support to Ministers focusing on the regulatory functions carried out by the Environmental Protection Authority.

Scope of Appropriation#

Non-Departmental Output Expenses

Compliance and Enforcement
This category is limited to the compliance and enforcement functions of the activities applicable to EPA's regulatory functions.
Decision Making
This category is limited to the enabling and supporting decision-making processes for approvals of the activities applicable to EPA's regulatory functions.
Exclusive Economic Zone Major Prosecutions Fund
This category is limited to major prosecutions relating to activities regulated under the Exclusive Economic Zone and Continental Shelf (Environmental Effects) Act 2012.
Supporting Environmental Management
This category is limited to supporting decision-making frameworks and providing advice on the implementation and effectiveness of policy, legislation and international developments in the management of hazardous substances, ozone-depleting substances, hazardous waste, new organisms and resource management processes at the national level.

Expenses, Revenue and Capital Expenditure#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000

Total Appropriation

- - 18,585

Non-Departmental Output Expenses

     
Compliance and Enforcement - - 8,404
Decision Making - - 10,181
Exclusive Economic Zone Major Prosecutions Fund - - -
Supporting Environmental Management - - -

Comparators for Restructured Appropriation#

  2013/14 2014/15
Vote, Type and Title of Appropriation Budgeted
$000
Estimated Actual
$000
Budget
$000
Vote Environment      
Non-Departmental Output Expenses      
Compliance and Enforcement 3,722 3,722 8,404
Decision Making 7,723 7,723 10,181
Supporting Environmental Management 4,655 4,655 -
Total 16,100 16,100 18,585

The previous MCOA Environmental Protection Authority: Regulatory Functions has been converted to an MCA.

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to achieve policy advice and other support to Ministers focusing on the efficiency and effectiveness of the regulatory functions carried out by the Environmental Protection Authority.

How Performance will be Assessed for this Appropriation#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard

Environmental Protection Authority: Regulatory Functions

     
Trends in EPA compliance with resource consent processing times under the RMA 1991. 100% 100% 100%

What is Intended to be Achieved with each Category and How Performance will be Assessed#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard

Environmental Protection Authority: Regulatory Functions

     

Non-Departmental Output Expenses

     
Compliance and Enforcement
     
This category is intended to achieve an increased awareness of and ensure compliance with legislation, regulations, approvals and permits in relation to hazardous substances, ozone-depleting substances, hazardous waste, new organisms and Exclusive Economic Zone activities.      
All central government enforcement agencies regard the annual HSNO Act compliance activities and intentions report to be fair and accurate and consider they had an acceptable opportunity to provide input into the process and the report. 100% 100% 100%
Enquirers surveyed find the EPA's compliance information clear and helpful. New measure 70% 70%
Decision Making
     
The category is intended to ensure efficient decision-making processes for approvals or permits relating to new organisms and hazardous substances, the import/use/export of ozone-depleting substances and hazardous waste of international concern; the consideration of resource management proposals of national significance; and Exclusive Economic Zone applications.      
EPA processes all applications to import or use hazardous substances or new organisms according to statutory processes and within statutory timeframes (as prescribed by sections 52 and 59 of the HSNO Act). 100% 100% 100%
Percentage of applications to the Environmental Protection Authority that are referred to a Board of Inquiry are processed within nine months, unless the timeframe is extended by the responsible Minister. 100% 100% 100%
EPA processes all marine consent applications according to statutory processes and within statutory timeframes (as prescribed under the EEZ Act). New measure New measure 100%
Exclusive Economic Zone Major Prosecutions Fund
     
Supporting Environmental Management
     

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Environmental Protection Authority in its Annual Report.

Current and Past Policy Initiatives#

Policy Initiative Year of
First
Impact
2013/14
Budgeted
$000
2014/15
Budget
$000
2015/16
Estimated
$000
2016/17
Estimated
$000
2017/18
Estimated
$000
Improving Health and Safety at Work. 2014/15 - 785 35 35 35
Exclusive Economic Zone functions with the EPA 2014/15 - 3,200 - - -
Establishment of the Environmental Protection Authority: Regulatory Functions. 2011/12 14,600 14,600 14,600 14,600 14,600

Reasons for Change in Appropriation#

The structure of this Multi category appropriation has been changed from three categories to two. The new structure reduces ambiguity between costs allocated to decision making process and supporting processes.

The increase in this Multi-category appropriation for 2014/15 is primarily due to:

  • a transfer of $785,000 for 2014/15 from Vote Labour in relation to Improving Health and Safety at Work programme
  • funding of $3.200 million to allow the Environmental Protection Authority (EPA) to implement the functions under the Exclusive Economic Zone and Continental Shelf (Environmental Effects) Act 2012.

This increase is partially offset by an expense transfer of $1.500 million from 2012/13 to 2013/14.

Improving Resource Management (M29)#

Overarching Purpose Statement#

The overarching purpose of this appropriation is to provide policy advice and other support to Ministers focusing on improving resource management.

Scope of Appropriation#

Departmental Output Expenses

Developing and Implementing Treaty Settlements and Environmental Accords Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to environmental accords with Maori and Treaty settlements involving natural resources; contributing to negotiations with iwi and affected parties on environmental issues as part of developing deeds of settlement.
Marine Environment Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the marine environment.
Resource Management Implementation
This category is limited to the implementation of tools, frameworks and institutions and provision of advice, support, information, and guidance to the public, practitioners and wider natural resource sector in relation to resource management policy and practices.
Resource Management Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the management of natural and physical resources in New Zealand.
Water Management Implementation
This category is limited to activities associated with the implementation of water management policy and practises.
Water Management Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the quality, flow and availability of freshwater.

Non-Departmental Output Expenses

Water science and economics
This category is limited to water science and economic impact analyses, and guidance to support development of the National Objectives Framework.

Expenses, Revenue and Capital Expenditure#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000

Total Appropriation

- - 32,840

Departmental Output Expenses

     
Developing and Implementing Treaty Settlements and Environmental Accords Policy Advice - - 1,224
Marine Environment Policy Advice - - 1,316
Resource Management Implementation - - 11,685
Resource Management Policy Advice - - 4,797
Water Management Implementation - - 3,000
Water Management Policy Advice - - 8,818

Non-Departmental Output Expenses

     
Water science and economics - - 2,000

Funding for Departmental Output Expenses

     

Revenue from the Crown

- - 30,840
Developing and Implementing Treaty Settlements and Environmental Accords Policy Advice - - 1,224
Marine Environment Policy Advice - - 1,316
Resource Management Implementation - - 11,685
Resource Management Policy Advice - - 4,797
Water Management Implementation - - 3,000
Water Management Policy Advice - - 8,818

Revenue from Others

- - -
Developing and Implementing Treaty Settlements and Environmental Accords Policy Advice - - -
Marine Environment Policy Advice - - -
Resource Management Implementation - - -
Resource Management Policy Advice - - -
Water Management Implementation - - -
Water Management Policy Advice - - -

Comparators for Restructured Appropriation#

  2013/14 2014/15
Vote, Type and Title of Appropriation Budgeted
$000
Estimated Actual
$000
Budget
$000

Vote Environment

     

Departmental Output Expenses

     
Developing and Implementing Treaty Settlements and Environmental Accords Policy Advice 1,235 1,235 1,224
Marine Environment Policy Advice 1,603 1,603 1,316
Resource Management Implementation 8,995 8,995 11,685
Resource Management Policy Advice 4,275 4,275 4,797
Water Management Implementation 0 0 3,000
Water Management Policy Advice 9,046 9,046 8,818

Non-Departmental Output Expenses

     
Water science and economics 0 0 2,000
Total 25,154 25,154 32,840

The previous MCOA Improving Resource Management has been converted to an MCA.

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to achieve policy advice and other support to Ministers with a focus on improving the resource management frameworks so that natural and built resources are allocated efficiently and used sustainably to achieve the greatest overall environmental, economic, social and cultural benefits now and for successive generations.

How Performance will be Assessed for this Appropriation#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard

Improving Resource Management

     
The national environmental standard for air quality (PM10 fine particulate pollution) is complied with by the target dates in the standards. 100% compliance by 2020 Static level of compliance overall / 100% compliance against 2011 target 100% compliance by 2020
Trends in EPA and local government compliance with resource consent processing times under the RMA 1991. Upward trend (councils) / 100% (EPA) Upward trend (Councils) / 99 per cent (EPA) Upward trend (councils) / 100% (EPA)
Percentage of Maori partners in deeds of settlement and environmental accords satisfied or very satisfied with Ministry implementation of obligations. 80% satisfied or very satisfied 100% satisfied or very satisfied 80% satisfied or very satisfied
Percentage of relevant Ministry obligations under deeds of settlement and environmental accords met. 100% compliance 90% compliance 100% compliance
Proportion of water allocated for consumptive purposes that is subject to measurement and reporting. Increasing proportion Benchmark information provided 31% Increasing proportion
Number of large surface water catchments that have quantified flow regimes in place that set limits. Increasing number Benchmark information provided due to a change in methodology (58% of rivers and streams; 0% of wetlands; 6% of lakes) Increasing number
Number of significant catchments that have quantified policy for land and water management that sets surface water quality limits. Increasing number Benchmark information provided due to a change in methodology (4% of rivers and streams; 24% of wetlands; 18% lakes) Increasing number
Number of monitored sites showing maintained or improved water quality. Increasing proportion of monitored sites improving Benchmark information provided due to a change in methodology Increasing proportion of monitored sites improving

What is Intended to be Achieved with each Category and How Performance will be Assessed#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard

Improving Resource Management

     

Departmental Output Expenses

     
Developing and Implementing Treaty Settlements and Environmental Accords Policy Advice
     
This category is intended to achieve policy advice to Ministers in relation to the negotiation and implementation of Treaty settlements and environmental accords to ensure that settlements provide appropriate redress while remaining consistent with existing natural resources policy objectives.      
Percentage of agreed deliverables relating to Treaty Settlements and environmental accords negotiations are completed within agreed timeframes. (See Note 2) 100% 100% 100%
Percentage of obligations met in accordance with the Waikato River Co-management deeds. 100% 100% 100%
Marine Environment Policy Advice
     
This category is intended to achieve policy advice to Ministers in relation to the regulatory framework that protects New Zealand's marine environment while enabling economic growth in a sustainable way.      
Provide advice on the implementation of the Exclusive Economic Zone and Continental Shelf regulatory regime, within agreed timeframes New measure New measure Achieved
Resource Management Implementation
     
This category is intended to assist Ministers with their statutory functions under the Resource Management Act 1991; and support improvements to the resource management framework through effective implementation, including the provision of advice, guidance and training to support legislative reform and the management of resource management practice programmes.      
Percentage of demand driven requests for Resource Management Act processes that the Ministry has responsibility for that are completed within statutory timeframes. 100% 100% 100%
Percentage of demand driven requests for Resource Management Act processes that the Ministry has responsibility for and do not have statutory timeframes, that are completed within other agreed timeframes. 100% 100% 100%
Percentage of agreed deliverables in relation to the implementation of the Resource Management Amendment Act 2013 and the 2014 Resource Management Reform Bill (including amendment of current regulations, and development of guidance material and roadshows, improved council engagement, update of Quality Planning guidance notes and Making Good Decisions accreditation material) that are completed within agreed timeframes. New measure 100% 100%
Percentage of agreed deliverables relating to the development of the National Monitoring System (NMS), implementation of the Christchurch and Auckland district plans process, and other material as required, that are completed within agreed timeframes. New measure 100% 100%
Percentage of agreed deliverables in relation to improving environmental reporting so that reporting is credible, fairly represents the overall position in New Zealand, and provides an integrated picture of environmental and economic performance, that are completed within agreed timeframes. 100% 100% 100%
Percentage of agreed deliverables in relation to the implementation of the 2014 Environmental Reporting Bill (including development of new regulations) that are completed within agreed timeframes. New measure New measure 100%
Publication of first Synthesis Report under new environmental reporting regime. New measure New measure 30 June 2015
Resource Management Policy Advice
     
This category is intended to achieve policy advice to Ministers in relation to improving the resource management framework so that it is easy to use, provides certainty and predictability, and reduces unnecessary duplication and cost. It provides greater confidence for businesses to grow and create jobs, and greater certainty for communities to plan for their area's needs now and in the future.      
Provide advice to Minister on forward agenda of priorities for national direction under the Resource Management Act 1991, on developing new national instruments and on existing national instruments within agreed timeframes. New measure 100% 30 September 2014
Percentage of agreed deliverables to support the drafting and parliamentary process for the 2014 Resource Management Bill (excluding water reform) that are completed within agreed timeframes. New measure 100% 100%
Advice on further resource management reforms that may be required following the passing of the 2014 Resource Management Reform Bill is provided within agreed timeframes. New measure New measure Achieved
Percentage of agreed deliverables in relation to monitoring relevant Crown entities that are completed within agreed timeframes. 100% 100% 100%
Water Management Implementation
     
This category is intended to support improvements to the freshwater management framework through effective implementation, including the provision of tools, guidance, and support to councils to ensure high quality water plans are in place by 2030.      
Percentage of agreed deliverables in relation to the implementation of the freshwater reforms that are completed within agreed timeframes. New measure New measure 100%
Percentage of agreed pieces of guidance or direction that are completed within agreed timeframes. New measure New measure 100%
Water Management Policy Advice
     
This category is intended to achieve policy advice to Ministers in relation to improving the quality, flow and availability of fresh water through more effective freshwater management frameworks that encourage upfront collaborative decision-making, where decisions are made quickly, are more transparent and better targeted, and are supported by robust information about their impacts. The frameworks create more certainty for investors and encourage economic growth within environmental limits.      
Percentage of Fresh Start for Fresh Water Clean-up Fund projects and other freshwater clean-ups that are managed and monitored appropriately. 100% 100% 100%
Percentage of agreed deliverables in relation to the development of the freshwater reforms (not related to the 2014 Resource Management Bill) that are completed within agreed timeframes. New measure 100% 100%
Percentage of agreed deliverables to support the drafting and parliamentary process for the 2014 Resource Management Bill, specifically in relation to water reform, that are completed within agreed timeframes. New measure 100% 100%

Non-Departmental Output Expenses

     
Water science and economics
     
This category is intended to build science and economics knowledge and capability through the development of the science underpinning the attributes for the National Objectives Framework, and the understanding of the economic impacts associated with setting limits for these attributes, so that regional councils can consider and understand the environmental and economic impacts of the choices they are making.      
Number of attributes prepared for population in the National Objectives Framework based on the investment New measure New measure 3

Note 1 - Policy performance targets apply to all four Ministry for the Environment Departmental Multi-category Appropriations (MCAs) and therefore it is more meaningful to aggregate these targets across these output classes. The full set of measures, including targets for 2014/15 and relevant notes are published under the Ministerial Services appropriation.

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Current and Past Policy Initiatives#

Policy Initiative Year of
First
Impact
2013/14
Budgeted
$000
2014/15
Budget
$000
2015/16
Estimated
$000
2016/17
Estimated
$000
2017/18
Estimated
$000
Reforming the Freshwater Management System 2014/15 - 5,000 3,000 2,000 2,000
Reforming the Resource Management System 2014/15 - 3,000 - - -
Funding transferred for Clean-up of Upper Waipa River. 2013/14 (100) (100) (100) (100) (100)

Reasons for Change in Appropriation#

The increase in this multi-category appropriation for 2014/15 is due to:

  • $3 million to support improvements to the freshwater management framework through effective implementation, including the provision of tools, guidance, and support to councils to ensure high quality water plans
  • $3 million for support and guidance for councils and practitioners as they implement the Resource Management Act reforms
  • $2 million to build science and economics knowledge and capability through the development of the science underpinning the attributes for the National Objectives Framework, and understanding the environmental and economic impacts associated with these attributes.

Mitigating Environmental Hazards and Waste (M29)#

Overarching Purpose Statement#

The overarching purpose of this appropriation is to provide policy advice and other support to Ministers focusing on reducing harm from natural, chemical and biological hazards and from waste through more effective management frameworks.

Scope of Appropriation#

Departmental Output Expenses

Environmental Hazards and Waste Policy Advice
This category is limited to the provision of advice (including second opinion advice and contributions to policy advice led by other agencies) to support decision-making by Ministers on government policy matters relating to the risks posed by environmental hazards and waste, including international agreements, conventions and obligations.
Waste Management and Minimisation
This category is limited to operational advice, implementation of tools, frameworks and institutions, and support, information and guidance to stakeholders in relation to waste management and minimisation.

Expenses, Revenue and Capital Expenditure#

  2013/14 2014/15
  Budgeted
$000
Estimated Actual
$000
Budget
$000

Total Appropriation

- - 3,450

Departmental Output Expenses

     
Environmental Hazards and Waste Policy Advice - - 1,365
Waste Management and Minimisation - - 2,085

Funding for Departmental Output Expenses

     

Revenue from the Crown

- - 3,450
Environmental Hazards and Waste Policy Advice - - 1,365
Waste Management and Minimisation - - 2,085

Revenue from Others

- - -
Environmental Hazards and Waste Policy Advice - - -
Waste Management and Minimisation - - -

Comparators for Restructured Appropriation#

  2013/14 2014/15
Vote, Type and Title of Appropriation Budgeted
$000
Estimated Actual
$000
Budget
$000
Vote Environment      
Departmental Output Expenses      
Environmental Hazards and Waste Policy Advice 1,490 1,490 1,365
Waste Management and Minimisation 2,411 2,411 2,085
Total 3,901 3,901 3,450

The previous MCOA Mitigating Environmental Hazards and Waste has been converted to an MCA.

What is Intended to be Achieved with this Appropriation#

This appropriation is intended to achieve policy advice and other support to Ministers with a focus on ensuring that the frameworks for the management of chemical and biological hazards and waste protect people and the environment, and are effective without unnecessarily constraining economic growth.

How Performance will be Assessed for this Appropriation#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard

Mitigating Environmental Hazards and Waste

     
Changes in the incident data compiled by the Environmental Protection Authority and enforcement agencies under the Hazardous Substances and New Organisms Act. Reduced number of incidents Hazardous substances: 29 per cent decrease in total number of reported incidents since 2009/10. No level four and five incidents reported. Reduced number of incidents
Trends in tonnage of waste disposed of at waste disposal facilities per unit of GDP. Downward trend Downward trend (17.6 tonnes per $1 million GDP (projected) for the year ending June 2013 versus 18.6 tonnes per $1 million GDP for the year ending 30 June 2010) Downward trend

What is Intended to be Achieved with each Category and How Performance will be Assessed#

  2013/14 2014/15
Assessment of Performance Budgeted
Standard
Estimated Actual
Standard
Budget
Standard

Mitigating Environmental Hazards and Waste

     

Departmental Output Expenses

     
Environmental Hazards and Waste Policy Advice
     
This category is intended to achieve quality policy advice to Ministers in relation to the hazardous substance management regime to help New Zealand businesses be safe, sustainable and successful. The framework deals with risk without creating barriers to innovation.      
Percentage of agreed deliverables in relation to the chemical and biological risk management framework that are completed within agreed timelines. (See Note 2) 100% 100% 100%
Waste Management and Minimisation
     
This category is intended to achieve quality policy advice to Ministers to ensure the framework for waste minimisation and management protects the environment while creating opportunities for New Zealand manufacturers to develop innovative and efficient processes to reduce waste.      
An increase in the total number of voluntary product stewardship schemes that have sought accreditation from the Minister for the Environment. Upward trend Upward trend Upward trend
Percentage of product stewardship scheme applicants satisfied (or better) with the timeliness and quality of advice received from the Ministry throughout the course of their application. 80% satisfied or better 100% satisfied or better 80% satisfied or better
Secretariat functions for the Waste Advisory Board are undertaken in accordance with the Board's terms of reference and their annual work programme. Achieved Achieved Achieved

Note 1 - Policy performance targets apply to all four Ministry for the Environment Departmental Multi-category Appropriations (MCAs) and therefore it is more meaningful to aggregate these targets across these output classes. The full set of measures, including targets for 2014/15 and relevant notes are published under the Ministerial Services appropriation.

Note 2 - Deliverables are agreed between the Minister and the Ministry and set out in the Output Plan.

End of Year Performance Reporting#

Performance information for this appropriation will be reported by the Ministry for the Environment in its Annual Report.

Reasons for Change in Appropriation#

The decrease in this multi-category appropriation for 2014/15 is primarily due to a reprioritisation of funding towards Environmental Reporting.